Forwards Integrated Schedule Project List Semiannual Update, as of Dec 1992
ML20126B015
Person / Time
Site: Oyster Creek
Issue date: 12/07/1992
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C-92-1957, C000-92-1957, C321-92-2320, NUDOCS 9212210343
Download: ML20126B015 (25)


Text

_ _ _ _ _ _ _.

e-e

,4 s

GPU Nuclear Corporation hf arsi a. i e Jets y07054 201-316 7000 1ELEX 136-482 Wnters Direct Dial Number:

December 7, 1992 C000-92-1957 C321-92-2320 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50 219 Integrated Schedule Project List Semi-Annual Update Pursuant to condition 2.C.(10) of Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V. A of the Plan, the following attachments are submitted to provide the semi-annual project list update:

1.

Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects. Completed projects have been removed from the schedule listing.

Also noted by a double asterisk (**) are budget activity numbering changes.

2.

Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, changed in scope. Category A and B projects which have had schedule changes are provided with explanations, as appropriate.

2100B0 i

9212210343-921207 PDR ADOCK-05000219 R

PDR

)l GPU Nuclear Corporation is a subsdary of General PutAc Utatics Corporation p

)

,4 t

I December 7, 1992 l

C321 92 2320 Page 2 Four (4) Category B project schedule changes are discussed in Attachment B, and, four (4) activity changes (scope reduction consideration, and funding identification).

Pursuant to the LRPP for Oyster Creek, it will be assumed that you are in agreement with the above-Category B changes if you do not respond to this submittal within 15 days of receipt.

Sincerely, j

/

gSV R. L, Long Vice President nd Director Corporate Services /IMI-2 RLL/GMG/ pip cc: Director, Project Directorate 1-4 Oyster Creek NRC Project Manager Region 1, Administrator Senior NRC Resident inspector, OCNGS P

R

-,ww-m

+

yw w

me,,%---w.7*--vviw ew v a'

-t+W

> ~ "

,4

,e *.

s ATTACHMENT A PROJECT LISTING INTEGRATED SCHEDULE SEMIANNUAL UPDATE (DECEMBER 1992) e-m 4

e w-

l l<

1l ll)l)lIli

,j li

)1l;l i

\\l 29C ED 2

0 F

O SA S

U N

I O

~

A I

T T

S A

C I

R R

T R

R I

N N

S S

A IC C

N I

E

. T L

S U

I D

L

/

E ES LR R

R CA 4

2 T

YE 1

9 C

CY C

S E

ST J

C D

E O

U E

C R

R T

P P

A A

R R

G Y

. E R

E O

E E

G HT T

E TE R

T E

O N

A NM T

C C

E R2 I

EO 2O9 WT N

9T/

S T

O

/A1 R

N E3 I

0I3 C

O B%

T 1 U/

E I

A

/M2 R

T EC C

4I1 T

A IO I

S N

C T

F N

Y S

I D

I OEB F

YN T

E Y

I LA R

DTG N

D P

E E

N O

O ~

! 0UE TOT O

PS C

TFI IT 6SN R

L U

S P

T1 I

O I NE I

U4RB T

COT R

O ER A

I C

T WU I

NTN OT3 U

OEO S

KBP 6

M ILI ED IT N

I TPT B

AO0 S

PMA D

I5 DMOC A

NRLT ARECI B

OALSR CAX F

M

/

IYAUF IYEWI E

T TBC L

DT L

A SM P

CIR A

C T

NO0 E

RLE H

Y S

IC1 R

NAC C

C

/

R Y

E R

B O

M G

U E

N T

A R

5' 1

M C

E 6 '

0 1

AB 9

Y BM 2

2 B

U 0

0 N

4 4

TRO S

1 2

S BO

>- w l4 518 jl4 }:i)

  • I! 1t )l1;L !:A!I.

1 ii l1i TI f 1I4e

,k 4

f

};

OYSTER CREER PROJECT LISTING

'e NRC IFTEGRATED SCHEDULE KTW PROJECTS.

" BA NUMBER CMANGE CATTGORY

'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 02DEC92 OBS BA DESCRIPTION CYCIE/

CIASSITICATICN NUMBER YEARS 3 315302 SEF M PIC 111-1 14 NRR INCORPORATE RESULTS IN AN LTDATE TO THE FSAR.

4~

402910 C R RECORDERS 14 MRR CR REMOVE AND REPIACE 1 DEFICIENT / OBSOLETE RECORDER - REDOCE OPERATOR ERROR.

NUPEG 0737 SUPP. 1

.N.

5 402944 RX BLDC ROOT FRAME 14 NRR 119 ADD BRACING TO THE R B ROOF STRUCTURE 4

TO ENSURE ROOF STABILITY UNDER EIGH WIND 1

IDADS. NRC SEP 4

6 409772 **

ACCESS CONTROL UPCRADE N ROOM 14 NRA PROCUREMENT & INSTALLATION OF RET CARD READER UNITS W/ ALARM FOR CONTROL ROCM l

AND NEW CABIE SPREADING ROOM 7 326216-

.RX VESSEL BELTLINE INSPECTION 14R NRR 119 PERFORM MEASO N TO DETERMINE WEAT EQUIPMENT WILL BE REQUIRED AND WHAT WELDS ARE ACCESSIBLE FOR U.T.

