Proposed Tech Spec Changes Re Battery Svc Test for Onsite Power Distribution Sys.Change Allows Performance Discharge Test to Be Performed in Lieu of 18-month Battery Svc Test
ML20126F545
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1985
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20126F542 List:
References
NUDOCS 8506170528
Download: ML20126F545 (2)


Text

,

Docket No. 50-336 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications On-Site Power Distribution System - Battery Service Test 8506170528 850611 PDR ADOCK 05000336 P

PM June 1985

c g..

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.

The pilot cell specific gravity, corrected to 770F, is > 1.200, 3.

The pilot cell voltage is) 2.08 volts, and 4.

The overall battery voltage is > 125 volts.

-b.

At least once per 92 days by verifying that:

1.

The voltage of each connected cell is > 2.08 volts under float charge, and 2.

The specific gravity, corrected to 770F, of each cell is > 1.200.

c.

At least once per 18 months by verifying that:

l.

The cells, cell plates and battery racks show no visual indication of physical damage or deterioration, 2.

The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material, and 3.

The battery charger will supply at least 800 amperes at a minimum of 130 volts for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

d.

At least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> when the battery is subjected to a battery service test.

e.

At least once per 60 months, during shutdown, by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. This performance discharge test may be performed in lieu of the battery service test.

MILLSTONE - UNIT 2 3/48-9

.