Forwards Insp Repts 50-245/92-31,50-336/92-34 & 50-423/92-30 on 921207.No Violations Noted.Operations Conducted Safely, in Accordance W/Regulatory Requirements & in Most Instances in Accordance w/licensee-approved Procedures
ML20126H062
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/29/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20126H064 List:
References
NUDOCS 9301050056
Download: ML20126H062 (3)


See also: IR 05000245/1992031

Text

.

>a

ACh

December 29, 1992

DAket Nos. 50-245

50-336

50-423

. Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270 ,

Hartford, Connecticut 06141-0270

L

! Dear Mr. Opeka:

SUBJECT: COMBINED INSPECTION REPORT NOS. 50 245/92-31, 50-336/92-34,

50-423/92-30

This letter refers to the safety inspection which Mr. T. Fish, L. Briggs, and C. Sisco

conducted the week of December 7,1992, at the three Millstone Units. The enclosed report

discusses the findings and observations the inspectors made during the week's activities.

l

L The inspection was in the area of plant operations and was modeled after the techniques of

major team inspections, but on a smaller scale. The primary objective was to ensure that the

. facilities' operations departments conducted activities in a safe manner and in accordance with

both regulatory requirements and licensee approved procedures.

Within the scope of this inspection, no violations were obscrved. ' Operations were conducted

safely, in accordance with regulatory requirements, and in most instances in accordance with -

licensee-approved procedures, Examples where operations personnel did not adhere to .

- facility procedures were primarily in certain areas of the administrative control of operator

aids and clearances. Other observations uncovered outdated tire detector location maps in

fire panels and weak procedura.1 guidance in two surveillances. The Unit directors committed

to reviewing the inspectors' observations and correcting deficiencies where warranted.

.

OFFICIAL RECOPD COPY G:TFMILLST

E 9301050056 921229

. . PDR ADOCK 05000245'

G PDH

-

1

.MC/ .

-

. ~ . - .. ..

, . . . .

' , ,
1

,

2' December 29,1992l

- Mr. John F,- Opeka

' No reply to this lettcr is required. Your cooperation with us in this matter is appreciated.--

Sincerely,

1

-'

Lee H. llettenhausen, Chief-

Operations llranch .

Division of Reactor Safety

Enclosure: NRC Region 1 Combined Inspection Report Nos.

50-245/92-31, 50-336/92-34, 50 423/92-30

cc w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

J. S. Keenan, Nuclear Unit Director

11. F. liaynes, Nuclear Unit Director *

C. H. Clement, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing ,

D. O. Nordquist, Director of Qualhy Services

-

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

p K. Abraham, PAO (2) All Inspection Reports

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

State of Connecticut SLO

-

'

-

'

OFFICIAL RECORD COPY ~ GiTFMILLST

1

P

f

i

w gs ---w m w ge e

. 1,

!

!

.i

,

December 29,-19921

r Mr. John F. Opeka 3

bec w/cnc1:

Region 1 Docket Room (with concurrences)

L. llettenhausen, DRS

R. Conte, DRS *

T. Fish, DRS

~ J. Joyner, DRSS

R. Illough, DRP

L. Doerflein, DRP -

DRS/ Ell SALP Coordinator

DRSS SALP Coordinator

W. Raymond, SRI,- Iladdam Neck

V. McCree, OEDO

O. Vissing, PM, NRR

P. Swetland, SRI, Millstone

V. McCrec, OEDO

D. Jaffe, PM, NRR

V. Rooney, PM, NRR

R. Barkley, DRP -

DRS Files (3)

.

RI:DRS RI:DRS RI:DRS

Fish /ajk Conte nhausen

p A lu, p sjg

12/D/92 12hs/92 2fA92

OFFICIAL RECORD COPY G:TFMILLST