ML20126F051

From kanterella
Jump to navigation Jump to search
Deficiency Rept DER 85-01 Re Capability of Auxiliary Feedwater Pump Drive Terry Turbines to Meet Seismic Qualification Requirements.Evaluation & Corrective Action Completed.Final Rept Expected by 850614
ML20126F051
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/15/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32650-TDS, DER-85-01, NUDOCS 8506170305
Download: ML20126F051 (2)


Text

!

i h

Arizona Nuclear Power Project '

?n y.,

[9 ',

P O. BOX 52034

  • PHOENIX, ARIZONA 85072-2034 May 15, 1985'4.

ANPP-32650-TDS/PJC U. S. Nuclear Regulatory Commission Reg 4.on V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 85-01 A 50.55(e) Potentially Reportable Deficiency Relating To The Auxiliary Feedwater Pump Drive Turbine File: 85-019-026; D.4.33.2

Reference:

(A) Telephone conversation between A. Hon and T. Bradish on January 25, 1985 (B) ANPP-31974, dated February 21, 1985 (Interim Report)

(C) ANPP-32172, dated March 19, 1985 (Time Extension)

(D) ANPP-32331, dated April 8,1985 (Time Extension)

(E) ANPP-32512, dated April 29, 1985 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Refer-ence (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested in References (C), (D), and (E). At that time it was estimated that a Final Report would be available by May 15, 1985.

The ANPP has completed the evaluation and the corrective action neces-sary to enable the Units 1 and 2 Terry Turbines to meet the Project's seismic qualification requirements.

ANPP is currently compiling the information for the Final Report and expects to submit the Report by June 14, 1985.

Very truly yours, 28 h

PDR E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PJC/nj cc:

See Page Two l;0 1E-11

t

~ 1,4 l

Mr. D. F. Kirsch ANPP-32650-TDS/PJC DER 85-01' Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L.-A.

Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde

[

B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

.