ML20126J777

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Documents & Info Re NUREG/CR-3597,SAND 84-0938,NUREG/CR-3418,SAND 83-1617, & Board Notification 84-32.App B & App C Documents Available in Pdr.Review of Addl Documents Continuing
ML20126J777
Person / Time
Site: Browns Ferry, Grand Gulf, Sequoyah, Clinton, 05000000
Issue date: 03/27/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Curran D
HARMON & WEISS
Shared Package
ML20126J781 List:
References
FOIA-84-863, REF-QA-99900283, REF-QA-99900900, REF-QA-99900902, REF-QA-99900903, REF-QA-99900921, RTR-NUREG-CR-3418, RTR-NUREG-CR-3597 NUDOCS 8506190081
Download: ML20126J777 (8)


Text

aacg m

o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

E I

g...../

o'M wAsWNGTON, D. C. 20666 E

Diane Curran, Esquire Harmon, Weiss & Jordan 2001 S Street, NW Suite 430 IN RESPONSE REFER Washington, DC 20009 TO F01A-84-863

Dear Ms. Curran:

This is in further response to your letter dated November 16, 1984, in which you requested, pursuant to the Freedom of Information Act, five categories of documents and information related to NUREG/CR-3597, SAND 84-0938, RV; NUREG/CR-3418, SAND 83-1617, RV; and Board Notification 84-032'.

By letter to you dated December 11, 1984, with its attached Appendix A, we informed you that documents listed in the appendix had been placed in the NRC Public Document Room (PDR) at 1717 H Street, NW, Washington, DC, in folder F01A-84-863 under your name. The enclosed Appendix B is a listing of additional records subject to your request which are available in other PDR files. Enclosed Appendix C is a listing of records subject to your request that will be filed in the PDR in folder F01A-84-863 under your name.

The NRC has not completed its review of the remaining documents subject to your request. We will respond again as soon as our review is complete.

Si erely, J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 8506190001 850327 PDR FOIA CURRAN 84-863 PDR L

l Document Description Accession Number i*

i 1.

Wyle Laboratories - Eastern Operations 8309130247, 8309130243.8309130242 j

Report No. 99900902/82-08 i

2.

Isomedix Incorporated t

8303070037.8302070044 Report No. 99900913/87-02

{

3.

Southwest Research Institute 8303010498.8303010488.8303010482 j

Report No. 99900909/82-04 i

4.

Limitorque Corporation 8303180394.8303180390.8303180399 Report No. 99900904/82-02 I

5.

Georgia Tech 8303040562.8303040572

{

Report No. 99900903/82-02 6.

National Technical Systems (NTS)'- Sau9us l

Report No. 99900907/83-01 830'3280314.8303280308.8303280320 l

7.

Wyle Laboratories - Western Operations Report No. 99900905/83.01 8305050262.8305050258.8305050255 l

S.

Westinghouse Electric Corporation - Forest Mills Report No. 99900900/83-01 8304070341.8304070346 9.

General Electric Compan (SE) -

8305050115.8305050117 Report No. 99900911/83 1

10. Conax Corporation Report No. 99900323/83-01 8305050184,835050181.8305050192

'\\

l

11. 81W Cable Systems. Inc.

l Report No. 99900283/83-01 8305090406.8305090393.8305090413 1

12~.

Wyle Laboratories - Eastern Operations 8306210020 l

Report No. 99900902/83-01 4

13*

p,rt No 9

1/ -01 8308150332.8308150335.8308150330 l

14. Westinghouse. AE50 83102505541 Report No. 99900920/03-01 i

15.

