ML20126C139

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-354/92-19 on 921104-10.No Violations Noted
ML20126C139
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/15/1992
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML20126C141 List:
References
NUDOCS 9212220392
Download: ML20126C139 (2)


See also: IR 05000354/1992019

Text

-

,

., y-/%

_

. \ Ct_-"/

'

.

,

.

DEC 151992

Docket No. 50 354

hi . Steven E. hiiltenberger

Vice President and Chief Nuclear Officer

Public Service Electric & Gas Company

Post Office Box 236

Ilancocks Bridge, New Jersey 08038

Dear hir. hiiltenberger:

SUBJECT: INSPECTION REPORT 50-354/92-19, INSERVICE INSPECTION OF

SNUBBERS

This letter refers to the inspection conducted by hir. J. Carrasco of this office on

November 4-10,1992, at the Hope Creek Generating Station. The inspector discussed the

results of the inspection with hir. J. Hagan and other members of your staff at the conclusion

of the inspection.

This inspection focused on activities important to the public health and safety and was

directed toward engineering activities to assess your corrective action for the mechanical

snubbers that failed the functional test, to verify that the failed snubbers were replaced or

restored to their as-designed condition prior to the restart of the plant, to review your

inservice inspection (ISI) snubber program, and to assess the snubber reduction program.

Details on the areas examined during the inspection are described in the NRC Region 1

inspection report, which is enclosed with this letter. Within these areas, the inspection

consisted of selected examinations of procedures and representative records, interviews with

personnel, and observation by the inspector.

. No reply to this letter is required. Your cooperation in this matter is appreciated.

(

Sincerely,

Orl0fnul Slonok

g

M\chcd TNdo

l

Jacque P. Durr, Chief

'

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Region i Inspection Report No. 50-354/92-19

me o'I o

9212220392 921215

gDR ADOCX 050003S4 -

PDR

_

.

.

.

-

.

.

DEC 151932-

'

hir. Steven E. hiiltenberger 2

cc w/ encl:

S.12Bruna, Vice President Nuclear Operations

J. Isabella, Director, Generation Projects Department,

Atlantic Electric Company

J. J. Hagan, General hianager - Hope Creek Operations

F. Thomson, hianager - Licensing and Regulation

J. T. Robb, Director, Joint Owner Affairs

A. C. Tapert, Program Administrator >

R. Fryling, Jr., Esquire

_

hf. J. Wetterhahn, Equire

Tom Dwyer, Public Safety Consultant, Lower Alloways Creek Township

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

State of New Jersey

bec w/ encl:

Region 1 Docket Room (with concurrences)

E. Wenzinger, DRP

J. White, DRP

V. hicCree, OEDO

S. Dembek, NRR

J. Stone, NRR

DRS/EB SALP Coordinator

!

!

!

.

i RI:DRS RI:DRS RI:DRS

Carrasco/ajk Gray Durr

'

'

C t h f < c c. Eth-

.1#-192 11/#/92 12//$92

.

l2llfI1' OFFICIAL RECORD COPY

'

A: HOPE.JC -

l

,

l

. _._ __ _ _ _. ..-._.._._ . _. _ _._ , _ _ _ _..-_ _ _ _ _ _