8 328307 RCS AUG - IGSCC INSPECTION - 14R 14R NRR DW RB RB INSPECT PIPING WELDS PER NUREG 0313 REV2 FW/CRD NOZZIZ INSPECTION - 14R 14R NRR 9 328342 **

DW NDE 4 FW & CRD RETL%N NOZZIES.(EXTERNAL UT INSPECTION). NUREG 0619 REQ'TS.

na.,

-~

M l

OYSTER CREEK PROJECT LIST ING IICEND NRC INTEGRATED SCHEDULE STW PROJECTS.

BA NUMBER CMA.*CE CATT"CORY

  • B' PRCL.7ECTS STATUS AS OF 02DZr92 SORT SY CATECORY/CitCIE/BA CTCZE/

CIASSIFICATICN OBS DESCRIP'.

l YEAPS Zn 14R NRR 10 402886 RPV CAPSULE 42 119 INSTALL CAFSUIE 92 IN REACTOR VESSEI.,

NUREG 0822.

14R NRR I1 402894 C.C. DEIETION OF CONTAINMENT SFRAY AUTU i

490 CR i

I REPIACE C.S. MODE SWITCH W/TWO FEY-14CFID SWITCPIS, LOCAL WIRING CHANCES.

PREVENT SYSTEM AL"U-START.

14R NRR 12 402900 ISO CONDENSER PIPING KuS

.p RB e

PERFOPJi STFISS IMPRONTMEST OF TPE ISO W

CONDENSER NEW NG PIPING INSTALIED IN 13R.

14R NRR 13 402910 C R RECORDEPS CR RDotT AND REPIACE 3 DEFICIENT / OBSOLETE RECORDERS - REDUCE OPEPATOR ERROR.

NUREG 0737 SUPP.1 14R M

14 402936 CPM /DW ISO VALVE MOD TO PRECLt,OE AUID FE CR INSTALIATION OF POSITION SWITCEES AND WIRING CHANGES FOR VALVES V-38-9,19.16 s

17. NUPEG-0737 ITEM II.E.g.2 14R NRR 15 402946 CONTAINMENT. ISf4ATION VALVE FIPIACEMENT RB DW REPIACE BALL VALVES AND INSTAIL SPECTACIE FLANGE ASSEVELIES.

14R REL 16 402950 DRYWELL CORROSION CONTROL DW RB COAT THE EXTERIOR OF THE DRYWEIL WHERE NECESSARY, REMOVE SAND PROM TFE SANDBED REGION, AND PERFORM LT INSP.

9'

.OYSTEF

~

r

. OJEC' LTSTING NRC INTECRATED SCHEDULE NEW PR(XJECTS.

    • BA NUMBER CHANCE CATECCAY
  • B' PROJECTS SORT BY CATEGORY / CYCLE /BA STAn1S AS OF 02DEC92 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER-YEARS 17.402968 O C HARDENED VENT 14R NRR PB TR INSTALL 10* PIPING VENT SYSTEM FROM N2 PURGE TO THE MAIN STACK, NRC CL 89-16.

18 326216 RX. VESSEL BELTLINE INSPECTION 15R NRR 119~

UT ACCESSIBLE WELD SPAMS IN THE RPV BELTLINE REGION.INSPECTICT.S WILL BE DONE RMOTELY. ASME SECT. XI REQUIREMENTS

.b 19 32 hrs ICS AUG - IGSCC INSPECTION-15R ISR NRR

'DW RB75 RB95 INSPECT PIPING WELDS PER C.L. 88-01 AND NUREG 0313 REV.2 1

20 328030 CNTL RM HUMAN FACTCPS DESCN REVIEW 15R NRR L

CR REPAINT,REPURBISH C RELABEL CR PANELS 1R THRU 10R,6KR,11XR,12R,12XR,14R,14RR, 16R AND 11F,9XR&11R.NUREC.0737 SUP 1.

21 -328200 RCS STRESS IMPROVEMENT ISR NRR

. DW 'RB23

- PERPORM STRESS LMPRO7EMENT ON SELECTED STAINLESS STEEL PIPING WELDS IN RCS SYS.

i

- 22 402910 C R RECORDEPS ISR NRR CR REMOVE AND REPLACE 7 DEFICIENT /OBSOIETE

-PICORDERS - REDLU OPERAIOR ERROR.

!!UREG 0737 SUPP. 1 23 ^402974

-OC RK OVERFILL PROTECTION SYSTEM 15R NRR CR

' MODIFICATIONS TO FW REGULATING VALVES

. AND FW PUMP B TRIP CIRCUITRY.