T h83-01 8307180157.8307180181 i

i

16. SE Report No. 99900911/83-02 8308030181 -

4

17. Franklin Research Center j

Report No. 99900921/83-01 8306210286.830621'0274.8306210282

18. International Nutronics Inc.

Report No. 99900922/83-61 8307120293 1

19. Radiation Ster 111:ers. Inc.

Report No. 99900924/83-01 8309300213.8309300212.8309300215

20. Farwell and Hendricks. Inc.

8310250201.8310250206 Report No. 99900918/83-01

Re: FOIA-84-863

21. process Technology

, Report No. 99900908/83-01 8309160250.8309160256

22. Rockbestos Report No. 99900277/83-02 and 04 8401130372.8401130375.8401130372 Ref: FOIA 84-441 for complete information 8401130376
23. Wyle Laboratories - Eastern Operations Report No. 99900902/83-02 8310180455
24. Acton Environmental Testing Corporation 8311220501 Report No. 99900912/83-01
25. Nuclear Qualification Services Report No. 99900926/83-01 8310250441.8310250435.8310250447
26. Westinghouse Electric Corporation - Forest Hills Report No. 99900900/83-02 8311070225
27. Wyle Laboratories - Eastern Operations Report No. 99900902/83-03 8310250385 i
28. Research Dynamics. Inc.

Report No. 99900930/83-01 831205364.8312050370.8312050360

29. Fame 11 and Hendricks. Inc.

Report No. 99900918/83-02 8312050460

30. 81W Cable Systess, Inc.

~

Report No. 99900283/83-02 8401130034.8481130041

31. Westinghouse Electric Corporation - NSID Report No. 99900900/83-03 8311220320
32. Westinghouse Canada. Inc.

Report No. 99900929/83-01 8312160287.8312160293

33. General Electric Report No. 99900911/83-03 8312160198.8372160204
34. Acton Environmental Testing Corporation Report No. 99900912/82-02 8301100093'.83011 00096*

35.

National Technical Systems (NTS) - Washington, D.C. Division Report No. 99900914/83-01 8304080328,8304080330 M.

Sa 2

99 24/83-01 8309300213.8309300212.8309300215

37. Radiation Technology 8405080033'.8405080635'.8405080036 Report No. 99900916/83-01 8405080037 t

i 38.

s No 99900277/83-01 8

OW.8310250127.8310250136 l

l

Re: F01A-84-863 Aopendix C Wyle Program Review Oct. 25-29, 1982 1.

10/25-29-82 QA Program (14 pages) 2.

10/15/82 Letter from U. Potapovs NRC, to Wyle Laboratories, E. W. Smith,Re: Confirming agreements. (1 page) 3.

10/13/82 Letter from TVA, L. M. Mills, to V. Potapovs, NRC Re:

Responding to letter from R. C. Lewis, NRC, REGION II. (6 pages) 4.

3/25/83 Notes on call of 3/25/83. (9 pages) 5.

3/24-25/83 Notes on telephone calls on those dates. (4 pages) 6.

1/14/83 Letter from Comonwealth Edison, F. G. Dentine, to H. R. Denton, NRC, Re: 12/14/82 letter from S. A. Varga to L. O. DelGeorge. (12 pages)

Georgia Tech Program Review Dec. 13-16, 1983 7.

11/12/82 Notes on telecon from G. Hubbard to B. Kirkland Re: Q. A. Prog-rammatic Audit. (1 page) 8.

12/1/82 Notes on telecon from G. Hubbard to A. Hardin Re: EQ Inspec-tion at Georgia Tech. (1 page) 9.

12/1/82 Notes on telecon from G. Hubbard to B. Kirkland, Re: EQ Pro-grammatic Audit. (1 page) 10.

12/1/82 QA ProgramLetter from J. L. ges)

(15 pa 11.

12/1/82 Russell, Jr. GIT, to G. Hubbard, NRC-RIV. (1 oage) 12.

12/6/82 Letter from U. Potapovs, NRC to R. S. Kirkland, GIT Re: Con-finn telecon of 12/1/82. (1 page) ing Schedule. (1 pagej 13.

12/13/82 Outline Re: GT Entrance Meet 14.

12/16/82 Memo from J. J. Benson, SNL to G. Hubbard, NRC, Re: Program-matic~ Audit of Frank H. Neely, Nuclear Research Center, Georgia Institute of Technology, Dec. 13-16,1982. (3 pages) 15.

