ML20126D205
| ML20126D205 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 06/07/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 8506140676 | |
| Download: ML20126D205 (1) | |
Text
..
DUKE POWER COMPANY P.O. box 33189 CHARLoffrE, N.C. C8242 HALH. TUCKER TELEPHONE vace PaestosNT (704) 07t>4531
= = ^ = = " " ' " '
June 7, 1985 Document Control' Desk U. S. Nuclear Regulatory Commission
- Washington, D. C. 20555
Subject:
McGuire Nuclear Station, Unit 1 Docket No. 50-369 Gentlemen:
On May 8, 1985, while exiting containment it was observed that with the
~
auxiliary building door open,.the reactor building door seal deflated. This
- has been determined to be reportable under 10 CFR50.73 (a)(2)(1)(B) 'with the report due June 7 ~1985. Due to manpower requirements of the investigating group, this report will be delayed until June 25, 1985. The unit was in Mode 6 (Refueling) at the time of the incident.
Very truly yours, Ad L
Hal B. Tucker JBD/mjf-cc:
Dr.. J. Nelson Grace, Regional Administrator
.U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 INPO Records Center Suite 1500 1100 Circle 75 Parkway
-Atlanta, Georgia 30339 M&M Nuclear Consultants 1221 Avenue of the' Americas New York, New York 10020 Mr. W..T. Orders NRC Resident Inspector McGuire Nuclear Station American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245
/
270 Farmington Avenue fM Farmington, CT 06032 k
9 5
.,