NRC GEN.1 LETTER 89-19

, e O'YSTER CREEK P'RCJECT LISTINC i

LECEND NRC INTECRATED SCHEDULE NEW PROJECTS.

    • BA NUMBER CHANGE CAITGORY

'B' PROJECTS SORT BY CATECORY/ CYCLE /BA STATUS AS OF 02DEC92 OBS-BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 24 403005 "

REC CUIDE I.97 INSTRUMENTATION 15R NRR CR REPLACE / INSTALL RX WATER LEVEL FUEL ZONE RECORDERS AND PROVIDE POWER SUPPLIES AND NEN POWER DISTR. SYSTEM PER RC 1.97 25 328AHE "

RCS AUG-ICSCC INSPECTION-16R 16R NRR RB DW INSPECT PIPING WELDS PER NUREC 0313 PEV2 26 402011 OC REPLICA SIMUIATOR 87-92 NRR 3

DESIGN, FABRICATE, INSTALL A SLMUIATOR DUPLICATING THE OC CONTROL RM FUNCTIONS (CPUN IETTER C321-91-2293).

27 328226 SQUG PROGRAM IMPLEMENTATION 87-95 NRR' ESTABLISH SEISMIC QUALIFICATION IVR OYSTEE CREEK. SCOPE INCLUDES WALKDOWNS IN Ot. TRACE ISR AND EVALUATIONS.

28 328205 SQUG SUPPORT I PARTICIPATION - BWROG 87-97 NRR PARTICIPATION IN SEISMIC QUALIFICATION UTILITY CROUP' FOR EQUIP SEISMIC QUA-LIFICATION. UNRESOLVED SAFTTY ISSLT.

29 328312

MOV PROGRAM

'90-94 NRR DESIGN BASIS REVIEW, STRESS ANALYSIS

.AND TESTING OF MOV'S IDENTIFIED BY THE PROGRAM PER NRC GL 89-10.

k u.

m..

.o-O OYSTER-CREER PROJECT L I S T:1 18 C LEGEND NRC INTEGRATED SCHEDULE NEW PR(\\IECTS.

    • BA NUMBER CHANGE CATEGORY

'C' PPOJECTS SORT BY CATEGORY / CYCLE /BA -

STAIUS AS OF 02DEC92 OBS BA DESCRIPTION CYCLE /

CIASSIFICATION NUMBER YEARS L

'30 402823 CROUNDING & LIGHTNING PROTECTION 14 ISM YARD TB-INSTALL LICHTNING PROTECTION F;4t PIANT STACK AND TURBINE BUILDING 31 322036 D.W. SCAFFOIE & INSUIATION 14R CWC DW INSTALL SCAFFOLD IN D.W. *10 SUPPORT ALL ACTIVITIES. REMOVE AND REINSTALL D.W.

INSUIATION. REMOVE SCAFFOIS 2

32 323624 VALVE MAIrrrDULNCE & OVERHAUL-13/13U/14R 14R MRC TB DW RB CORRECTIVE & PREDICTIVE PAINTE?ULNCE OF SELECTED VALVES.

33 323629

'CRD HCU MODULE REBUILD-14R-14R MRC RB REBUILD 35 CRD HYDRAULIC CONTROL UNITS 34 323637 CHECK VALVE MONIIORING/INSP. PROGRAM 14R RZL RB TB OPEN AND INSPECT CEECK VALVES THAT-

+

EIMIBIT OPERATIONAL PROBLEMS INPO-SOER 86-03 35 323646

'IURBINE-GENERATOR SYSTEMS INSPECTION-14R 14R MRC' TB-INSPECTION OF THE n.'RBINE,CENERATOR, AND ASSOCIATED SYSTEM COMPONE?rrS' AND VALVES DURING 14R 36 323648 CONT ISOIATION VALVE MAINT-14R 14R NRR RB DN

' REFURBISH CONT ISO VALVES IDENTIFIED BY LLRT'S &ILRT'S. APPROX 15 VALVES I

t i

._m.

e OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE

.NEW PROJECTS.

    • BA NUMBER CHANCE

.. [

CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 02DEC92 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 37 323651

' ASBESTCG AeATEMENT-14R 14R ORR TB RB REMCP/AL/ REPLACEMENT OF ASBESIUS IAGGING MATERIALS OSHA CFR 1910.1001 P

38 323659 REFUEL FIDOR-RX DISASSEMBLY / REASSEMBLY 14R MRC 119 TASES ASSOCIATED WITH RX DISASSEMBLY AND REASSEMBLY, AND SUPPORTING ACTIVITIES N

39 326213 OUTAGE ISI-14R 14R NRR RB DW TB INSPECT HANGERS, PIPING WELDS,

& COMPONENTS TO SATISFY.SECTION XI REQUIREMDTM APPROX. 264 INSPECTIONS 40 328295 PIPE WALL THINNING-14R 14R ISM f

RB TB RD1Cf3 INSUIATION, PREP SURFACES & PERFORM UT ON SELECTED PIPIN2 SYSTEMS.'POSSIBLE REPIACEMENT OF FITTINGS / PIPING.GL 87-08 41 328308 RCS PIPING REPAIR CONTINGENCY 14R MRC DW CONTINGENCY FOR IGSCC FINDINGS.