2/15/83 QA Program (14 pages) 16.

2/21/83 Memo from Jack Benson, Sandia Labs to George Hubbard, USNRC -

R IV Re: Review of the First Revision to the Georgia Tech Quality Manual. (1 page)lecon of 2/22/83 from G. Hubbard to J. Russell with 17.

2/22/83 Note on te GITs Hot Cell QA Manual. (14 pages) 18.

3/1/83 Quality Assurance Manual for Hot Cell Operations dated 3/1/83. (13 pages) 19.

3/9/83 Letter from U. Potapovs, NRC to J. L. Russell, Jr, GIT, Re:

Response to letter of 2/23/83 with copy of letter attached. (2 pages) l 20.

4/14/83 Letter from U. Potapovs, NRC to GIT, J. L. Russell, Jr, with several attachments. (149 pages) 21.

Undated A. Nuclear Research Center Storage Pool and Hot Cell. (11 pages) 22.

Undated QA Program (15 pages) tes.

23.

Undated 5 pages of undated no NTS Hartwood, VA 24.

1/24/83 NTS Hartwood, VA Beginning.... (7 pages)l Technical Systems 25.

10/12/83 Letter from U. Potapovs, NRC-to Nationa W. Ison, Re: Response to letter of 3/22/83. (2 pages) 26.

Undated QA Program (24 pag'Exa) mined. (2 pages) es 27.

Undated List of Documents j

l l

F0IA-84-863 NTS Saugus 28.

12/27/82 Travel P1ans for A. L. Smith and G. Hubbard.(2 pages) 29.

1/10-14/83 QA Program.(14 pages) 30.

1/14/83 Memo from J. J. Benson Sandia Labs to G. Hubbard, Re: Pro-gramatic Audit of National Technical Systems (NTS), Saugus Facil-ity, Saugus, Calif, Jan10-14,1983. (3 pages) 31.

2/11/83 Unsigned notes.(1 page) 32.

4/20/83 Letter from U. Potapovs, NRC to NTS, W. L. Traw, Re: Response to letter of 3/9/83.(4 pages) 33.

Undated QA Program. (14 pages) 34.

Undated List of Documents Examined (2 pages) 35.

Undated Notes.(16 pages)

Westinghouse Nuclear Tech. Div., Forest Hills 36, 1/26/82 Notes on Westinghouse Forest Hill Facility.(18 pages) 37.

12/6/82 Letter from U. Potapovs, NRC to R. J. Slember, Westinghouse Electric Corporation, Re: Confirm telecon on 11/12/82.(1 page) 38.

Undated QA Program-Hubbard.(14 pages) 39.

Undated QA Program-Bustard.(14 pages) 40.

Undated QA Program-Breaux. (14 pages)

Bailey Controls Program Review EQ Portion of Report Feb. 14-18, 1983 41.

1/26/83 Letter from U. Potapovs, NRC to Bailey Controls Co.,M. A. Keyes, Re: Confirm telecon of 1/6/83.(1 page) 42.

2/18/83 Memo from Jack Benson, Sandia Labs from G. Hubbard, USNRC.(5 pages).

43.

Undated QA Program.(14 pages) 44.

2/18/83 QA Program Benson.(14 pages) 45.

Undated List of Documents Examined.(2 pages) 46.

2/16/83 Notes, Re: Qualification Projects in Process.(1 page) 47.

2/16/83 Notes, Ed Shields.(1 page) 48.

2/17/83 Notes, Robert J. Wolff.(1 page) 49.

Unda5.ed 5 pages undated notes.

Neutron Products 50.

3/17/83 Letter from U/ Potapovs, NRC to Neutron. Products, J. A. Ranoschoff, Re: Confirm telecon of 3/11/83.(1 page)

Westinghouse AESP 51.

3/4/83 3 pages of notes East-West Technology 52.

3/15/83 Attendance List.(1 page) 53.

