ML20125D322

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1979
ML20125D322
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From: Murray T
TOLEDO EDISON CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20125D326 List:
References
L80-018, L80-18, NUDOCS 8001140248
Download: ML20125D322 (1)


Text

{{#Wiki_filter:- l e y r r s 4 i a . E i a 'f -.. r-

- 1 Toteco e EDISON i

. January 8,-1980 L80-018 FILE: RR 2 (P-6-79-12). ( Docket No. 50-346 License No. NPF-3 s i I Mr. Victor Stello, Jr., Director' Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555

Dear Mr. Stello:

Monthly Operating Report, December, 1979 Davis-Besse Nuclear Power Station Unit 1 Enclosed find ten (10) copics of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1, for the month of December, 1979. Also enclosed is a revised copy of the Operational Summary from the Monthly Operating Report for the month of November,1979. The revision to this summary is indicated by a "1" in the Icft margin. Yours truly, o' 7m Terry D. Murray iLetion Superintendent Davis-Besse Nuclear Power Station TDM/1j k ' Enclosures .cc: tk. James G. Keppler gicaal Director, Region III Mr. Norman 11 aller, Director Office of Management Program Analysis Enc 1: 3 THE TOLEDO EDISON COMPANY EDISON PLAZA ' 300 MADISON AVENUE TOLEDO, OH10 43052 -w r-I - b- --.1 = --}}