Forwards Safety Insp Rept 50-341/92-17 on 921014-1208 & Notice of Violation
ML20126B309
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/11/1992
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Orser W
DETROIT EDISON CO.
Shared Package
ML20126B311 List:
References
NUDOCS 9212220050
Download: ML20126B309 (4)


See also: IR 05000341/1992017

Text

_ _ _ __

-1 . C)

99

DEC I1 s2

Docket No.-50-341

-

License No. NPF-43

The Detroit Edison Company

ATTN: W. S. Orser

Senior Vice President

T Nuclear Generation

6400 North Dixie !!!ghway

Newport, M! 48166

Dear Mr. Orser:

This refers tc the routine safety inspection conducted by Messrs. W. J. Kropp,

K. Riemer, R. Twigg, and R. Mendez of this office, and T. .Colburn and

R. Stransky of NRR from October 14, 1992, through December 8, 1992. The

- inspection included a review of activities at your Fermi 2 facility. At the

conclusion of the inspectica, the findings were discussed with those members

of year staff identified in the enclosed report.

  • , Areas examined during the inspection are identified in the report. Within

these areas,- the inspection consisted of a selective examint. tion of procedures

and representative records, observations, and interviews with personnel.

DuringI this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice of Violation. A

written response is required.

In accordance with 10.CFR 2.790 of the Commission's regulations, a copy cf '

-this letter and the enclosed inspection report will be placed in the NRC ,

-Public Document Room.

The responses directed t,y this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

requi ~d by the Paperwork Reduction Act of 1980, PL 96-511.

We " - gladly discuss any questions you have concerning this inspection.

cerely,

'

210043 W. D..Shafer, Chief

Reactor Projects Branch 2

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-341/92017(DRP)

. See Attached Distribution

-

() er ';

RIII ,) [III RIII / II

TNSe. 21004'nY -etPhDips shafer

-12//0/92 12//o/92 12//b /92 12///92

"

-9212220050 921211 0\

gDR' - ADOCK 050003 1;

\

\\,

. _

_

. ..

  • :a 4 UNITED ST ATES

gm g NUCLE AR REGULATORY COMMisslON

(

O

?>

f

REGION W

799 ROOSEVCL t HO AD

  • cLtN ELLYN, ILLIMOl$ 60137
  • ..**

DEC 1; o

Docket No. 50-341

ticense No. NPF-43

The Detroit Edison Company

ATTN: W. S. Orser

Senior Vice President

Nuclear Generation

6400 North Dixie Highway

Newport, MI 48166

Dear Mr. Orser:

This refers to the routine safety inspection conducted by Messrs. W. J. Kropp,

K. Riemer, R. Twigg, and R. Hendez of this office, and T. Colburn and

R. Stransky of NRR from October 14, 1992, through December 8, 1992. The

inspection included a review of activities at your Fermi 2 facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective exam...ation of procedures

and representative records, observations, and interviews with personnel.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice at

Violation. The violation is of concern because, although it is of minor

safety significance, it resulted from inadequate corrective actions for a

previous self-identified violation.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

O

__ - - _ . , . -, - - - . . . ~ . - . . . -.. - . - - -_- - - -

. .

DEC 11 Ei.2

.The Detroit Edison Company- 2

'

The responses directed by this letter and the accompanying Notice are not '

, subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have: concerning this inspection.

Sincerely,

./

W. D. Shafer, Chief  !

Reactor Projects Branch 2

Enclosures: .

-

1. Notice of Violation

2. Inspection Report

No. 50-341/92017(DRP)

cc w/ enclosure:

D. R. Gipson, Vice President,

Nuclear Operations

John A. Tibai, Supervisor

, of Compliance

P. A. Marquardt, Corporate

Legal Department

DCD/DCB (RIDS)

i _

-OC/LFDCB

Resident Inspector, RIII .

James R. Padgett, Michigan Public

i Service Commission

Harry H. Voight,.Esq.

'

Michigan Department of

Public Health

. Monroe County Office of-

Civil Preparedness

Fermi,- LPM,- NRR--

_ __ . _ .

'

-

. -..-.. _ .-__. - . . . - -. .. .- .. -. .- .

1

.

'DECy1;;y

The Detroit Edison Company 2 )

i

The responses directed by this letter and the accompanying'~ Notice are not

subject to the clearance procedures of- the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,  !

W. D. Shafer, Cbef

Reactor Projects Branch 2

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-341/92017(DRP)

I

cc w/ enclosure:

1 D. R. Gipson, Vice President,

l Nuclear Operations

'

John A. Tibai, Supervisor

of Compliance

l

P. A. Marquardt, Corporate

Legal Department

DCD/DCB (RIDS)

, OC/LFDCB

l Resident Inspector, RIII

James R. Padgett, Michigan Public

Service' Commission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

fermi, LPM, NRR

L

_

-(see attached concurrence)

RIII- RIII I- III

~

Tongue Funk lips -

a'er

12/ /92 12/ /92 12/ ///92 12////92

l

4

_.

- - -