ML20126E548
| ML20126E548 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/30/1985 |
| From: | Zwolinski J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20126E550 | List: |
| References | |
| NUDOCS 8506170123 | |
| Download: ML20126E548 (8) | |
Text
. _ _. _ _ _
/
o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
O p
WASHINGTON, D. C. 20555
\\,*...+/
COMMONWEALTH EDISON COMPANY DOCKET NO. 50-P37 J
DRESDEN NilCLEAP POWER STATION, UNIT NO. 2 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 89 License No. DPR-19 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by the Commonwealth Edison Company (the licensee) dated May 2, 1983 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized 1
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; i
D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
yhUh0h f
P i
~
2-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Provisional Operating License No. DPR-19 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 89, are hereby incorporated in the license. The licensee shall operate the facility 1
in accordance with the Technical Specifications, 3.
This license amendment is effective as of the date of its issuance.
i FOR THE NUCLEAR REGULATORY COMMISSION h
lhb.
I&
L
[v'JohnA.Zwolinski, Chief 6
Operating Reactors Branch #5 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: May 30, 1985.
l l
ATTACHMENT TO LICENSE AMENDMENT NO. 89 PROVISIONAL OPERATING LICENSE DPR-19 DOCKET NO. 50-?37 1
Revise Appendix A Technical Specifications by removing the page identified below and inserting the attached page. The revised page is identified by the captioned amendment number and contains a marginal line indicating the area of change.
I REMOVE INSEPT 3/4.3-13 3/4.3-13 I
i r
l I
DRESDEN II DPR-19 Amendment No. %, 89 3.3 LIMITING CONDITION FOR OPERATION 4.3 SURVEILLANCE REQUIREMENT (Cont'd.)
(Cont'd.)
F.
If Specifications 3.3.A F.
(N/A) through D above are not met, an orderly shutdown shall be initiated and the i
reactor shall be in the Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
G.
Economic Generation
- G.
Economic Generation control System Control System (EGCS)
Operation of the unit with Prior to entering ECCS and the Economic Generation once per shift while oper-Control System with sting in ECCS. the EGCS automatic flow control operating parameters will shall be permissible only be reviewed for accepta-in the range of 65-100% of bility.
rated core flow, with reactor power above 20%.
i f
i s
4 J
3/4.3-13 l
3921a
e ne
+
o UNITED STATES g
,8 g
NUCLEAR REGULATORY COMMISSION D
j WASHINGTON, D C. 20555 k.../
COMMONWEALTH EDISON COMPANY DOCKET NO. 50-249 DRESDEN NUCLEAR POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 82 License No. DPR-25 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by the Comonwealth Edison Company (the licenseel dated May 2, 1983 complies with the standards and requiretrents of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; R.
The facility will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have 4
been satisfied.
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License -
No. DPR-25 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 82, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION lbhb-Y John A. Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: May 30, 1985.
l
[
ATTACHMENT TO LICENSE AMENDMENT NO. 82 FACILITY OPERATING LICENSE DPR-25 DOCKET NO. 50-249 I
i i
i
~
Revise Appendix A Technical Specifications by removing the page identified below and inserting the attached page. The revised page is identified by the captioned amendment number and contains a marginal line indicating the l
area of change, t
REMOVE INSERT 3/4.3-13 3/4.3-13 i
I l
I 1
d t
i i
I f
l
DRESDEN III DPR-25 Amendment No. yl, }4, 82 3.3 LIMITING CONDITION FOR OPERATION 4.3 SURVEILLANCE REQUIREMENT (Cont'd.)
(Cont'd.)
3 F.
If Specifications 3.3.A F.
(N/A) through D above are not met, an orderly shutdown shall be initiated and the reactor shall be in the Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
I 7;
G.
Economic Generation G.
Economic Generation control System control System (ECCS)
Operation of the unit with Prior to entering ECCS and the Economic Generation once per shift while opera-Control system with ting in EGCS, the EGCS oper-automatic flow control ating parameters will be re-shall be permissible only viewed for acceptability.
in the range of 65-10M of rated core flow, with
~
reactor power above 2%.
I i
3/4.3-13 3895a
. -