ASSUMES ONE 6' OVERIAY IN RWCU AND.

INSP OF 9 ADD'L WELDS.

+

t 42 328310 RX INTERhAL' INSPECTION 14R' NRR 119 DW VISUAL INSPECTION OF SEIECTED INTERNAL '

COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES.

43 402901' FEEDWATER SYSTEM IMPROVEMENTS 14R REL CR NCSK CABLE FULLING AND MINOR CONTROL ROOM PANEL PEARRANGEMENT IN PREPARATION FOR THE ISR OUTAGE.

'-"'Y 7

'C-

-i -- -

--.u -:-.-

6.

-h o

OYSTER CREEK PROJECT LISTING LECE?C NRC INTEGRATED SCHEDULE

    • BA NUMBER CHANGE CATEGORY
  • C' PROJECTS STATUS AS OF 02DEC92 l

SORT BY CATEGORY / CYCLE /BA BS BA DESCRIPTION CYCLE /

N SIFICAT M FEMBER l

t 44 402925 CEhTRAIVR PROTECTION UPGPADE 14R ISM l

CR ADD CABIE TRAYS AND CULING IN THE CONTROL ROOM IN PREPARATION FOR ISR 45 402929 DIGITAL PICIRC FILM CONTROL 14R 14R REL i

CABLE PULLING AND MINOR CONTROL PAhTL REARPANCEMEVT IN PREPARATION FOR THE 15R 05ffAGE.

3>

45 402939 DRYWELL EXPOSURE REDUCTION MODS.

14R RAD DW INSTALL IMPROVED RIGGING FOR MSSV'S AND EMRV'S.

47 402951 H2/02 ANALYZER MODIFICATION 14R NPR f

DW RB l

REPLACE INBOARD TARGET ROCK V M/E3, REIDCATE CONTAINMI2:T ISOLATION VALVES, PROVIDE APP.J LEAK RATE TEST CONNECTIONS 49 402963 LP-A L-0 BJRBINE BLADE FIPIACEMENT 14R ISM TB REPLAC2 MENT OF LP 15TH STAGE BLADES ON

  • A " LOW PRESSLPE TURBINE 49 402996 CORE SPBAY SYSTEM UPGRADE 14R REL RB CR PROVIDE INDEP. CONTROL SWITC5IES FOR PARAT.r FT. INJ VLVS.NEW SMAr.r.5't CAPAC. REL VLVS. t. PULL-TO-LOCK SMITCHES FOR PLMPS 14R REL 50 408836 VALVE RETIACEMENT RB TB REPLACE SE7ECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES.

f l.

i '

OYSTER CREEK P R O'J E C T L l' S 'T I NG

==--- - - - - - =....... -......

t LEGEND

^

NRC 1 NTEGRATED SCHEDULE NEW PROJECTS 3

BA NUMBER CHANGE CATEGORY

'C' PROJECTd SORT BY CATEGORY / CYCLE /BA.

STATUS'AS OF O2DEC92

............----....-------..............-------.---.---.~....-.--.--.------- ------ -------------------------------- =-

- - = -

OBS BA DESCRIPTION CYCLE /

CLASS 1FICATION-NUMBER YEARS

.............=----==.....--....-

51 402ACZ SITE EMERG. BLDG. EMERG. POWER SOURCE 15 NRR INSTALL AND CONNECT 500 KVA 480V DIESEL

. POWERED GENERATOR FOR STANDSV POWER TO THE-TECH.' SUPPORT CENTER.

52 323LO5

' TURBINE VALVE fNSP.-NML-15R.

15R MRC

~

e

-INSPECT TURBINE ASSOCIATED VALVES TO.

BlfCKETS ON A,B,&C LP AND OTHER COMPONENT AS PRESCRIBED BY NML OR MANUF.

53 323LO7

. CONTAINMENT ISOLATION VALVE MAINT 15R NRR RB DW D..

PERFORM CORRECTIVE MAINTENANCE ON

.E CONTAINHENT VALVES WHICH DO NOT PASS LLRT --

54 323L13 ASBESTOS ABATEMENT 15R ORR CB.

LEVEL OF EFFORT ASBESTOS REMOVAL TO SUPPORT OUTAGE WORK 55 323L22 REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 15R MRC TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND. REASSEMBLY AND SUPPORTING ACTIVITIES 56 323L34 VALVE MAINT & OVERHAUL 15R MRC RB TB "DW CORRECTIVE AND PREDICTIVE MAINT ON

^-

SELECTED VALVES 57'-323L38

~CRD HCU REBUILD 15R.

.MRC RB REBUILD 35 CRD HYDRAULIC CONTROL UNITS y--,

s

LISTING

~

PROJECT CREEK OYSTER SCHEDULE LEGEND INTEGRATED

...... - - -. - ~ ~. -.

