ML20126F125

From kanterella
Jump to navigation Jump to search
Informs That MSIV Failure Reported on 741115 No Longer Considered Reportable.Caused by Test Sys Failure.Concludes That Steam Line Trip Valve Never Unable to Perform Intended Safety Function
ML20126F125
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/25/1974
From: Hartley F
CONNECTICUT YANKEE ATOMIC POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
CYH-2818, NUDOCS 8103090041
Download: ML20126F125 (1)


Text

.,>c W

i 2

L' t.*

,;, T

/

CONNECTICUT YANKEE ATOMIC POWER COMPANY f. ] s% r HADDAM NECK PLANT j

l

\\_

RR r 1. BOX 127E. EAST H AMPTON, CONN. c6424

!!ovember 25, 1974 CYH-2818

!!r. James P. O'Reilly, Director g o - 7_./ 3 Region I il ~k, Directorate of Regulatory Operations

\\

. - l$,'J U. S. Atomic Energy Co=ission b

631 Park Avenue King of Prussia, Pennsylvania 1940G

(

/

Mi.1.J' ~

Dear fir. O'Reilly:

We have completed the investigation involving the failure of ?3 main steam line isclation valve reported to you on November 15, 1974.

As a result of our investigation, this item is no longar considered

" reportable" as defined in Connect Jt Yankee Technical Specifications Section 5.3.

Our investigation indicated the failure of the #3 steam line trip valve to nove during its weekly motion check (reference Section 4.9, Connetlicut Yankee Technical Specifications) wn due to a failure in the test systen and not of the valve or its associated trip system.

The test system has no effect on the valve in a trip situation.

These findings conclude, therefore, that at no time was the stean line trip valve unable to perform its intended safety functior, Very truly yours, y( yW -/s N

-,s 3 " + ~d

/.- V gm

-, 4 t~'

1

. W. liartley /

/;

twn Plant Superintendent 7

I 14 d NO S 2 9 i374 rJ J

... :y y h I n

t.![fn;.u' d '/

JHF/bn cc:

DOL, Washington, D. C.

q.

w11 c'h1-a

&/

I a

12120 f/d 30900c//

-., ~. -

, -.