SUMMARY
OF PLANT OPEPATIONS 12-1 Plant operating at approximately 100% full power.
Performed routine to surveillance and preventive maintenance items.
12-14 12-16 (0825)
Started STP-220 (APSR uthdrawal) and placed rods in manual.
(0922)
Lowering power to 50% _ at 10 FN/ min.
(0947)
Reactor at 50% power.
Started pulling rod group #8 per STP-220.
(1032).
Group #8 at 100% withdrawn.
(1036)
Raising Reactor power to 70%.
~
(1115)
Reactor at 67% (600 FMe) on 5-hour hold.
(1630)
Began increasing Reactor power at 3%/ hour.
(2106)
Stopped power increase at 87% (780 tMe) due to large negative imbalance.
(2220)
Imbalance satisfactory, began increasing power to 90%.
(2320)
Reactor at 90% power (830 FMe).
' 12-17 (0206)
Started increasing power to 100% at 3%/ hour.
(0528)
Reactor at 100% (900 MWe).
Completed STP-220.
12-21 (0920)
Recalibrated Feedwater flows in computer; resulting reactor thermal power indicates 96%.
(1140)
Began increasing power to 100%.
(1500)
Peactor at 100% (945 FMe).
PERSONNEL CHANGES REQUIRING REPORTING No personnel changes that require reporting in accordance with Technical Specifications Figure 6.9-2 were made in Decepber, 1979.
MAJOR ITEMS OF -SAFETY-RELATED MAIN?ENANCE O
1.
Continued inspection / testing of pipe supports; repaired or replaced as necessary to meet the new criteria covered in Bulletin 79-02.
2.
Repaired socket weld on drain line (23620-4"-CA) of Makeup Pump Discharge Header (LER 79-20).
8001150 l
f O
FIFUELING I!.* FOPS \\TIO;* REQUEST Rancho Seco Unit 1 1.
Usee of racility:
January 19, 1979 2.
Scheduled date for next refueling shutdown:
'3.
Scheduled date for restart following refueling: _ _ M, r,- h. 197o Technical Specification change or other license anendment required:
4; a) Change to Rod Index vs. Poscr Level Curve (TS 3.5.2)
Change to Core Imbalance vs. Pouer Level curve (TS 3.5.2) b)
c) Tilt Limits (TS 3'.5.2)
~
d) Safety Equipment Testing (TS 3.3.3)
Scheduled date(s) for subnitting proposed licensing action: December,1979 5.
None Important licensing considerations associated with refueling:
6.
(]
7.
Eumber of fuel assemblies:
177 a) In the core:
b) In the Spent Tuc1 Pool:
112 8.
Present licensed spent'fuc1 capacity:
579 Projected date of the last refueling that can be discharged 9.
to the Spent Fuel Pool:
1987 90022>58 e
6 4
e S
6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-312 UNIT Rancho Seco Unit 1 DATE 12-31 COMPLETED BY R. W. Colombo TELEPl!ONE 916-452-3211 December, 1979 MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(Mwe. Net) j 3
860 g7 849 2
858 13 851 3
859 862 39 860 862 4
g 5
_ 858 21 879 903 6-858 22 7
R99 23 902 O
8 859
' 901 24 9
R69 03
,25 10 862 26 904 11 860 904 27 12 864 28 904 13 862 903 29 14 RA9 896 30 15 864 3
894 16 714 INSTRUCTIONS l
On this fannat.hst the aserne daily' unit power lesel in MWe Net for each day in the reportin,e month. Compute to the nearest whole inegawatt.
'3 90022,59
("""
,g
. ~ _.
OPERATLNG DATA REPORT O
DOCKET NO. 50-312 DATE 79-12-31 CO31PLETED BY R. W.
Colombo TELEPilONE 41 A-m-Ull OPERATING STATUS December 21, 1979 -
I. Unit N~ame:
Rancho Seco Unit One Notes Feedwater flow / heat balance
- 2. Reporting Period:
December, 1979 recalibrated in computer mon-2772
- 3. Licensed Thermal Power (MWt):
itoring system.
Resultant
- 4. Nameptate Rating (Gross MWe):
thermal power level - 96%
- 5. Design Electrical R: ting (Net 31We):
918 (905 MWe).
Raised power to
- 6. Maximum Dependable Capacity (Gross 31We):
917 100% (945 MWe) at 1500.
873
- 7. Maximum Dependable Capacity (Net.\\lWe):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:
N/A N/A
- 9. Power Lesel To Which Restricted. If Any (Net MWe):
10.~ Reasons For Restrictions. If Any:
N/A O
rai,Meeis vr..te.Date Cemeieti,e
~11. Hours In Reporting Period 744 8,760 41,257
- 12. Number Of flours Reactor Was Critical 744 7,002.7 26,073.5
- 13. Reactor Resene Shutdown flours 0
1,5'57.7 3,975.1 744 6,778.1 24,941.3
- 14. Ilours Generatar On Line
- 15. Unit Resene Shutdown Hours 0
1.199.3 1.210.2
- 16. Gross Thermal Energy Generated (MWH) 1.975.283 17,914,594*
62,984,018*
- 17. Gross Electrical Energy Generated (MbII) 66 8 d0,6,.,,
6,021,736
-21,284,536
- 18. Net Electrical Energy Generated (MWil) 636,415 5,711,999 20,110,889
- 19. Unit Seruce Factor 1.00.0 77.4 60.5
- 20. Unit Aui! ability Facter 100.0 91.1 63.4 98.0 74.7 n.6
- 21. Unit Capacity Faetor (Using 3lDC Net)
- 22. Unit Capacity Factor IU,ing DER Net) 93.2 71.0 53.1
- 23. Unit Forced Outage Rate 0
5.6 32.0
- 24. Shutdoans Scheduled Oser Next 6 Month > (Type: Date,and Duration of Each e.
~
Refueling: January 19, 1980 - duration approximately 60 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achined INITIA L CRITICA LITY N/A N/A~
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER \\ TION N/A N/A
'
- Heat balance /feedwater flows recalibrated. Total thermal MWil recalculated to reflect the adjustment.
90022 60 u
i i
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-312 UNIT N AME Rancho Seco Unit One DATE 79-12-31 COMpLET ED ItY R.
U.
Col o+ o e
REPORT MONTII December. 1979 TELEPilONE 916-65'-1'11 n
N b
3g
}
Yh Licer.sce
,E3, Cause & Currectise No.
Date Q
3g jss Event -
El gl Action to O
y_
jgg Report c en U t-gU Prevent Recurrence C5 6
20 79-12-16 S
0 F
1
.N/A N/A N/A Reduced power for Ax'ial. Power Shaping Rods withdrawal (STP-220).
t t
I 2
3 4
F: Forced Reason:
Method:
Exlubit G - Instrucriens S: Scheduled A-Eqt:ipment Failure (Explair)
' l-Manual for P:cparation of Data n Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Rcrueling 3-Automatic Scram.
Event Report (LE R) File (NUREG.
D Rei;uhtory Restrictie,n 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Adnunist rative 5
G-Operational Error (Explain)
Exhibit ! - Same Source (9/77)
Il-Other (Explain) e 9
9
.