Advises That Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys, Acceptable
ML20126A044
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/08/1992
From: Colburn T
Office of Nuclear Reactor Regulation
To: Orser W
DETROIT EDISON CO.
References
IEB-92-001, IEB-92-1, TAC-M83875, NUDOCS 9212170206
Download: ML20126A044 (3)


Text

-_

/

o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

I j

j wasmnaron, o, c.rosss f

December 8, 1992 s

Docket R. 50-341 Mr. William S. Orser Senior Vice President - Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Orser:

SUBJECT:

RESPONSE TO NRC BULLETIN 92-01, " FAILURE OF THERM 0-LAG 330 FIRE BARRIER SYSTEM" (TAC NO. M83875)

By letter dated September 30, 1992, you provided a response to NRC Bulletin 92-01 for Fermi Nuclear Plant, Unit 2.

Your response stated that appropriate compensatory measures have been implemented.

You also provided a description of the long term corrective action to ensure or restore operability.

You stated that corrective actions include establishing a roving hourly fire watch for each of the 11 areas at Fermi-2 where Thermo-Lag 330 material is installed. All but one of these areas use Thermo-Lag 330 material as a wallbarrier in the small HVAC room (Fire Zone 9) where combustible loading is extremely low.

By telephone conference on October 29, 1992, the staff requested additional information regarding the use of Thermo-Lag within the small HVAC room associated with Fire Zone 9.

You responded by letter dated November 18, 1992.

In your letter, you described the low combustible loading in the room, and the configuration and use of the Thermo-Lag material.

You stated that it i

consisted of two small assemblies (3 ft ) placed at the top of the wall to seal two small gaps between the top block wall and the ceiling. Additionally, you indicated that this room is considered part of the control room-(Fire Zone 9) and that alternate safe shutdown capabilities would be utilized if evacuation of the control room were required.

You have also completed an engineering evaluation of the Fermi Thermo-Lag firo barrier material and concluded that it's use does not reduce the level of safety provided by the Fermi-2 Fire Protection Program nor does it adversely affect the safe shutdown capability of the plant.

You also stated the fire barrier integrity restoration is being conducted in accordance with industry efforts coordinated by NUMARC.

Please provide us with a proposed schedule as soon as available.

g u a 140041 921217 _0206 921208 4

e g

PDR s N

l ;

We have reviewed your response and find it acceptable.

Please inform us when all corrective actions have been completed.

Further NRC review, if any, will be performed by inspection or audit.

Sincerely, IfIothyG.Colburn,Sr.ProjectManager Project Directorate 111-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

Docket File NRC & Local PDRs PD 31 Reading File BBoger JZwolinski LMarsh MShuttleworth TColburn AMasciantonio PMadden, 801 RArchizel, 801 CMcCracken 0GC ACRS (10)

Fermi Plant File WShafer, Rill 0FFICE LA:PDIII-l PM:PDIll-1,

SPLB/JM D:PDIII-l MShuttleNkb TColburn/vsb CMcCIacken LMarsh NS WAME 7 /#[92 4A / 7/92

/,L/ //92

/A /P /92 l

6 DATE

/

ORIGINAL RECORD COPY FILENAME: FE83875.Itr u

a

4 l

-Mr. William Orser Fermi d

. Detroit Edison Company cc:

t John Flynn, Esquire Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3423 N. Logan Street P. O. Box 30195 Lansing, Michigan 48909 Mr. Stan Stasek U.S. Nuclear Regulatory Commission Resident Inspector Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinvile Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Connission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. A. Cecil Settles

-Director - Nuclear Licensing Detroit Edison Company Fermi-2 6400 North Dixie Highway Newport, Michigan 48166

<~