ML20126F975
| ML20126F975 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/11/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20126F979 | List: |
| References | |
| NUDOCS 8103240800 | |
| Download: ML20126F975 (2) | |
See also: IR 05000321/1981003
Text
. -
-. -
.
-
~
'
,
t'
/ osog'o,
UNITED STATES
. ! "
,,
~j
NUCLEAR REGULATORY COMMISSION
a
REGION II
5.
,a #
o
101 MARIETTA ST., N.W., sulTE 3100
ATLANTA, GEoRotA 303o3
.....
MAR 1 1 9
1
. /N (d8M/4
/ b
'%y % p I
Georgia Power Company
>C/
g
'
. ATTN:
J. H. Miller, Jr.
ge \\
- Executive Vice President
. ,- /
270 Peachtree Street
0.]
OD [i 3,
b
% Td
p
Atlanta, GA 30303
L4
\\
9.* *
Gentlemen:
g
4lu
,d
Subject: Report Nos. 50-321/81-03 and 50-366/81-03
?
This refers to the_ routine safety inspection conducted by T. A. Peebles of this
offica on February 17-20, 1981, of activities authorized by NRC Operat.ing License
Nos. CPR-57 and NPF-5 for the Hatch facility.
Our preliminary findings were
discussed with T. V. Greene and C. T. Moors at the conclusion of thelnspection.
Areas examined during this inspection included refueling surveillance testing"and
maintenance. Within these areas, the inspection consisted of selective exami-
nations of procedures and representative records, interviews with personnel, and
cbservations by the inspector.
During the inspection, it was found that certain activities under your ' license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the' Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response.. are delineated in
Appendix A.
In accordance with Section 2.790-of the NRC " Rule: of Practice," Part 2, Title -
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary infoniation
should be contained in a separate part of the document. If we do not hear from
l
you in this regard within tne specified period, the report w ll be placed in the
,
Public Document Room.
.
-
.
!
i
1
.IHIS DOCUMENT CONTAINS
'
POOR QUAllTY PAGES
BIOSH OD
1
I
.. -- - - ,
m.--
,,
_,-_,_,m.,
,._m,,..,.
,,
, . _ , , , _ .,, ....,_
. .
._
_ , ,
,
.
-
.
Georgia Power Company
2
Should you have any que:tions concerning this letter, we will be glad to discuss
them with you.
Sincerely
/
2
&
ff
i/
Richard C. Lswis, Acting Director
Division of Resident and Reactor
,
Project Inspection
Enclosures:
,
1.
Appendix A, Notice of Vic'.ation
2.
Inspection Report Nos. 50-321/31-03
and 50-366/81-03
cc w/ encl:
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
W. A. Widner, Vice President and
General Manager-Nuclear Generation
.
E
l
I
. ..
9
l
l