3/28/83 Letter from U. Potapovs, NRC to East-West Technology, A. G. Davis, Re: confirm telecon of 3/22/83.(1 page)

I

F0IA-84-863 54.

4/18-22/83 55.

Notes on East-West Technology. (3 pages) 9/30/83 Acknowledgment letter from U. Potapovs, NRC to A. G. Davis, with 8/2/83 letter from L.M. Davis attached. (4 pages) 56.

Undated Travel plans for A. Smith'.(4 paces) 57.

Undated Letter from J. Letz, Sandia Lab 5 to A. Smith, NRC, Re: Audit of East-West Technology Corp. Quality Assurance Program and Implementation Status.(3 paces)

.o8.

Undated Information on East-Weit Technology Corp (1 page) 59.

Undated 2 pages of notes.

00.

Undated QA Program annotated.(14 pages) 61.

Undated 5 pages of notes.

62.

Undated QA Program annotated.(14 pages)

Franklin Research Institute 63.

3/23/83 Letter from Philadelphia Electric Co. to R. C. DeYoung, NRC Re: Notification of Existence of a Potential Defect per 10CFR21.21(6 page 64.

4/4/83 Letter from U. Potapovs, NRC to Franklin Research Center Re:

~

Confirm telecon of 3/28/83.(1 page) 65.

Misc.

QA Administrative Instructions: 1-1, 9/1/83; 2, 5/4/79; 4, 5/4/79; 4-1, 9/1/83; 4-1, 9/1/83; 4-2, 9/1/83; 9, 5/4/79; 9-2, 9/1/83; 9-1, 9/1/83; 14, 5/4/79; 14-1, 9/1/83; 16-1, 6/24/83; 17, 5/4/79; 17-1, 4/5/82; 18, 5/4/79.(77 pages) 66.

6/9/83 Letter from Franklin Inst. to Phila. Elec. Re: Qualification Testing of Electrical Switches, FIRL Project No. A5653 (1 page) 67.

6/15/83 Letter from Phila. Elec. to Franklin Inst. Re: Qualification Testing of Electrical Switches Specification E-3424 PBAPS Units 2 & 3 FIRL Test Plans P-A5653-1, P-A5653-2, P-A5653-3.(1 page) 68.

6/ 27/83 Letter from Franklin Inst. to U. Potapovs, NRC Re: Notice of Nonconfonnance dated 6/1/83. (2 pages) 69.

8/5/83 Acknowledgement letter from U. Potapovs, NRC to Franklin Inst, with 7/5/83 letter attached.(2 pages) 70.

9/1/83 Letter from Franklin Inst. to G. Hubbard, NRC, Re: 6/27/83 A. Saggiomo to U. Potapovs. (2 pages) 71.

4/25-29/83 Miscellaneous notes. (9 pages) 72.

Undated 2 pages notes.

73.

10/27/82 Telephone Memorandum. (1 Meeting Agenda. (1 page) page)

, 74.

4/25/83 75.

Undated TER Equipment Item Nos. 8 thru 13. (1 page) 76.

Undated QAP 15-1. (1 page) 77.

4/25-29/83 QA Program - Al Smith. (23 pages) i 78.

Undated QA Program - Hubbard..(14 pages) 79.

Undated QA Program - Larry Bustard. (14 pages) 80.

3/15/83 1 page of notes.

81.

Undated Pages 2 & 3 of Report No. 99900921/83-01.

82.

4/26/83 1 page of notes.

83.

4/26/83 1 page of notes.

84.

4/27/83 2 pages of notes.

85.

4/28/83 2 pages of notes.

86.

Undated 22 pages of Miscellaneous notes.

l l

{

i

~

F0IA-84-863 Nuclear Qualification Services 87.

1/23/84 Letter U. Potapovs, NRC to Nuclear Qualification Services in response to letters of 10/28 and 12/21 in 1983. (26 pages) 88.

