{{#Wiki_filter:, - e NRC MONTHLY OPERATING REPORT DOCKET NO. 50-_5_2_8__ . UNITDNAME_EENGJ~)-1_____ ATE __04_T_0_8_ 85 _ __ COMPLETED BY__h_P_._Ri_chardson TELEPHONE __,602-932_5_31 3 Ext. 6593 = . - - - . OEERSIING SIBIUS

1. Unit Name: ~Palo Verde Nuclear Generating Station, Unit 1 Reporting Per i odI]MarHT9M~~~-{~~~--))]~]
2. _
3. Licensed Therrnal Power (MWt): _ 380,0 __ _ ___
4. Nameplate Rating (Gross MWe): _ _ _1304 _ _ _ _ _ _ _ _ _ _ _
5. Design Electrical Rating (Net MWe ) _ l_2)_0__ ____ __ ___
6. Maximum Dependable Capacity (Gross MWe) : To_b_e_ de_termin_ed
7. Maximum Dependable Cacacity (Net MWe): _ To__b_e_delermined
8. If Changes Occur In Capacity Ratings (Items Nuraber 3 Through 7) Since Last Recort. Give Reasons: _ _ _ _ . _ _ _ , _ _ _

__ --. ---__________N_/_A_______ _______________ ________ ____

9. Power Level To Which Restricted, If Any (Net MWe): 19,0_! M _[0__Mye)
                        '10. Reasons For Restrictions, I f Any _Loy_P_ower_0_p,_e rating _Mc_e.nse___

This Month Yr.-to-Date Cumulati

11. Hours In Reportino Period - ____744____ _ __2_1_60_-__
                                                                                                                                            -                  _.2._16_0_    _
12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line ___0___,, __,__0__ 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated 0 0 0 (MWH)
17. Gross Electrical Energy Generated 0 ______,Q.__ f____

(MWH)

            ,            18. Net Electrical Energy Generated                                               0                  ______Q.___                           _ f_ _ _

(MWH)

19. Unit Service Factor _ _ __N]6_ _ _ _ _ _ EL__ _ _ ElA _
20. Unit Availability Factor ,,_, _ ,,N]6_ ,, _ _ _ _ _ _ EA _ __ 314 .
            "I{g.       21. Unit Capacity Factor (Using MDC Net)
                                                                                                  ,,__ _ Jff __               __ _ _ _ EA _ ,,                 _ _ Jff__

0 22. Unit Capacity Factor (Using DER _ _ J]A___ _ _ _ _ EA _ _ _J1A__ tac Net)

23. Unit Forced Outage Rate __,__J]f___ _,_ _ _, EA _ _ ___JfA_,_

h 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and 5

         "                   Duration of Each): _N.o_.sigg.1fJg,qn.,_pittafg_g1angd_nntfl_;tf_t2T..RMIWily_IW1.__

t . lg GJZ85_)_____________________________________ ___.,__ _ ___________.,__ _ __

         .a                  _________________________________________________________
25. If, Shutdown At End Of Report Period, Est irnated Date of Startuot yjA_
                                                                                                                                                                           /
26. Unitn In Test Status (Prior To Commercial Ooeration): p Forecast Achieved (7 g INITIAL CRITICALITY _ _ iLM_ _ _ _ _ NA INITIAL ELECTRICITY __6f81_,_ _ ,_ ,,___NA_,,____,,

COMMERCIAL OPERATION _ _ _1_1/_8_5_ _ _ _ _ __ ___N7A_____ _____J

        ;y                                      -
                                                                                                        ~

i s a L SUMM98Y QE QEEB9IING EX2gBIENCg Egg ISg MONIH DOCKET NO. ______53-518.____ UN I T___ _________Ryl4GS._L_____ -- _ D A T E __ ____ ______0_4.19 8/.A5_____ ____ COMPLETED BY___.L_fz_Rishar.dann___ TELE P HONE _____ __632.-137,-53QQ.______ _______ Ext _619.3 ________ March 9, :1985 - Completed "A" Train -lectrical outage

           ' March 9,.1985 - Close'd Reactor Trip Circuit Breakers on Reactor Trip Switchgear March 9, 1985 - Checked CEA position indication.
           , March 23, 1985 - Completed CEA patch verification testing.

s e D amama~

r-, . v . ;. V: . AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _'_50 528_____ UNIT _ _ _ _ _ _ _ - _ .PVNGS 1 -__ 1 DATE _ = -.0_4_08.