NRC NEW PRa7ECTS.

BA NUMBER CHANGE CATECORY *C' PROJECTS STAWS AS OF 02DEC92 CLASSIFICATION CT1E/

SCRT BY CATECCRY/ CYCLE /BA YEARS DESCRIPTION' OBS BA NUMBER MRC ISR LPB TURBINE AND CENERATOR INSP-15R 58 323L47 INSPECT LPB AND GEhTRATOR AND OIHER TB TURRINE RELATED COMPONENTS FOR NT4L CWC REQUIREMENTS AND MANUF. SUCCESTION 15R DRYWELL SCAPPOLDING & INSUIATION 59 326L14 L

INSTALLSCAFFOID IN D.W. TO SUPPORT AL DW D.W.

ACTIVITIES. RIET & REINSTALL NRR EDWAT SCAFFOLD 15R INSULATION.

y OUTAGE ISI-15R sw O

'60 32694J ALL INSPECT HANGERS, PIPING WELDS,&

COMPONENTS TO SATISFY SECTION XI NRR REQUIREMENTS 15R RX V INTERNAL INSPECTION. ISR 61 328ADL 119 RNAL VISUAL INSPECTION OF SELECTED INTECOMPONENTS AND SURFA REL ASME CODES.

iSR RCS PIPING REPAIR CONTINGENCY 62 328AFQ DW RB CONTINCENCY FOR ICSCC FINDINGS 6-)

ASSLHE TWO UVERLAYS(ONE 10* AND ONE ISM AND ADD'L INSP. SAMPLE OF 19 WELDS 15R PIPE WALL THINNING-15R 63 328 AGE TB RB REMOVE INSUIATION, PREP. SURFACE 3 S.

PERFORM UT ON SELECTED PIPING SYSTEMPOSSIBLE REPN G

NPR 15R

]

SQUG MOUS INO 33ptEgENT m DS RESL INED.

pgtypOWN IN 15R.

' OYSTER C R E E Et PROJECT LISTIEG 3

IEGEht NRC 1NTEGRATED SCHEDULE NEW PROJECTS.

PA NUMBER CPANGE CATEGCRY

'C' PROJECTS STATUS AS OF'02DEC92 SORT BY CATTCORY/ CYCLE /BA OBS BA DESCRIPTION CYCLE /

CIASSITICATION YEARS NUMBER 4

58 323L47 LPB TURBINE AND GENEEATOR INSP-15R ISR MRC

]

TB 4

INSPECT LPB AND CENEPATOR AND OTEER 1URBINE REIATED COMPONTNTS FOR PML REQUIREMENTS AND MAN 1JF. SUGGESTION 59 326L14 DRYWELL SCAFFOIEING & INSUIATION 13R GWC iM '

INSTALLSCAFFOID IN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.

3 INSUIATION. PIMotT SCAFFOLD i

e.

ISR NRR OUrAGE ISI-15R 60 32694J **

At!.

INSPECT FJLNCERS, PIPING WEIDS,&

COMPONENTS TO SATISFT SECTION XI REQUIREMENTS 61 328ADL RX V INTERNAL INSPECTION-ISR iSR NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQ'D BY ASME CODES.

62 328AFQ RCS PIPING REPAIR COh"rINGENCY ISR REI.

DW RB CONTINGENCY FOR IGSCC FINDINGS AS M TWO OVERLAYS (CiB 10" AND ONE 6*)

AND ADD *L INSP. SAMPIJJ OF 19 WELDS PIPE WALL THINNING-15R 15R ISM 63 328AGZ **

TB RB REMOVE INSULATION, PREP SURFACE &

PERFORM LTE ON SELECTED FIPING SYSTDfS.

POSSIBIE REPIACEMENT OF FITTINGS / PIPING ISR NRR 64 402ABQ SQOG MODS IMPIN MODS RESULTING PF.Ur4 SQLt WALEDOmi IN ISR. SCOPE NOT YPT DEFINED,

W.

OY STER CREEK PROJECT LISTINC

,e LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 02DEC92 SCRT BY CATEGORY / CYCLE /BA CYCLE /

CLASSIFICATION DESCRIPTION YtARS HS BA NL74BER ISM ISR DUAL VALVE INDICATION REMOVAL

'H 1 65 402736 CR RB REPLACE DOUBLE VALVE INDICATION LIGHTS IN C.R. PfM 1F/2F, 11F. INSTAL NEW CABLING FROM R.B. TO C.R.

MRC 15R RX RECIRC PUMP & MOTOR VIBRATION MONITRS 66 402821 DW RB CR IlsSTALL VIBRATION MONI'IURING TRANSDOCERS AND SUPPORT EQUIP. FOR 4 RECIRC PLMPS 7 TRANS./ PUMP AND 5 FOR 1 PUMP.

MPC 15R REPL UPPER TB & OLD MACHINE SHOP ROOP

[

67 402898 YARD REPLACE THE UPPER 1tRBINE BUILDIPE ROOF.