7/14/83 Letter U. Potapovs, NRC to Nuclear confirm telecon of 6/17/83. (1 page) Qualification Services to 89.

7/19-20/83 QA Program (14 pages) 90.

7/19/83 Notes (1 page) 91.

7/20/83 Notes (1 page) 92.

7/20/83 Notes (1 page) 93.

11/11/83 Notes (1 page) 94.

Undated Notes (1 page) 95.

Undated Notes (1 page) 96.

Undated Memo Jack Benson to George Hubbard, NRC (2 pages) 97.

Undated Notes (1 page) 98.

Undated Notes (2 pages)

BIW Response 99.

3/2/84 Letter from U. Potapovs, NRC to BIW Cable Systems, Inc. in response to letter of 1/13/84 (2 pages) 100.

1/13/84 Letter to Region IV, NRC from E. Manchester, Jr. of BIW in res-ponse to letter of 12/16/83. (2 pages)

-101.

4/2/84 Letter to Region IV, NRC from BIW Re: letter of 3/2/84. (2 pages) 102.

8/6/84 Letter from G. Zech, NRC to BIW re: letters of 1/13/ & 4/2/84. (2 pages) 103.

8/16/84 Letter from BIW to G. Zech, NRC re: response to NRC letter of 8/6/84. (9 pages) 104.

9/10/84 Acknowledgement letter from G. Zech, NRC to BIW.(1 page) 105.

10/2/84 Letter from BIW to G. Zech, NRC re: letter of 9/10/84. (1 page) 106.-

11/5/84 Letter from BIW to G. Zech, NRC. (1 page) 107.

Undated Outline (2 pages)

GE Equip. Qual. Prog.

108.

Feb. 7-10 Trip Report (_8 pages) 109.

9/29/83 QA Program (14 pages) 110.

Undated Notes (15 pages )

111.

Undated Notes (44 pages )

GE Valley Forge & San Jose 112.

3/9/83 Letter U. Potapovs, NRC to GE to confirm telecon of 3/2/83 (1 page) 113.

3/17/83 Letter from U. Potapovs, NRC to GE to confirm telecon of 3/11/83 (1 page) 114.

4/20/83 GE/ Customer Meeting Record (1 page)

.115.

6/3/83 Letter from U. Potapovs, NRC to GE with letter from GE dated 5/10/83 attached (4 pages) 116.

5/2/83 Letter from GE to U. Potapovs, NRC re: NRC Inspection, Dated 2/7-11/83 of GE Environmental Qualification Activities Docket No. 99900911 (5 pages) 117.

1/12/84 Letter from U. Potapovs, NRC to GE re: response to NRC letter of 11/17/83 (3 pa Notes (4 pages)ges) 118.

Undated 119.

Undated Deviation Log (2 pages.)

~.

Re: F0!A-84-863 Additional Documents 120.

10/1/82 Memorandum U. Potapovs to D. Jeppesen Re: Southwest Research Institutes' (SWRI) test plan: " Nuclear Qualification Test Plan for the Generic Equipment Qualification for Grand Gulf I and Clinton I Nuclear Power Stations" (1 page) 121.

10/1/82 Memorandum U. Potapovs to D. Jeppesen Re: ITT Barton test and qualification plans and procedures for Class lE Service components (1 page) 122.

4/28/83 NRC Internal Memo from H. S. Phillips to R. L. Bangart,

Subject:

Review of Region IV - Department of Energy Agreement FIN No. B-3101(2 pages) 123.

12/13/82 NRC Form 189 for EQIP (7 pages) 124.

1983 Sandia Annual Report for FY 1983 Including identification of facilities where inspections were performed and notes in margins of report identify facilities used as examples (14 paaes) 125.

1983 Monthly status report for FY 83 dated November 12, 1982; December 13, 1982; January 17, 1983; February 15, 1983; March 18,1983; April 25,1983; May) 25,1983; September 16, 1983; and October 19,1983(20 pages 126.

1983 FY 83 EQIP Sumary Sheet '(1 page)

.. _