DEC. 21 1992 Docket No. 50-293 Mr. Roy A. Anderson Senior Vice President-Nuclear Pilgrim Nuclear Power Station Ik>ston Edison Company RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360
Dear Mr. Anderson:
Subject:
Management Meeting On December 17, 1992, Mr. D. Long and other members of your staff met with Mr. R. Keimig and other NRC staff members at the NRC Region I office in King of Prussia, Pennsylvania. The meeting was requested by your staff to discuss several matters related to the physical security program at the Pilgrim Nuclear Power Station. A list of attendees is enclosed with this letter.
The principal matters discussed during the meeting were: (1) the plans for the construction of an Engineering / Support building and the impact that the construction will have on plant security; (2) the status of the installation of the new security diesel and modifications to the security backup power supplies; and (3) the status ol *he procurement and installation of a new security computer system.
Details of our discussions are deemed to be Safeguards Information and are exempt from public disclosure in accordance with 10 CFR 73.21. We appreciate your staff's initiative in requesting the meeting and their efforts in compiling the information that was presented. We found the meeting beneficial in providing the NRC with a comprehensive overview of existing and planned security program activities.
5
(,000 b-OFFICI Al, RECORD COPY A:PILMM December 21,1992
)
l l
9301070012 921221 1
PDR ADOCK O*000293 W,id 4I I
F PDR
__J
..... _ ~. -.
DEC, 2 i1992
... Boston Edison Company.
2 No response to this letter is required. Your cooperation with us is appreciated.
Sincerely, Ori0ir' m
' Dy; James H. soynor James H. Joyner,' Chief Facilities Radiological Safety.
and Safeguards Branch -
Division of Radiation Safety and Safeguards -
Enclosure:
As Stated OFFICIAURECORD COPY A:PILMM
' December 21,:1992 ~
e s-mf M
- DEC. 21 1992 Boston Edison Company 3
cc w/ encl:
E. Boulette, Vice President, Nuclear Operations and Station Director E. Kraft, Plant Manager V. Oheim, Manager, Regulatory Affairs Department
- D. Tarantino, Nuclear Information Manager N Desmond, Compliance Division Manager R. IIallisey, Department of Public Health, Commonwealth of Massachusetts R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts The Honorable Edward M. Kennedy The Honorable John F. Kerry The Honorable Edward J. Markey The Honorable Edward P. Kirby The Honorable Peter V. Forman B. Abbanat, Department of Public Utilities Chairman, Plymouth Board _of Selectmen j
Chairman, Duxbury Board of Selectmen j
Paul W. Gromer, Massachusetts Secretary of Energy Resources
~
Plymouth Civil Defense Director.
Sarah Woodhouse, Legislative Assistant A. Nogee, MASSPIRG Regional Administrator, FEMA Of6ce of the Commissioner, Massachusetts Department of Environmental Quality Engineering Of6ce of the Attorney General, Commonwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy Public Document Room (PDR)
Local Public Document Room (LPDR)
Nudear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth'of Massachusetts, SLO Designee l
L OFFICIAL RECORJ COPY A:PILMM December 21,1992-li F
'4 DEC. 21 1992 Boston Edison Company 4
bec w/ encl:
Region i Docket Room (with concurrences and IFS Forms)
DRS/El3 SALP Coordinator J. Linville, DRP
_ E. Kelly, DRP J. Macdonald, SRI - Pilgrim (with concurrences and IFS Forms) 1 W. Butler, NRR R. Eaton, NRR V. McCree, OEDO RI:DRSS RI:DRISS RI:DRSS King Ke ig
)
12#792 12/ /92 12t/9_ 2
. Al OFFICIAL RECORD COPY A:PILMM December 21,1992
Attachment j
Meeting Attendees i
llegon Iklison Company D. Long, Division Manager
{
J. Neal, Security Section Manager
{
T. Nicholson, Security Administration Division Director j
R. McMahon, Senior Instrumentation and Controls (l&C) Engineer U.S. Nuclear Regula10Iy Commission R. Keimig, Chief, Safeguards Section, Division of Radiation Safety and Safeguards (DRSS)
D. Limroth, Senior Reactor Engineer, DRSS E. King, Physical Security Inspector, DRSS l
t s
i t
i i
$