REL ISR FEEDWATER SYSTEM IMPROVZMENTS 68 402901 CR NCSR REPLACE ANALOG CONTROL JYSTEM WITH DIGITAL.

ISM ISR 69 402925 GENERATOR PROTECTION UPGRADE TB ADD REIAYS.'LND AIARMS TO PROTECT THE GEN AS PER PJM RECOMMENDATIONS.

REL 15R DIGITAL RECIRC TIOW CO9 TROL 15R 70 402929 CR REPLACE GEMAC HARDWARE WIW DIGITAL SYSTEM. THIS SCOPE HAS BEEN INCLUDED IN B/A 4029018.

RAD ISR DRYWELL EXPOSURE REDUCTION MODS.

71 402939 DW INSTALL SHIELDING ON VARIOUS COMPO?E2TPS IN THE DRYhTLL l

H' O

Y OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCEEDULE hTW PROJECTS.

EA NLHEER CHANGE CATEGORY

'C' PROJeTTS STAnS AS OF C2DEC92 SORT BY CATTACRY/CYCIE/BA 3CIE/

CIASSITICATION CBS BA DESCRIPTION YTARS NLHBER ISR RAD 72 402939 DRYWELL EXPOSURE PIDUCTION MODS.

DW INSTALL. IMPROVED EQUIPMENT IN 1~8 SLHP AND HYDPOLAIE AND RECOAT 1-B SLHP ISR NRR 73 402951 H2/02 ANALYZER MODIFICATION RB CR P2PIACE EXISTING EQUIPMENT WITH *EXD-SENSOR" EQUIPMENT IN RX BUILDINC A*.*D CONTROL ROOM,REPIACE SWITCHES L

ISR REL 74 402957 OC IA93 ANAIDG CONVERSIOM RB CR REPIACE 5 1AB3 PRESS SWITCEES WITH A*zAIDG SYSTEM.

15R MRC 75 402961 OC EDG OUTFLT CONTROL MODIFICATION TB REPIACE THE EXISTING GOVER!OR WITH A WOODWARD AUTOMATIC GEN IDADING C05"IltOL.

REPLACE MISC. EIECTRICAL COMPONENTS.

ISR ORR 76 402966 RECIRC FIDW SCRA*t EIECTRONICS REPLACEM*T RB CR REPIACE EXISTING ELECI1 TONICS WITH DIGITAL EIECIRONIC EQUIPMENT.

ISR FIL 77 406L24 VALVE REPIACEMENT-15R RB TB DW REPIACE SELECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES 16R MRC 78 323LO3 LPC EIRBINE INSP.-16R Tis INSPECT LPC AND CTIHER TURBINE REIATED COMPONENTS IVR NML NML REQUIREMENTS AND MANUF. SUGGESTION

r8 A._

9 OYSTER C R E.E K P.R O J E C T LI ST1 NG LEGEND-NRC 8 NTEGRATED SCHEDULE

  • . NEW PROJEdTS.
    • '. BA *JMBER CHANCE-CATEGORY 'C' PROJECTS STATUS AS OF O2DEC92D

. SORT BY CATEGORY / CYCLE /BA OBS-

'BA DESCRIPTION CYCLE /

CLASSIFICATION YEARS NUMBER 79 -323LO6 TURBINE VALVE lNSP.-NML-16R 16R MRC INSPECT TURBINE RELATED VALVES TO SUPPORT NHL. REQUIREMENTS 80 323LO8 ~

CONTAINMENT ISOLATION VALVE MAINT-16R NMR PERFORM CORRECTIVE MAINTENANCE ON VALVES WHICH DO NOT PASS LLRT 81 323L14 ASBESTOS ABATEMENT 16R ORR D.

CB j,.

LEVEL'OF EFFORT TO REMOVE ASBESTOS TO SUPPORT OUTAGE WORK

- co.

l 82 323L23-REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 16R MRC l

119 1

TASKS ASSOCIATED WITH REACTOR'

' DISASSEMBLY AND REASSEMBLY'AND SUPPORTING' ACTIVITIES 83 323L35 VALVE' MAINTENANCE & OVERHAUL 16R MRC

'RB-

'TB. ' DW

. PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED' VALVES CRD HCU REBUILD 16R

-MRC

-84 323L39'-

.RB

.. REBUILD 35 HYDRAULIC CONTROL' UNITS 35 326L151 DRYWELL SCAFFOLDING k. lNSULATION 16R GWC DW

~ lNSTALL SCAFFOLD IN D.W. TO SUPPORT ALL l ACTIVITIES. REMOVE & REINSTALL D.W.

' INSULATION. REMOVE SCAFFOLD

}

. -e

~

OYSTER CREEK PROJECT LISTING I

i LEGEND NRC INTEGRATED S C H E D U I. E NEW PROJECTS.

j

)

    • BA NUMBER CRANCE CATECORY

'C' PROJECTS

, SORT BY CATEGORY / CYCLE /BA STATUS AS OF 02DEC92 i

'I OBS BA.

