Monthly Operating Rept for Nov 1992 for Calaway Plant,Unit 1
ML20126A151
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1992
From: Campbell W, Knaup J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2736, NUDOCS 9212180017
Download: ML20126A151 (6)


Text

LG l

UNION ELECTRIC COMPANY December 8, 1992 Colloway Plant I

Nuclear Regulat ry Commission Document Control

'e k Washington, DC 20. 5

)

ULNRC-2736

Dear Sir:

DOCKET NUMBER 50-483 CALIAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF 30 MONTilLY OPERATING REPORT NOVEMBER 1992 The enclosed Monthly Operating Report for November, 1992 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications, h/

W. R. Campbell WRC/ FEY /)M/ TAM /WK/cre( { frv % ), -

Manager, Callaway Plant l-Enclosure I

cc:

Distribution attached r

-l I

9212180017 921130 PDR ADOCK 05000483

.R PDR Mailing Address: PO. Box 620 Futton MO 65251.

1

cc distribution for ULNRC 2736 with enclo.sures Mr. Richard Hague, Chief Project Section lA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. L. R. Wharton (2 copies)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102

i t

s DOCKET No,-

50 483 UNIT NAME CALIAWAY UNIT 1

+

DATE 12 08 92 COMPLETED BY J. W. Knaup TELEPHONE 314/676-8485 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the entire month.

PART B PORV AND SAFETY VALVE SUKMARY None t

i Page 1 of 4

,x...

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 483 UNIT Callaway Unit 1 DATE 12-08 92 COMPLETED BY-

-J.

W. Knaup TELEP110NE 314/676-8485 MONTH: NOVEMBER 1992 AVERACE DAILY POWER LEVEL AVERAGE-DAILY POWER LEVEL DAY (HWe-Net)

D6X (MWe-Net) 1 1157 17 1163 2

1168 18 1161 3

1169 19 1146 4

1168 20 1158 5

1173 21 1170 6

1153 22 1170 7

1050 23 1171 8

1166-24 1174-9 1164

.25

'1172 10 1161 26 1173 11 1166 27 1175 12 1169-28 1176 13 1171-29

-1171 14 1175 30 1172 15

'1174 31.

16 1166 i

Page 2 of 4 l

t 4

1..

Part D OPERATING DATA REPORT DOCKET N0',

50 483 UNIT NAME CALLAWAY UNIT 1 DATE 12-08-92 COMPLETED BY J

W. Knaup-

. TELEPHONE 314/676 8485 OPERATING STATUS QTQ 2) 1.

REPORTING PERIOD: NOVEMBER 1992 GROSS HOUR $ IN REPORTING PERIOD: 720 8040 69,661.5 I

2.

CURRENTLY AUTHORIZED POVER LEVEL (MWt): 3565 MAX DEPEND. CAPACITY (MWe-Net): !!25 DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.

POVER LEVEL TO VHICH RESTRICTED (!F ANY)(MWe-Net):

4.

REASONS FOR RESTRICTION (!F ANY):

THIS HONTH VR TO DATE COMut ATIVE 5.

NUMBER OF HOURS REACTOR VAS CRITICAL.

720.0 6545.2 60,633.7 6.

REACTOR RESERVE SHUTDOWN HOURS.

0 0

0 7.

HOURS GENERATOR DN LINE..

720.0 6462.3 59,311.7 8.

UNIT RESERVE SHUTDOWN HOURS.

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)..,

2,540,736 22,197,531 198.460,394

10. GROSS ELECTRICAL ENERGY GENERATED (HWH).

876,797 7,592,465 67,655,629

11. NET ELECTRICAL ENERGY GENERATED (MVH).

837,665 7,228,548 64,308,096

12. REACTOR SERVICE FACTOR.

100.0 81.4 87,0

13. REACTOR AVAILABILITY FACTOR.

100.0 81.4 87.0

14. UNIT SERVICE FACTOR.

100.0 80.4.

85.1

15. UNIT AVAILABILITY FACTCR.

100.0 80.4 85.1

16. UNIT CAPACITY FACTOR (Using MDC).

103.4 79.9 82 1

17. UNIT CAPACITY FACTOR (Ustng Design MVe)..

99.4 76.8 78.8

18. UNIT FORCED OUTAGE RATE.

0.0 2.2 2.9

19. SHUTDOWN 5 SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND 00RAfl0N OF EACH):
20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

Page 3 of 4

a PART E UNIT SHUTDOVNS AND POWER REDUCTIONS DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT I j

DATE 12-08-92 COMPLETED BY J. W. Knaup TELEPHONE 314/676-8485 REPORT MONTH: NOVEMBER 1992 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR No.

DATE 5: SCHEDULED (HOUSS)

REASON REDUCING P7WER CORRECTIVE ACTIONS / COMMENTS

(

SUMMARY

REASOM METHOD A: EQUIPMENT FAILURE (EXPLAIN)

I: HANUAL B: HAINT. OR TEST 2: MANUAL SCRAM C. REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN) t

,,