ML20126A181

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1992 for Joseph M Farley Nuclear Plant,Units 1 & 2
ML20126A181
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1992
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20126A173 List:
References
NUDOCS 9212180027
Download: ML20126A181 (9)


Text

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS November,-1992 The cycle 11-12 refueling outage continued through the month of November.

The following major safety related maintenance was performed during the month of November:

1. Performed testing and maintenance on various safety-related hydraulic and mechanical snubbers.
2. Performed numerous maintenance tasks on the reactor coolant pumps including seal inspection and main flange stud elongation checks.
3. Performed numerous maintenance tasks on the auxiliary feedwater pumps.
4. Replaced the tube bundle in the 600 volt load center IE room cooler.
5. Performed various design changes on the service water system-including the replacement of some existing carbon steel piping-with stainless steel.
6. Replaced one main steam safety on each main steam line.
7. Performed various design changes in 600 volt load centers including calibrating "Agastat" relays.
8. Performed miscellaneous corrective and preventive maintenance on the diesel generators.
9. Performed internals inspection on various service water and component cooling water check valves,
10. Performed eddy current _ testing, sleeving of tubes, and plugging of tubes in all three steam generators.

9212100027 921214 PDR ADOCK 05000340 R. PDR

,6J ,,, - e J -----a -- --- - --_,ws-,6 OPERATING DATA REPORT DOCKET NO. 50-348 DATE December 8.-1992 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS  ;

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: November-1992 1) Cumulative data since
3. Licensed Thermal Power (MWt): 2.652 12-1-77, date of
4. Nameplate Rating (Gross MWe): 860 commerical operation. ,
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7 7 Maximum Dependable Capacity (Net MWe): 812.0
8. If Changes Occur in Capacity Ratings (Items Number 3 lhrough 7) Since Last Report, l Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons for Restrictions, if Any: N/A This Month Yr-to-Date cumulative
11. Hours In Reporting Period 720.0 8.040.0 131.496.0
12. Number Of Hours Reactor Was Critical 34.6 6.489.0 102.399.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 1.650.0
14. Hours Generator On-Line 0.0 6.454.1 100.718.4 15.' Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 257.2 17.036.145.7 258.440.769.2
17. Gross Electrical Energy Generated (MWH) 66.0 5.484.700.0 83.269.462.0
18. Net Electrical Energy Generated (MWH) (11.782) 5.185.162.0 78.599.960.0
19. Unit Service factor 0.0 801 3 76.6

-20. Unit Availability Factor 0.0 80.3 - 76. 6 -

21. Unit _ Capacity Factor (Using MDC Net) N/A 79.4 73.9
22. Unit Capacity Factor (Using DER Net) N/A 77.8- 72.1
23. Unit Forced Outage Rate 0.0 0.0 _ 6.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 12/2/92
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 DATARPT.Ul

DOCKET N0. 50-348 UNIT 1 DATE- December 8. 1992-COMPLETED BY R. D. Hill TELEPHONE (205)-899-5156 MONTH November DAY AVERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)_

1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0' 22 0-7 0 23 0-8 0 24 0 9 0 25 0 10 0 26 0:

-11 0 27 0

-12 0 28 0 13 -0 29 0-14 0 30 0-15 0 31 N/A 16 0 INSTRUCTIONS On.this format, list the average daily unit power level. in MWe-Net for-each _ day in the reporting month. Compute to .the nearest wh' ole megawatt.

AVGDLY.PWR-t - _ _ .- ., . _ _ _ _ . .

t UMT SHUTDOWNS AND POWER REDUCTIONS DOCAET NO. 50-348

' UNIT NAME J M. Fariev - Unit 1 DATE December 8.1992 COMPLETED BY R D. Hat -

REPORT MONTH: NOVEMBER TELEPHONE l205) 899-5156 METHOD OF UCENSEE CAUSE & CORAECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO. DATE- TYPE' (HOURS) REASON' DOWN REACTOR

  • REPORT # CODE
  • CODE
  • PREVENT RECURRENCE 002- 921001 S 720 C 1 N/A N/A N/A The cycle 11-12 refueling continuad from 920925.

1:' 2: 3: 4: 5:.

. F: Forced ' Reason: Method: '. Exhibit G4nstructions for Shibit I- Same Sowee S: Scheduled . 'A Equipment Failure (Explain) . 1 - Manual. Prep rations for Data Entry

. 8 - Maintenance or Test . 2- Manual Scram. Sheets for Ucensee Event '

C - Refueling '  ! 3 - Automatic Scram. Report (LER) File (NUREG4161)

D - Regulatory Restriction 4 - Other (Explain) '

- E - Operator Training & Ucensing Examination F- Administrative G - Operational Error (& plain)

H - Other (Dplain) -

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS November, 1992 There were no unit shutdowns or major power reductions during the month of November.