DESCRIPTION CYCIZ/

CLPSSIFICATION NUMBER YEARS OUTACE ISI-16R 16R NRR 86 32696G E

l i

INSPECT HANGEPS4 PIPING WELD,6 COMPONENTS TO SATISFY SECTION II j

REQUIREMENTS 87-328AHA **

PIPE WALL THINNING-16R' 16R ISM RB

'TB 1

REMOVE INSULATION, PREP SURFACES &

PERFORM UT ON SELECTED PIPING SYSTEMS.

y e'

POSSIBLE REPLACEMENT OF FITTINGS / PIPING W

88 '328AHD **

RK. VESSEL INTERNAL INSPECTION 16R NRR 119 VISUAL INSPECTION OF SEIECTED INTERNAL j

COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 89 402ABQ SQUG MODS 16R NRR IMPLE2(ENT MODS RESULTING FROM SQUG WALKDO6N IN ISR. SCOPE NCTP YET DEFINED j

90 402948 LP WRB. C IAST STAGE BLADE INSTALLATION 16R FIL TB REPLACE IAST STAGE BLADES IN LP WRBINE

  • C". BLADE FAILURE CONCERNS.

'91 408L25 VALVE REPLACEMENT-16R-16R REL

'RB TB DW.

REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES l

92 402880 0.C. FUEL POOL CORE OFF IDAD (STUDY) 87-96 ORR' i

ESTABLISH ADDITIONAL SPENT FUEL STORAGE CAPACITY FOR FULL CORE OFFLOAD

.BEYOND 1996 AT O.C

+

4 OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PRaTECTS

    • BA NUMBER CRANGE -

CATEGORY *C*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 02DEC92 OBS '

BA.-

DESCRIPTJ ON CYCli CLASSIFICATION NUMBER YEARS 93 402943 CONFIGURATION MANAGEMENT-DBD 1991-92 91-92 ISM DEVELOPMENT OF CC SYSTEM DESIGN BASES.

PERTORM SSP'S AND IMPROVE DRAWING LEGIBILITY 94 409244 REPLICA SIMUIATOR MODS 92 hT.R UPGRADE THE SIMUIATOR TO MATCH PIANT MODS AS APPLICABLE.

>b 95 328148 0.C. PLANT LIFE ASSURANCE & EXTENSION 92-95 REL (n

DEVEIEP 3-PEASE PLEX PIAN. PHASE 1 TO DETERMINE FEASIBILITY AND COST /

. ANALYSIS OF PLEX.

96 402982

. INDIVIDUAL PLANT EXAM. - EXTERMAL EVENTS 92-95 NRR PERFORM IPE ANALYSIS OF EXIERNAL EVENTS FOR SEVERE ACCIDENT VUIRERABILITIES BY 6/39/95. BUT NO LATER THAN 12/22/95 97 402980 CONFIGURATION MANAGEMENT-DBD 92-96 92-96 ISM I

DEVEIEPMENT OF OC SYSTEM DESIGN BASES PERTORM 4 TO 5 DBD'S PR YEAR OVER 5 YEARS

-98 409229 KUMARC PROCUREMENT INITIATIVE 92-96 NRR IMPROVEMENTS *tO PROCLPIMENT OA TO MEET THE REQUIREMENTS OF TIE NUMARC PROCUP.E-MENT AND NP4 GEN LTTt.

99 40993E REPLICA SIMULATOR MODS 93 NRR UPGRADE THE SIMUIATOR TO MATCH PIMTP MODS AS APPLICABLE

..( ~

. OYSTER CREEK PROJECT L I S.T I N C LEGEND NRC INTECRATED SCHEDULE

- - +

'NEW PROJECTS BA NUMBER CHANCZ '

CATEGORY

'C' PROJECTS STATUS AS OF 02DEC92 SORT BY CATECORY/ CYCLE /BA CYCIE/

CLASSIFICATION OBS

' BA DESCRIPTION YEARS NLMBER

]..

100 402981 ACCIDENT MANAGEME*ff GUIDELINES 93-95 NRR DEVEIDP ACCIDENT PULNAGEMENT GUIDELINES TO COPE WITH DA%%CED CORE EVENTS r'

(PART OF IPE REQUIREMENTS, G.L. 88-20).

94 NRR 101 409948 REPLICA SIMUIATOR MODS UPCRADE THE SIE U TOR TO MATCH PLANT

' MODS AS APPLICABLE y

E

~

95 NRR Ch 102 409L10 REPLICA SIMULATOR MODS MODIFY THE SIMULATOR AS NECESSARY TO 3

MAINTAIN LIKENESS WITH CONTROL ROOM AS REQUIRED t

i' e

t G

4

- m.

?

.g ABC Classifications a)

Meet NRC Recuirements (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.

b)

Meet Environmental Reauirementi (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c)

Meet Other Reauirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

d)

Increase Safety Haroins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.

e)

Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f)

Imorove Radioloaical Condition (RAD) - Activities $ hat, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

g)

Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment, includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently, h)

Imorove Reliability /Cacability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.

