Text
_ _ _ ._ . _ . _ _ _.. _ . _ _ _ _ _ __
_____._ _ _
_
4
,-
..
p**f%,).
UMit,0 STAf[S
f
f
nucLEAn nEGULATORY COMMISSION
n
j ' ,ya ' ,y
{0}(:
. ntmon m
)
- -
m noonvru ao o
3
/
,
m r ~ nu s. iamon, u m
,
...+
EN
$
.
l
'
Docket No.
50-373
Docket No.
50-374
i
Commonwealth Edison Company
)
ATIN: Mr. Cordell Reed
Senior Vice President
i
,
Opus West 111
l
1400 Opus Place
Downers Grove,_ IL 60515
Dear Mr. Reed:
This refers to the inspection conducted by D. Hills, C. Phillips, and
-
'-
M. Miller of this office, and by J. Roman of_ the Illinois Department of
Nuclear Safety, on October 14 through November 25, 1992. The inspection
,
included a review of authorized activities for your LaSalle County Station.
At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
4
'
!.
Areas examined during the inspection are identified in _ the report. -Within
these areas, the inspection consisted of select'ive examinations of procedures
!
and representative- records, interviews with- personnel,_ and observation of
activities in progress.
i
During this inspection, certain of your activities appeared to be in violation
.
of NRC requirements, as specified in the anclosed Notice of Violation
j
(Notice).
These violations are of concern as they represent a-lack of
attention to detail during refueling operations, . routine operations',. and in
the preparation of procedures. This problem.was further-emphasized by the:
-
failure of operations personnel to recognize that authorizing:an out-df-
.
service was not consistent with the current plant configuration.
The-
!
significance of these instances ranged from two fuel assemblies being -loaded
l
in'the incorrect storage locations to reactor scrams._ We request a written
i
response within-30 days describing your actions to address the lack;of
- ~
attention to detail at your station. We are concerned with the effectiveness
i
of management in taking lasting corrective actions.
As.a result, we would
like to discuss this report and subsequent events at a management maeting-
i
l
which will be scheduled with you in.the near future.
Other activities were also identified to be in violation of NRC requirements,
2
j
-
However, as described in the enclosed inspection report, these violations will:
not be subject to enforcement action because the criter.ia specified -in-Section
VII.B of the " General Statement of Policy and Procedures for NRC Enforcement-
L
i-
Actions," (Enforcement Policy, 10 CFR Par _t 2, Appendir C (1992)) were
j'
satisited.
f-
\\
9212140086 921204
4
PDR-
'
ADOCK 05000373-
'G
gl I
'
>b
o
- . - . .- -- - - -
- -
-
. - - .-
.
.
,
UEC
4' 3 32
Commonwealth Edison Company
2
You are required to respond to this
tter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your responce to this
'
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
fclu.sd k
~~
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures:
1.
'
2.
Inspection Reports
No.
50-373/92027(DRP);
No.
50-374/92027(DRP)
cc w/ enclosures:
M. Wallace, Chief Nuclear
,
Operating Officer
T. Kovach, Nuclear Licensing
Manager
J. Schmeltz, Acting Station Manager
,
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspectors, LaSalle,
'
Clinton, Dresden, Quad Cities
R. Hubbard
J. W. McCaffrey, Chief, Public
,
Utilities Division
Licensing Project Manager, NRR
R. Newinann, Office of Public
Counsel, State of Illinois Center
-
State Liaison Officer
4