Notice of Violation from Insp on 850509-24
ML20126J289
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/06/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20126D306 List:
References
50-373-85-16, 50-374-85-16, NUDOCS 8506180578
Download: ML20126J289 (1)


Text

. _ _ _ _ _ _ _ _ _ _

l Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-373 l

Docket No. 50-374 As'a result of the inspection conducted on May 9, 13-14, May 20-22, and May 24, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions, (10 CFR Part 2 Appendix C), the following violation was identified:

10CFR50.55a(g)requiresthatlicenseesimplementaninservicetesting program for pumps and valves per the requirements of Section XI of the i

ASME Code unless specific relief has been granted by the Commission.

Subsection IWP-4510 Table IWP-3100-2, and Subsection IWP-4160 of Section XI of the ASME Code states in part, that vibration amplitude be measured, trended and analyzed per the criteria delineated in the referenced table and that provisions shall be made to duplicate the measurement position i

for those instruments which are position sensitive.

Contrary to the above, the licensee was not obtaining vibration data per the testing method described in the ASME Code or the alternate testing described in their inservice testing program submittal to the Commission.

In addition, the locations for vibration measurements were not explicitly marked on the pumps so that measurement position could be duplicated, j

ThisisaSeverityLevelIVviolation.(Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this j

office within thirty days of the date of this Notice a written statement or i

explanation in resly, including for each item of noncompliance:

(1)cor-rective action ta(en and the results achieved; (2) corrective action to be l

taken to avoid further noncompliance; and (3) the date when full compliance l

will be achieved. Consideration may be given to extending your response time j

for good cause shown.

l JUN 6W

,}

i Dated f

is A.'ReyeM/ Chief

}

j perations sydnch i

i I

I i

g!"*J M N #