Text

. -

-. -

.

-

~

'

,

t'

/ osog'o,

UNITED STATES

. ! "

,,

~j

NUCLEAR REGULATORY COMMISSION

a

REGION II

5.

,a #

o

101 MARIETTA ST., N.W., sulTE 3100

ATLANTA, GEoRotA 303o3

.....

MAR 1 1 9

1

. /N (d8M/4

/ b

'%y % p I

Georgia Power Company

>C/

g

'

. ATTN:

J. H. Miller, Jr.

ge \\

- Executive Vice President

. ,- /

270 Peachtree Street

0.]

OD [i 3,

b

% Td

p

Atlanta, GA 30303

L4

\\

9.* *

Gentlemen:

g

4lu

,d

Subject: Report Nos. 50-321/81-03 and 50-366/81-03

?

This refers to the_ routine safety inspection conducted by T. A. Peebles of this

offica on February 17-20, 1981, of activities authorized by NRC Operat.ing License

Nos. CPR-57 and NPF-5 for the Hatch facility.

Our preliminary findings were

discussed with T. V. Greene and C. T. Moors at the conclusion of thelnspection.

Areas examined during this inspection included refueling surveillance testing"and

maintenance. Within these areas, the inspection consisted of selective exami-

nations of procedures and representative records, interviews with personnel, and

cbservations by the inspector.

During the inspection, it was found that certain activities under your ' license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the' Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response.. are delineated in

Appendix A.

In accordance with Section 2.790-of the NRC " Rule: of Practice," Part 2, Title -

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary infoniation

should be contained in a separate part of the document. If we do not hear from

l

you in this regard within tne specified period, the report w ll be placed in the

,

Public Document Room.

.

-

.

!

i

1

.IHIS DOCUMENT CONTAINS

'

POOR QUAllTY PAGES

BIOSH OD

1

I

.. -- - - ,

m.--

,,

_,-_,_,m.,

,._m,,..,.

,,

, . _ , , , _ .,, ....,_

. .

._

_ , ,

,

.

-

.

Georgia Power Company

2

Should you have any que:tions concerning this letter, we will be glad to discuss

them with you.

Sincerely

/

2

&

ff

i/

Richard C. Lswis, Acting Director

Division of Resident and Reactor

,

Project Inspection

Enclosures:

,

1.

Appendix A, Notice of Vic'.ation

2.

Inspection Report Nos. 50-321/31-03

and 50-366/81-03

cc w/ encl:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation

.

E