1 A-17 l

9

.4_

ABC Classifications (continued) i)

Imorove Operational Effectiveness (10E) - Activities that, if implemented, will improve staff efficiency or provide a direct economic-payback in terms of reduced operating / maintenance costs, j)

Imorove Personnel Facilities (FAC) - Activities th4t, if implemented, will improve working conditions and the usefulness of personnel facilities.

k)

Provide Continoency/B14niti (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to-emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1)

Japroves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.

.M.

=

i A-18

+.

.?

1 4

ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE SEM1 ANNUAL UPDATE CATEGORY"A" PROJECTS COMPLETION:

NONE DELETIONS:

NONE SCHEDULE CHANGES:

NONE OTHER CHANGES:

NONE

[de '.

e B-1

i

't^.

4-CATEGORY "B" PROJECTS COMPLETIONS:

328295 Erosion / Corrosion Program 402959 0.C. Probabilistic Risk Assessment - IPE (GPUN Letter C321-92-2201 dated August 14,1992)

DELETION:

409773 Access Centrol Upgrade - Reactor Building Icvc

16) has been cancelled pursuant to GPUN Lcti C321-92 2246 dated September 14, 1992.

SCHEDULE CHANGES:

315302 SEP Topic III-1, Classification of Structures, Components, and Systems will be included in the next FSAR Update scheduled for_ July 1993 (Cycle changed from 13 to 14).

328342 FW/CR0 nozzle inspection has been changed from the 15R to 14R outage, pursuant to NRC letter dated November 25, 1992.

402900 Stress improvement of the new isolation condenser piping has been changed from the 15R to 14R outage, pursuant to NRC letter dated July 8,1992 (TAC Nos.

M41437 and M41475).

402910 Schedule has been revised to replace three recorders in 14R, one during Cycle 14, and _seven in -

15R.

Four other. recorders have already been:

replaced (service water radiation RN-31A_and steam-flow / steam pressure 1075 in the 12R outage, and-drywell pressure 12XR-6X and drywell/ torus pressure 12XR-6 in Cycle 13).

The scope of this BA is unchanged.

OTHER CHANGES:

The following B/A Numbers have been changed:

PREVIOUS NEW 085 #

TITLE B/A B/A 6

Access Control Upgrade 408116 409772 Control Room 9

FW/CRD Nozzle Inspection 328ADA 328342 14R 24 Reg. Guide 1.97 402AG0 403005 Instrumentation 25 RCS Aug. IGSCC Inspection 328LO6 328AHE 16R 402011 0C Reclica Simulator Years changed from 87-93 to 87-92 to coincide with simulator certification (Category A).

i B-2 i

t A

GATEGORY "C" PROJECTS COMPLETIONS:

328325 FW/CRDR Nozzle Mock-up Thermal Fatigue Cracks 409057 Simulator facility CYCLE 13 323638 Spent Fuel Pool Cleanup 326213

-Outage ISI 402823 Grounding and Lightning Protection 402898 Replace Old Machine Shop Roof 402914 ALARA Program 402950 Drywell Corrosion Control 408838 Spent Fuel Pool Cleanup CYCLE 130 402950 Drywell Corrosion Control DELETIONS:

328AFL Chemical Decontamination-15R (An evaluation will be performed by the 2nd Qtr. 1993 to determine if chemical decontamination is needed).

328LO9 RCS Piping Repair Contingency-16R 402CCC Other 0utage Related Activities 402819 Recirc. Pump Motor RTD Circuits Upgrade 408825 Condenser Valve Replacement SCHEDULE CHANGES:

323624 Valve maintenance and overhaul, scope planned for Cycle 13 and 13V will-be completed in the 14R outage.

323637 Check valve scope planned for Cycle 13 and 13V will be completed in the 14R outage.

323648 Containment isolation valve maintenance sco)e planned for unscheduled outage 130 will 3e completed in the 14R outage.

402898 Upper turbine building roof replacement has been changed from Cycle 14 to the 15R outage.

402901/

Digital FW/Recirc Control System Modification has 402929 been changed from the 14R to the 15R Outage.

Cable pulling and minor control panel work will be done in the 14R Outage.

408836 Valve replacement scope planned for unscheduled outage 130 will be completed in the 14R outage, i-B-3

F,,

i f

4 CATEGORY 'C" PROJECTS (continued)

OTHER CHANGES:

The following 8/A Numbers have been changed:

PREVIOUS NEW Dill _f IIILE B/A

.Ila_

60 Outage ISI-15R 326LO2 32694J 63 Pipe Wall Thinning - 15R 328L01 328AGZ 86 Outage ISI -16R 326LO3 32696G 87 Pipe Wall Thinning - 16R 328LO2 328AHA 88 Reactor Vessel Internal Inspection - 16R 328LOS 328AHD

  • A,*