ML20126E221
| ML20126E221 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/22/1992 |
| From: | WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | |
| Shared Package | |
| ML20126E219 | List: |
| References | |
| NUDOCS 9212290060 | |
| Download: ML20126E221 (2) | |
Text
'
_e Attachment IV to NA 92-0138 Page 1 of 2 1
ATTACliMENT IV PROPOSED TECilNICAL EPECIFICATION CllANGE l
i lEA22;ggggggggg,,
p
F i Attabhment tofNA:92-0138 J
Page 2 of 2 -
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i.
'At-least once per 10 years by:
- lL
- 1).
Draining each fuel oil storage tank, removing the' accumulated sediment and cleaning the tank using a sodium hypochlorite.
solution or equivalent,M y
^)
F;;fer=ir.g a sressure test ef these pertions of th: "' :-F f;;l oil system dtsignad te 5
. vi. Ill, tu5eaction_ND of'the'ASME Code.
test pr:::;r; eq :1 t: 110% of th: syst:; :::ign ; ;.....
4.8.1.1.3 Reports - All diesel generator failures, valid-or nonvalid, shall be reported-in a Special Report to the Commission pursuant.to Specification 6.9.2 within 30 days.
Reports of diesel generator failures shall. include the informa-tion recommended in Regulatory Position C.3.b of Regulatory Guide 1.108,,Revi-sion 1, August 1977.
If the number of failures in the.last 100 valid tests (on a per nuclear unit basis) is greater than or equal to 7, the report shall' be supplemented to include the additional information recommended in Regulatory Position C.3.b'of Regulatory Guide 1.108,. Revision 1, August 1977.
P WOLF CREEK - UNIT 1 3/4 8-6a Amendment No. '8
.