                                                                                                                                 .       . . . _85          = - _ -

COMPLETED BYM. P. Richardson ___

                                                                                                       . TELEPHONE ___602__ _9_3_2_5_.3_00 _ __                __

Ext. 6593 ___ MONId8 March 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

                             't                         0                                       17                    0
                             .2        ____           _.0._____        ____            ___      1a ___ __             _0 _____._                  _______

3 0 19 _ _ __0____ ____ __ _ 4 _ ____ _.0. - _ __ ___ 20 . ____ 0. ___ __ ___ _

                             -5                         0                                       21  _____0.__________.__                                                          .

a 6 __ _ 0.-__ _ _ 22 _ __..-___0 _____- . ___

         .                    7        _        __- _0        ___ _              -_ _-          23 -____.           -_0_-     _______                             __

8 . __ .0.___ _ _ _ _ __ 24 __ __ _0__ ______ __ 9 __________0________________ 25 _________9________________ 1e -_ _ 0.___ - -__ ___ 26 _________D- _____ _ _____ 11 __ __ __-._.-. 0 __ _- 27 .._ -_D__- _ -- __ 12 __________0____ . _ ____ _ 28 _____ ___9__ _ _ _______ 13 _ _ _ _0___ _ _ __ _ 29 __D_ ___ _ _ 14 _ ___._ __0___ _____ _ _ 30 ____ g___ _ ___ _ 15 _ _ ____ _0____ _____ _ _ 31 __ ___ __3_ __ - _ _ 16 __ _ _0 _ _ _

          'y-s ' .

y .~.g L i b

DOCKET No. sn s9A UNIT SHUTDOWNS AND POWER REDUCTIONS PVN'9-1 UNIT NAMC DATE  : 4/ lMI 55 . '~ COMPLETED BY Y- P Hrheea=^n TELEPHONC M7-511A Fve MQ1 W Method of Shutting Down System Component Cause er Corrective 2 3 LER 4 5 Action to 1 Dura t ion Code Code Prevent Recurrence Type (Hours) Reason Reactor No. No. Date Not applicable - reactor N/A has not achieved initial 9 criticality. 3 is 1 2 Method: Exhibit F - Instructions F-Fo rced Reason: I-Ma ntea l for Preparation or Data S-Scheduled A-Eauipment failure (Explain) 2-Mantial Scram. [ntry Sheets for Licensee D-Maintenaneo or Test 3-Atatomatic Scram. Event Report (LER) File C-Ite rue l leg (NURCC 0161) D-ftegts t a to ry fle s t rict ion la-Cont inisa t ion f rom E-Operator T ra ining & License Examina tion Prevloiss Month 5-Redtection or 20% 5 r- Admini s t ra t ive or Creator In the Exhibit H-Same Source C-ope ra t iona l Error (Explain) Past 24 flours H-Other (Explain] . 6-Other (Explain) 2940u

     ' e REFUELING INFORMATION DOCKET NO. __50_528  _ ______________

UN I T_ ___ _ _ _ _ f_NG S-}, ___ __ ___ _ _ D AT E _ _____ _ __0{/08 / 85 COMPLETED BYU',_P. Richardson__ ,_ ___ TELE PHONE ___602 _932_5300 ____E_xt.__6_593__________

l. Scheduled date for next refueling shutdown.

10/1/87-

2. Scheduled date for restart following refueling.

11'/19/87

3. Will refueling or resumotion of ooeration thereafter recuire a Technical Soecification change or other license amendment?

Not yet detennined What will these be? Not yet detenained

4. Scheduled date for submitting prooosed licensing action and succorting information.

Not yet determined

5. Imoortant Licensing considerations associated with refueling,
e. g. new or different fuel design or supplier, unreviewed design or oerformance analysis methods, significant changes in fuel design, new operating crocedures.

Not yet detennined

6. The number of fuel assemblies.

a) I n t h e co r e . _241_____ ______ __ _ b) In the scent fuel storage cool. ,_0__________

7. Licensed scent fuel s t ora g e ca pac i t y. ____13 U)_________

Intended change in scent fuel st ora ge ca pac i t y. ,_Noge_________

8. Projected date of last refueling that can be discharned to spent fuel storage pool assuming cresent capacity.

2002 (w/ annual reloads and full core discharge capability).

I b Arizona Nuclear Power Project P.O. box 52034

  • PHOENIX, ARIZONA 85072-2034 ANPP-32431-EEVB/GEC April 17, 1985 Learned W. Barry, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528, License No. NPF-34 March Monthly Operating Report File: 85-056-026: G.I.01.10

Dear Mr. Barry:

Attached please find the Fbrch, 1985 Monthly Operating Report prepared and 02bmitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office. Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period. If you have any questions or concerns, please contact me. Very truly yours, f k kcut' .i E. E. Van Brunt, Jr. Executive Vice President Project Director EEVB/GEC/das Attachments cc: J. B. Martin (all w/a) R. P. Zimmerman E. A. I,tcitra A. C. Gehr f J i k . l I

}}