Revised Monthly Operating Rept for Oct 1992 for Songs,Unit 1
ML20126E951
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/31/1992
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20126E929 List:
References
NUDOCS 9212300056
Download: ML20126E951 (2)


Text

..

Doc'um'ent Control Desk j

ATTACliMEf1T A Revised October 1992 Operating Status 50f1GS Unit 1 Monthly Operating Report i

L 4

mor.nov/8' 9212300056 921215 PDR --ADOCK 05000206 R

PDR-

l Docunient Control Desk

      • Items affected by this revision are in bold.***

NRC MONTHLY OPERATING REPORT DOCKET NO: _50-206 UNIT NAME:

SONGS - 1 DATE:

12/15/92 COMPLETED BY:

J. L. Oarlina TELEPHONE:

(714) 368-6223 OPERATING STATUS, 1.

Unit Name:

San Onofre Nuclear Generatina Station. Unit 1 2.

Reporting Period October 1992 i

3.

Licensed Thermal Power (MWt):

1347 l

4.

Nameplate Rating (Gross MWe):

456

)

5.

Design Electrical Rating (Net MWe):

436 F

6.

Maximum Dependable Capacity (Gross MWe):

456 7.

MaximumDependableCapacity(NetMWe):

436 i

8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons 9.

Power Level To Which Restricted, if Any (Net MWe):

See Item 10 10.

Reasons for Restrictions, If Any:

Power level reduction from full power as a result of a self-imoosed reduced oceratino temoerature to retard Steam Generator tube _ corrosion rate.

This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745.00 7.320.00 217.701'.00 I

12.

Number Of Hours Reactor Was Critical 745.0Q 7.320.00_

129.278.07-13.

Reactor Reserve Shutdown Hours 0.0A 0.00 0.00 14.

Hours Generator On-Line 745.00 7.320.00 125.339.50 15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Gross Thermal Energy Generated (MW WH)916.975.739.005.384.30157.187 17.

Gross Electrical Energy Generated 286.200.00 2.841.000.00 52.685.944.00 18.

Het Electrical Energy Generated (M )

261931_dQ 2.678.215.00 - 49.697.590.00 -

19.

Unit Service Factor 100.00%-

100.00%

57.574 20.

Unit Availability Factor 100.00A 100.00%

57.57%-

21.

UnitCapacityFactor(UsingMDCNet) 83.12%-

83.92%

52.36%

22.

Unit Capacity Factor (Using DER Net) 83.12%

83.913 52.36%:

23.

Unit Forced Outage Rate 0.00%

0.00%

17.98%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of _ Each):

lovember 30. 1992 SONGS 1 will be nermanentiv shutdown.

25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior To Commercial Operation):-

Forecast

-Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY' NA~

NA

-COMMERCIAL OPERATION NA NA mor.nov/9