Amend 168 to License DPR-65,incorporating Changes Which Modify TS in Area of Table 3.3-3,ESF Actuation Sys Instrumentation
ML20126F861
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/23/1992
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Northeast Nuclear Energy Co (NNECO), Connecticut Light & Power Co, Western Massachusetts Electric Co
Shared Package
ML20126F863 List:
References
DPR-65-A-168 NUDOCS 9212310179
Download: ML20126F861 (6)


Text

_. _ _ _ _ _ _ _

e bS FIG

/

h*%

A UNITED STAT ES

['

3, g

NUCLEAR REGULATORY COMMISSION n

l WA$mNOTON, D. C, 70556

  • t,,+..../

NORTHEAST NVCLEAR ENERGY COMPANY l

THE CONNECTICVT LIGHT AND POWER COMPAffy lliE WESTERN MASSACHUSETTS ELECTRIC COMPAl1Y DOCKET NO. 50-315 M11LSTONE NUCLEAR POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 168 License No. DPR-65 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated October 28, 1992, as sup)lemented November 25, 1992, and December 8, 1992, complies witi the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the pubile, and (ii) that such activities will be conducted in compilance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9212310179 92122N

- DR ADOCK 0500 6

, 2.

Accordingly, the license is amended by changes to the lechnical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License flo. DPR-65 is hereby amended to read as follows:

(2) ItChaical_Speci fIcationi The Technical Specifications contained in Appendix A, as revised through Amendment flo.168, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance to be implemented within 30 days of issuance.

FOR THE fiUCLEAR REGULATORY COMMISS10f1 s

/ John F. Stolz, Dir tor (project Directorate I-4 Division of Reactor Projects - 1/11 Office of tiuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: December 23, 1992

ATTACHMENT TO LICENSE AttENDMENT NO.168 FACILITY OPERATING LICENSE NO. DPR-65 QOCKET NO. 50-336 Replace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change, 1

J l

Reg.y.g Insert j

3/4 3-13 3/4 3-13 3/4 3-16 3/4 3-16 i

3/4 3-17 3/4 3-17 i

i I

I i

i l'

1 l

l

TABLE 3.3-3 (Certinued)

DiGINEERED SA;ETY FEATURE ACTUATION SYSTEM INSTELNENTATICN MINIM'JM

  • p".

TOTAL NO.

CHANNELS CHANNELS APPLICABLE 10 FUNCTIONAL UNIT OF CHANhELS TO TRIP OPERA?tE MCOES ACTION jg.

4.

MAIN STEAM LINE gi ISOLATION

~

Containment Pressure -

4 2

3 1, 2, 3 2

a.

High b.

Steam Generator

)

Pre,ure - Low 4

2 3

1,2,3(c) 2 1

5.

ENCLOSURE BUILDING FILTRATION (EBFAS) a.

Manual EBFAS (Trip 2

1 2

1, 2, 3, 4 1

o,

];

Buttons)

)[

b.

Manual SIAS (Trip 2

1 2

1, 2, 3, 4 1

Buttons) c.

Containment Pressure-High 4

2 3

1, 2, 3 2

d.

Pressurizer Pressure-Low 4

2 3

1, 2, 3(a) 2 6.

. CONTAINMENT SUMP RECIRCULATION (SRAS) k a.

Manual SRAS (Trip EL Buttons) 2 1

2 I,2,3,4 1

<?g b.

Refueling Water Stcrage Tank - Low 4

2(f) 4 1,2,3 4

_e

?

3 CD

-7

e 9

TABLE 3.3-3 (Continued)

TABLE NOTATION (a) Trip function may be bypassed when pressurizer pressure is < 1750 psia; bypass shall be automatically removed when pressurizer pressure is 21750 psia.

(b) An SIAS signal is first necessary to enable CSAS logic, (c) Trip function may be bypassed below 600 psia; bypass shall be automatically removed at or above 600 psia.

(d) Each channel has two sensors, high radiation level on either sensor will initiate containment purge valve isolation.

(e) Trip may be bypassed during testing pursuant to Special Test Exception 3.10.3.

(f) The logic combinations of A/C and B/D do not provide a SRAS trip condition.

ACTION STATEMENTS ACTION 1 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />..

ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels and with the pressurizer pressure:

a.

< 1750 psia; immediately place the inoperable channel in the bypassed condition; restore the inoperable channel to OPERABLE status prior to increasing the pressurizer pressure above 1750 psia, b.

21750 psia, operaticn may continue with the inoperable channel in the bypassed condition, provided the following conditions are satisfied:

i 1.

All-functional units receiving an input from the bypassed channel-are also placed in the bypassed condition.

l 2.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be removed from service for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided one of the inoperable channels is placed in the tripped condition.

I MILLSTONE - UNIT 2 3/4 3-16 Amendment'No. 168 0074

o TABLE 3.3-3 (Continued)

ACTION 3 - With one or more channels inoperable, operation may continue provided the containment purge valves are maintained closed.

ACTION 4 - With the number of OPERABLE channels one less than the Minimum Number of Channels, place the inoperable channel in the bypassed condition and restore the channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

No other channels shall be removed from service for surveillance testing during this ACTION STATEMENT.

)

l

[

MILLSTONE - UNIT 2 3/4 3-17 Amendment No. 168 0014 i