DmB \\
(w Commonwealth ECson i Byrrn NucinrStition e
[
/ 4450 North GIrmIn Church R:ad
\\
O J Byron, Illinois 61010
\\
July 11,1985 LTR:
BYRON 85-0997 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 61057
SUBJECT:
Supplementary Report on the Main Steam Isolation Valve Airline Check Valves
REFERENCE:
1)
Notification of Potentially Defective Airline Check Valves Pursuant to 10CFR21 from R.E. Querlo to J.G. Keppler, dated March 21,1985 2)
Byron Letter 85-0589, R.E. Querio to J.G. Keppler, dated April 19,1985
Dear Mr. Keppler:
4 This letter is to notify you of the change in testing schedule from bi-weekly to bi-annually for the subject check valves. This is based on six successive satisfactory tests since the installation of the CPI Model No. 8F-C8L-10-D, brass check valves. The testing interval will continue until Unit One's second refueling. Currently, the permanent stainless steel check valves are.5cheduled to be installed in the late 1985 timeframe.
The change in testing interval was discussed with W. Forney at an NRC/ CECO Management Meeting held July 2,1985. Verbal concurrence was given by Kevin Connaughton, Resident Inspector, on July 5,1985.
/'
- y&&
R.E. Querlo Station Superintendent Byron Nuclear Power Station REQ /JEL/gt cc:
J. liinds, NRC Res. Insp.
M. Robinson T. Malman W. Dijstelbergen V. Schlosser D. Elias D. Galle D. Shelton R. Plenlewicz J. F. Gudac
- 19/024 8507310020 850711 gDR ADOCK 05000454 JUL 2 41985,l g PDR
(
NOl
.