The following major safety-related maintenance was performed during the month:

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

P

7 OPERATING DATA REPORT DOCKET N0. 50-364 DATE December 8. 1992 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes

-2. Reporting Period: November 1992 1) Cumulative data since

3. Licensed Thermal Power (MWt): 2.652 7-30-81, date of
4. Nameplate Rating (Gross MWe): 860 commerical operation
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 864.3 7 Maximum Dependable Capacity (Net MWe): 824.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:_N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumul ative
11. Hours In Reporting _ Period 720.0 8.040.0 99.409.0
12. Number Of Hours Reactor Was Critical 720.0 6.413.6 85.277.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 720.0 6.244.2 84.172.7
15. Unit Reserve Shutdown Hours 0.0 0.0 -00
16. Gross Thermal Energy Generated (MWH) 1.890.053.9 15.619.568.6 214.578.890.2
17. Gross Electrical Energy Generated (MWH) 621.225.0 5.072.345.0 70.3682 429.0
18. Net Electrical Energy Generated (MWH) 591.885.0 4.791.953.0 66.726.015.0
19. Unit Service Factor 100.0 77.7 84.7

-20. Unit Availability Factor 100.0 __.

7 i .- 7 84.7

21. Unit Capacity Factor (Using MDC Net) 99.8 72.3 81.9
22. Unit Capacity Factor (Using DER Net) 99.2- 71.9 81.0 -
23. Unit Forced Outage Rate 0.0 3.1 4.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of-Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81-DATARPT.U2

' DOCKET NO, 50-364 UNIT 2

.DATE~ December 8. 1992' COMPLETED BY R. D. Hill ,

TELEPHONE (205) 899-5156 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE-DAILY POWER LEVEL:  ;

(MWe-Net) (MWe-Net) 1 816 17 827 2 815 18 826 3 814 19 823 4 814 20 810 5 822 21 804 6 828 22 814 7 829 23 ;22 8 829 24 820~

9 827 25 816 10 826 26 824-11 823 27 812 12 816 28 828 13- 826 29 827 14 827 827 15- 826 31 N/A 16 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

AVGDLY.PWR

UNIT SHUTDOWNS AND POWER REDUCTIOMS ~

DOCKET NO. 90FA UNIT NAME J M. Fariev - Unit 2 DATE December 8.1992 '

COMPLETED BY R D. Hiit

- REPORT MONTH: NOVEMBER TELEPHONE (2051 899-5156 METHOD OF UCENSEE CAUSE & CORRECTIVE DUPATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO DATE TiPE' REASON' DOWN REACTOW REPORT # CODE

  • CODE
  • PREVENT RECURRENCE NO. (HOURS)

There were no unit shutdowns or major power reductions during the month of November l

l

'l

. 2- 3: 4: 5: '

1:

F: Forced Reason: - Method. Exhibit G-instructions for Exhibit I- Same Source

. S. Scheduled - . A - Equipment Failure (Explain) 1 - Manual . Preparations for Data Entry j B - Maintenance or Test. 2 - Manual Scram Sheets for Ucensee Event C - Refueling . 3 - Automatic Scram, Report (LER) Ole (NUREG4161)

D - Regulatory Flestriction ' 4 - Other (Explain)-

' E Operator Training & Ucensing Examination F- Administrative G - Operational Error (Explain)

- H - Other (Explain)

- - -. . w. -_.

a; . _ ~ - - .-.

.-..(.

- . - - - ~ . - -

JOSEPH M. FARLEY NUCLEAR PLANT ADDENDUM CONCERNING REVISION'T0 THE OFFSITE DOSE CALCULATION MANUAL Temporary change 10A to the Offsite Dose Calculation Manual (ODCM) was approved by the Plant Operations Review Committee (PORC) on September 14, 1992. This temporary change was incorporated into revision 11 and approved by the PORC on December 1, 1992. The ODCM was revised to include a specific step showing the calculation of the actual (anticipated) dilution factor available for a liquid effluent release and to modify the manner in which concentrations of non-gamma-emitting radionuclides are applied in the liquid effluent monitor setpoint calculation. This revision was desirable since the liquid effluent monitor only responds to gamma-emitting radionuclides. The entire ODCM is attached.

It was determined by the PORC that these changes do not reduce the accuracy or reliability of dose calculation or setpoint determinations.

The ODCM applies to Farley Nuclear Plant Units 1 and 2.