ML20126K653
| ML20126K653 | |
| Person / Time | |
|---|---|
| Issue date: | 10/01/1982 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeppesen D SANDIA NATIONAL LABORATORIES |
| Shared Package | |
| ML20126J781 | List:
|
| References | |
| FOIA-84-863 NUDOCS 8506190303 | |
| Download: ML20126K653 (1) | |
Text
f
[ ""%,
UNITED ST ATES NUCLEAR REGULATORY COMMISSION a.
REGION IV 8
611 RY AN PL AZA DRIVE, SUITE 1000 9,,
,8 ARLINGTON TEX AS 76011 OCT 011982 Sandia National Laboratories ATTN:
Mr. David M. Jeppesen Systems Safety Information Division 4445 Albuquerque, NM 87185 Gentlemen:
The following documents are enclosed:
1.
ITT Barton " Design Qualification Test Procedure for ITT Barton 763 Gage Pressure and 764 Differential Pressure Electronic Transmitters for Class 1E Service in Nuclear Power Plants," Revision 02.
IT.T. Ba~ ton " Design Qualification Test Plan for ITT Barton Models 580A 2.
rand 583A Switches for Class 1E Service In Nuclear Power Plants,A 581A, ion 01.
Revis Please have your staff review these documents and return the documents and your comments to us by October 22, 1982.
Although ITT Barton has not " stamped" the enclosed documented as proprietary, please treat them as such.
If you have any questions concerning this matter please contact Al Smith at FTS 728-8217.
Sincerely, hA hw Uldis Potapovs, ChiefL Vendor Program Branch 03 g3o327
^863 PDR g
-