Responds to NRC Re Violations Noted in Insp Repts 50-413/92-24 & 50-414/92-24.Corrective Actions:Component Engineering Will Evaluate Procedural Requirements for Erection & Removal of Scaffolding for Enhancement by 930601
ML20125C887
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/03/1992
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212140132
Download: ML20125C887 (5)


Text

ll-l j

onke nerr evnwany sls riant<x Cntuut>a %nteJr Gneratwn Deportinent nce l'rvide nt OQ Concu?d R%d (Sh1AllJ?05 Offa r hl SC:9N5 (bai)S31JCG I:At_

L f

DUKE PO%' Ell f

December 3,1992 U.S. Nuclear Regulatory Commission 3

ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station Dockot Nos. 50-413 and 50-414 Reply To A Notico Of Violation NRC Inspection Report 50-413/92-24 and 50-414/92 24 Attached is Duke Powor's response to the Lovel IV violation cited in the Notico of Violation by subject inspection Roport dated November 9,1992, t

Tho violation involved various minor deficiencies relating to scaffolding..

Very truly ours, b.

h h

M.S. Tuckman JLL/

Attachment 14007:

9212140132 921203

'l PDR ADOCK 05000413 j)} -

~

G PDR

\\;

./'

l i

y

=

U.S. Nuclear Regulatory Commission December 3,1992 Pago 2 xc:

S.D. Ebnnter Regional Administrator, Rogion ll R.E. Martin, ONHR l

W.T. Orders i

Sonior Rosident inspector l

r I

i i

, i L

t t

P

)

k

-.h

_oy,
  1. v,

.m.,,

,,_,i,,,,

4~,m

,4

.~m

_m._

U.S. Nuclear Rogulatory Commission Docomber 3,1992 Pago 3 j

bxc:

R.L. Gill.

l R.O. Sharpo M.E. Patrick A.V. Carr D.B. Cook NCMPA 1 NCEMC SREC PMPA Group Filo: CN 815.01 (92 24)

Document Control: 815.01 s

k b

t n

3 4

l-l

.l.,

-, + w a

w

.._..-p,m.,-yv..,-

.p,--

,.--e.w.we-,

n

-v-wer-,-e-,

,w,w esce mv qm- -- -,

yr, e

>mw rw,-

y ewrw-t-rnetm.a--+-

u en' r'w e W-s'

    • ' ' ' ' ' " = *

~

d DUKE POWER COMPANY REPLY TO A NOTICE OF VIOLATION 413,414/92-24 02 Technical Specification 6.8.1 requires in part that written proceduros be established, implomonted and ma<ntained covoring the activitios referenced in Appendix A of Ro0ulatory GJ!do 1.33, Rovision 2, February 1978. Maintenanco Proceduro MP/0/A/7650/115, Erection and Romoval of Scaffeiding, prohibits scaffolding from bein0 secured to piping loss than throo inchos in d'amotor, prohibits scaf folding from twing secured 19 piping with mirror insulation, requires that security / stacking pins bo installed in all sections, and requires that docking /plankin0 and toeboards bo secured.

Contrary to the abcve, MP/0/A/7650/11b was not followed on July 15,1992, when i

maintt,nanco personnel orocted scaffolding in the 2A and 2B Diosol Gonorator rooms in that they secuted scaffolding to 3/4 inch piping, socured scaffolding to piping with mirror insulation, failed to install security /stackin0 pins in all scatfolding sections, and fallod to securo certain sections of docking /plankin0 and tooboards.

This is a Severity LevelIV Violation.

RESPONSIE:

1.

Reason For Violfti!QD This violation is attributed to inappropriato action for not following tho scaffolding gonoralguidelines by maintenanco personnoi rosponsiblo for oroction of scaffolds due to a lack of attention to dotail. Also, the scaffolds woro erected in an unusual and difficult location, which compounded the problem of following the procedure requisitos.

1

~

d DUKE POWER COMPANY REPLY TO A NOTICE OF VIOLATION 413,414/92 24-02 2.

CQtinnliv0Act19Ealak9ttAmLRusultEAcM93ml The variuus NRC identified minor deficienclos woro corrected in compliance with the scaffoldin0 proceduro (MP/0/A/7650/115).

The scaffolds woro removed soveral days lator maintenanco activitics.

upon completion of the related correctivo

~

The requirements of the scaffoldin0 proceduro woro ro omphasized with the appropriato maintenance personnel involved with scaffoldin0 croction and removal to ensure that proceduto instructions are followed.

A walkdown was performed to inspect orected station scaffolding to ensuro scaffolding currently in use was crocted in compliance with scaffolding proceduro requiromonts.

3.

C_pttncilV920tloEslAR91nk9tLLolyphlEutthetXb!ntions Component Engineering, with assistance fiom Civil En0incoring, will evaluato the proceduralrequirements for orection and removal of scaffolding for possiblo enhancements and improvements by June 1,1993.

Station Directivo 3.8.12 (Installation of Temporary Shielding and Scaffoldin0 will be revised to provido better guidanco for installation ;f scalfolding by June 1,1993.

4.

DainAf EulLORmplianGQ Duko Power is now in full complianco.