ML20126C035
| ML20126C035 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/18/1992 |
| From: | William Cahill, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20126C038 | List: |
| References | |
| TXX-92563, NUDOCS 9212220331 | |
| Download: ML20126C035 (1) | |
Text
_- _ - -
M Log Il TXX-92563 2 '"""'
File Il 10010 2
907 921
}~
Ref.
(/ TMl 1.D.1 December 18, 1992 William J. Cahill, Jr.
o,wn a raa,uan U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, OC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
TRANSMITTAL OF SUPPLEMENT 6 TO THE HUMAN FACTORS CONTROL ROOM DESIGN REVIEW FINAL REPORT REF:
- 2) USNRC letter from J. H. Wilson to William J. Cahill, Jr. dated August 21, 1990 Gentlemen:
Reference 1 submitted Supplement 5 to the CPSES Human Factors Control Room Design Review final Report.
It reported the status of the final activities of the CPSES Detailed Control Room Design Review (DCRDR) with regard to differences in design between Unit I and Unit 2 for the licensing of Unit 2.
Additional requirements of Reference 2 require TU Electric to perform environmental surveys to satisfy the guidelines for the DCRDR Program.
The attached report contains the results of these surveys.
If you have any questions concerning the CPSES DCRDR, please contact either WendellKnightat(817)897-8512 orRichardS.Berkat(214)812-8952.
f' William J. Cahill, Jr.
By:
M Roger'O. Walker Manager of Regulatory Affairs for NEO RSB/GLM/tg Attachment c-Mr. J. L. Milhoan, Region IV Mr. T. A. Bergman, NRR Mr. B. E. Holian, NRR Residentinspectors,CPSES(2)
$k3Oo!k0$0 h
I S
g P
400 N. Olive Street LB. 81 Dallas,Te as 75201 I