Forwards Safety Evaluation of Util 840312 & 0626 Requests for Relief from Requirement to Volumetrically Examine Pump Casing Welds.Relief Granted.Alternate Method of Exam Acceptable
ML20125C709
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/10/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20125C711 List:
References
LSO5-85-06-014, LSO5-85-6-14, NUDOCS 8506120127
Download: ML20125C709 (3)


Text

'

I

_(, '  %, UNITED STATES

~g g~ - NUCLEAR REGULATORY COMMISSION

.L j WAsHWGTON, D. C. 206S5

% ,,g June 10, 1985 Docket No. 50-213 LS05-85-06-014 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Opeka:

SUBJECT:

RE00EST FOR INSERVICE INSPECTION RELIEF FROM REACTOR COOLANT PUMP EXAMINATION .

Re: Haddam Neck Plant By letter dated December 21, 1982, the staff granted relief from the requirements of Section XI of the ASME Roiler and Pressure Vessel Code for visual and volumetric examination of reactor coolant pumps at the Haddam Neck Plant. The relief was granted through the end of the ten-year inspection interval (December 31, 1987) or until a pump is disassembled for maintenance or other reasons, whichever occurs first. By letter dated March 12, 1984, Connecticut Yankee Atomic Power Company (CYAPCO) re-evaluated the requirement to volumetrically examine the pump casing  !

welds and requested unconditional relief from the requirement. The staff discussed the examination requirements and request with CYAPC0 and '

requested information concerning the proposed visual inspection if a reactor coolant pump were disassembled. By letter dated June 26, 1984. CYAPC0 provided the requested additional information.

The staff has reviewed the requested supporting information provided in the letters of March 12 and June 26, 1984. The staff's Safety Evaluation concludes that the required examinations are impractical to perform and that relief granted from volumetric examination of the casing weld and the alternate methods of examination' discussed in the Safety Evaluation gives reasonable assurance of the pump casing structural integrity. The staff i also concludes that granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest considering 8506120127 850610 PDR ADOCK 05000213.

G PDR 1

_ _ _ _ _ _ - . . _ . . _ _ .____..__._..m . . _ _ - . - . . - . . _ _ - _ , _ . . _ _ . _ _ . _ _ . . - . . - . . . - -

Mr. John F. Opeka 1 June 10,1985 the burden that could result upon Connecticut Yankee Atomic Power Company if these requirements were imposed on the Haddam Neck Plant. Accordingly,

. pursuant to 10 CFR 50.55(g)(6)(i) of the Commission's regulations, Connecticut Yankee Atomic Power Company is granted relief from the volumetric examination requirement for the pump casing welds. A copy of our Safety Evaluation is enclosed.

Sincerely, episinalsigned by:

John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing

Enclosure:

Safety Evaluation cc: See next page DISTRIBUTION Docket File ORB #5 Reading CJamerson FAkstulewicz JZwolinski NRC PDR Local PDR DELD EJordan BGrimes ACRS(10)

GJohnson ORAB CMiles, OPA TBarnhart(4)

RDiggs/ (w/ fee form)

SECY JPartlow BLiaw OELD

$1'W DL:0RB#5 DL:0RB#50 DL:0RB#54sth CJarnerso FAkstuleGicz d A f JZwolinski A

05/f/85 1 05/ 8 /85 05/g/85 y 05"/ /O/85 po\

ob e 0 v

O I

r-  ;

l l

l Mr. John F. Opeka Haddam Neck Plant Connecticut Yankee Atomic Power Company cc

' Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck' Plant RDF #1 Post Office Box 127E East Hampton, Connecticut 06424 Edward J. Mroczka .

Vice President, Nuclear Operations Northeast Utilities Service Company a Post Office Box 270 Hartford, Connecticut 06141 Board of Selectmen

' Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 U.S. Environmental Protection Agency Region I Office ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

-