ML20125C679

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-416/92-26 on 921001-1107 & Nov. Violation of Concern Because Uncontrolled & Updated Documents Were Used to Determine Lubrication Requirements for Plant Equipment
ML20125C679
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/24/1992
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cottle W
ENTERGY OPERATIONS, INC.
Shared Package
ML20125C682 List:
References
NUDOCS 9212140033
Download: ML20125C679 (4)


See also: IR 05000416/1992026

Text

_ . _ _ . _ _

=

_ _ _ _ _ _ .

_

5

.

,

,

I'

j

-

.

,

.

I

NOV 2 4 Lqyj

t

Docket No. 50 416

i

License No. NPF-29

a

t lil C D 0 D V

Entergy Operations, Inc.

l

LL UUI l

ATIN: Mr. W. T. Cottle

Vice President

.

Nuclear Operations

P.O. Box 756

Port Gibson, MS 39150

Gentlemen:

1

SUBJECT: NOTICE OF VIOLATION

(NRCINSPECTIONREPORTNO.--50416/92-26)-

This refers to the inspection conducted by R. H. Bernhard of this office on

October 1 through November 7, 1992.

The inspection included a review of

activities authorized for your Grand Gulf facility.

At the conclusion'of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

,

activities in progress.

Based on the rr.dits of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice o'

Violation (Notice). We are concerned about the violation because uncontrole

and updated documents were used to determine lubrication requirements for

plant equipment.

In addition, the enclosed Inspection Report identifies

l

activities that violated NRC requirements that will not.be subject to

enforcement action because your efforts in identifying and correcting the

violation meet the criteri_a specified in Section Vll B of the Enforcement

Policy.

You are required to respond to this letter and should follow the instructions

specified in the_ enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and-any- additional

actions you plan to prevent recurrence,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter and its enclosures will be placed in the NRC Public Document

Room.

The responses directed by this letter and the enclosed Notice are not subject

- to the clearance procedures of the Office'of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub.-L. No.96-511.

9212140033 921124

t

PDR

ADOCK 05000416

\\\\

G

PDR:

.

JSCI

.

-- .

-

-

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

.

'

.

.

M r! 2 4 1932

.

Entergy Operations

Inc.

2

Should you have any questions concerning this letter, please contact us.

,

>

Sincerely,

t>RIGIN At 510ND "

DAVID M. VERREtti

David M. Verre111, Chief

Reactor Prejects Branch 1

Division of Reactor Projects

inclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

C. R. Hutchinson, General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P. O. Box 756

Port Gibson, MS 39150

M. J. Meisner, Director

Nuclear Safety and

Regulatory Affairs

Entergy Operations, Inc.

P. O. Box 756

Port Gibson, MS 39150

Mike Morre, Attorney General

Fr.nk Spencer, Asst. Attorney General

State of Mississippi

P. O. Box 22947

Jacksor., MS 39225

G. W. Muench

Vice President, Operations Support

Entergy Operations, Inc.

P. O. Box 31995

-

Jackson, MS 39286-1995

Donald C. Hintz, Executive Vice

President & Chief Operating Officer

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286 1995

(cc w/encls cont's - See page 3)

.

...

.

..

..

. _ _ _ . _ _

j

_ _ . . _ _

_.

_ _ _ . _ . . _ .

. . _ _

_

_

_

.

_

_

.__ _.

-

'

.

.

.

g

2 4 892

Entergy Operations, Inc.

3

(cc w/encls cont'd)

-

l

R. B. McGehee, Esq.

S. S. Chan

l

Wise, Carter, Child, Steen

Project Engineer

and Careway

Bechtel Power Corporation

l

P. n. Box 651

P. O. Box 2166

J:

on

39205

Houston, TX 77252-2166

N. S. "9ynolds, Esq.

Win.' n i Strawn

,

'

1400 L Street, NW, 12th Floor

l

Washington, D. C,

20005-3502

l

l

Alton B. Cobb. M.D

!

State Health b*ficar

i

>cate Board of Health

l

.. O Box 1700

Jackson, MS 39205

Tne Honorable William J. Gut.te, Jr

.

Attorney General

Department of Justice

State of Louisiana

P. O. Box 94005

Baton Rouge, LA 70804-9005

Office of the Governor

State of Mississippi

Jackson, MS 39201

Jack McMillan, Director

Division of Solid Waste Management

i

Mississippi Departmeat of

'

Natural Resources

l

P. O. Box 10385

Jackson, MS 39209

'

President

Clairborne County Board

of Super <isors

i

fort Gibson, MS 39150

i

'

O. L. Brannen

l

Vice President

,_

Bechtel Power Corporation

l

P. O. Box 2166

-

'

Wouston, TX 77252 2166

i

l

bec w/ enc!s:

(See page 4)

I

1

.

.

.

-.

_

.

.

_. -_ -____-

-

.

,

.

.

NOV 2 4 jaa?-

Entergy Operations, Inc.

4

~"'

bec w/encls:

P. O'Connor, he.d

F. Cantrell, rfl

Document Contrni 'sesk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

>

Route 2, Box 399

Port Gibson, MS 39150

'

>

i

9

.

i

<

d

s

Ril:DRP

Ril:Dr.P

je g

r

RWritjhikj

y

flantrell

ll/ytj/92

'll/y9/92-

-;

,

. , . , .

..

,

.

.

.,....

.. .

..

.

.

_ _ _ _ . _ _ _ _ _ _