ML20126K948
| ML20126K948 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/15/1981 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Clark R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20126K952 | List: |
| References | |
| NUDOCS 8105270088 | |
| Download: ML20126K948 (1) | |
Text
e
. :D%,
Omaha Public Power District 1623 MARNEY e OMANA. NEBRASKA 68102 s TELEPHONE S36 4000 AREA CODE 402 May 15, 1981 sf' g
Director of Nuclear Reactor Regulation 5
2
(
,9 5.;/
I ATTN: Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3
~
i ?,' VM "6 pg'p --10.'
11 n
U. S. Nuclear Regulatory Commission Washington, D.C.
20555
\\b.5 M
- v
Reference:
Docket No. 50-285 y
^
y _gp Gentlemen:
,;,jirv Attached is one copy each of two sets of revision pages for in-corporation into the Commission's copy of the Fort Calhoun Station Unit No.1, Ten Year In-service Inspection (ISI) Plan.
The changes on pages 146, 187, 191, and 193 are the result of ISI examination credit taken on inspections performed to satisfy the re-quirements of IE Bulletin 79-17. This eliminates duplication of efforts and maintains the appropriate number of weld examinations to be con-ducted each ten years.
The changes on pages 168, 179, 188, 189, Figures B-33, B-37, B-39, B-40, C-56, C-58, and C-61 account for errors in the location and/or number of welds on a given piping system as determined by field survey. Changes on pages B-32 and B-42 correct errors in listed calibration blocks for use in the examinations of these piping systems. The changes on page 173, Figures A-1, B-22a, and B-43 in-corporate information obtained during the 1980 refueling outage.
Sincerely, W. C. Jones Division Manager Production Operations WCJ/KJM/TLP:jmm Attachment cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
ON Washington, D.C.
20036 5
///
8105210O Q
_L
..