ML20125C146

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Also Placed in PDR
ML20125C146
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/09/1992
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bradley Jones
AKIN, GUMP, STRAUSS, HAUER & FELD (FORMERLY AKIN
Shared Package
ML20125C149 List:
References
FOIA-92-88 NUDOCS 9212110067
Download: ML20125C146 (4)


Text

-"

U 5'. NUCLE AR bEGULATOR r t,vc555!ON rg g e ;X ed2-- Xi ri '"

$ FOIA - e,nn

g. .gA nwar tm
r i /\r@' g[ RESPONSE TO FREEDOM OF iwt l yl e^ati^t s ,

j

/ INFORMATION ACT (FOIA) REQUEST o^'t 3 ,, g jgg oeese DOCn E1 NuMLE 9tha fit wphcarn)

Rt OUESTE R Mr. Bradley W. Jones PART 1.--AGENCY RECORDS RELEASED OR NOT LOCATED (See checkedbones/

No agency records subject to the request have been loccted.

No additional agency records subject to the request have been located.

Raques ed records are available through mother pte I.c distributa provem. See C smments section, Agency records subject to the request that are identified in Append;mles) are atrevy available for public inspection and copying et the NRC Public Docurnent Room,2120 L Street, N.W., Washington, DC.

Agency records subject to the request that are identified in Appendix (es) 8 .are being made available for public inspection and copying X d the NRC Public Document Room,2120 L Street, N.W., Washington, DC,in a folder under ibis FOI A number.

The nonproprietary version of the propcgl(s) that you agreed to accept in a telephone conversation with a men ber of my staff is now being rnade available for oublic inspection and copying at the NRC Public Doccment Room,2f 20 L Street, N.W., Washington, DC, m a folder under this FOI A number, Agency records subject to the request at are identified in Appendum) may be inspected and copied a the N RC Local Public Document Room identified in the Comments section.

Enclosed is info mation on how you may obtain access to and the chartys for copying rec rds 'acated at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.

Agency records subject to the request are enclosed.

Records subjec; to the request have been rwierred to snother Federal agency {ies) for review and direct response to you.

pgg, _ , ,1 ,

-%. 1 4 - s -

vg^ e, You will be billed by the N RC for fees totahng $

You witi raceive a refund from the NRC in the amount of $

in view of NRC's response to this request. no further action is being taken on appeal letter dated ,No PART 11. A-INFORMATION WITHHELD FROM PUBL!C DISCLOSURE Certain information in tLe requested records is being wsthheld from public disclosure pursuant to the exemptoons described in and for the reasons stated in ? art al, B, C, and D. Any released portioris of the documents for which only part of the record is being withneld are being made available for public hspection and copying in the NRC Pubhc Docurnent Room,2120 L Street, N W., Washing'on, DC in a folder under this FOI A number.

COMMENTS si-' uRE,0) RECTO , ivlSIOF h REE DOW OF INFORMATION ANO PUBLICATIONS SERVICES

/ . :LL L

%w;&m$e@A 3 WW

c. _" -  %, V W;&o w& Np h.m:'M

. e N J.s g& &s

< diff&w< w%jm. e

.-Y> y:.@ .

I

-h.b 5 k. 4 A 9212110067 920609 PDR FOIA

- 9 JONES 92-88 PDR a 4 - - a ~~ -ve- l w rm ama rpm i<

W- ..

L i s RE: FOIA-92-88 APPENDIX B DOCUMENTS BEING PLACED IN THE NRC PUBLIC DOCUMENT ROOM Humber Date~ Description

1. .3/3/89 Preliminary Notification of Event or Unusual Occurrence--PHO-V-89-07 (2 pages)
2. 3/6/89 Preliminary Notification' of Event or Unusual Occurrence--PHO-V 07A (3 pages) . .
3. 3/16/89 Preliminary Notification of Event or Unusual Occurrence--PNO-V-89-17 43M?s%4;aWg
  • MOD- -..d keys <(1 pageF % ,+f4 #M6 +M$$}h s 4MQpw
4. 3/23/89 Preliminary Notification of Event or unusual Occurrence--PHO-V 07B (2 pages)
5. 4/10/89 Event Notification Worksheet (3 pages)
6. 3/8/89 Letter from Hayn's to USNRC (3 pages)
7. 4/14/89 Morning Report (1 page)

". 3/3/89 Augmented Inspection Team Plan Palo Verde Unit 3 (3 pages) 9, 1/11/90 Letter from Conway to Martin w/ attachment (77=pages)

10. 4/4/90 Notice of Significant Meeting (4 pages)
11. 4/10/90 Meeting with APS (1 page)
12. 4/10/90 APS/NRC MANAGEMENT MEETING 4/10/90 (66 pages)
13. 4/16/90 Letter from Taylor to DeMichele (3 pages)

.-.. . . - , - - . . - ~ . . . .. . . .-- .. -

  • ~

_j . - ~

2-e n en ,

14. 6/1/90 Letter from Conway-to Taylor' w/ attachment (20-pages)
15. 6/14/90 Memorandum from Martin'to Taylor,

Subject:

Schedule and-Status of; Staff Actions Related-t'o-the! / J-M "

Diagnomic Evaluation at Palo Verde f

(3 pages)

*A '

E

16. 6/24/90 Letter from Conway to Martin (3 pages)
17. 6/24/90 Letter from Martin to Conway-(1 page)
18. 7/31/90 Letter from'DeMichele to Taylor-w/ attachment (27 pages)

- ph .-19 .s

. r- , , --^

/8/1/99 9 * -

Facsimi'le rTransmitteliItequest49g@$25%sWe w/ attachment (12 pages)
20. 8/31/90 Locter frcm.Conway to USNRC w/ attachment (48 pages)
21. 9/6/90 Memorandum from Richardson to Bailey, Ballard, Conway, Levine, Page, Simpson w/ attachment,

Subject:

Task Plan Preparation (22 pages)

22. 9/14/90 Memorandum from Martin to Taylor, l-

Subject:

Status of_ Staff Actions Related to the Diagnostic Evaluation at Palo_ Verde (2 pages)

23. 11/27/90 Letter from Zimmerman-to-Conway w/ attachment (29.pages)
24. 12/31/90 Memorandum from Martin to Taylor,-

Subject:

Status of Staff Actions Related to the Diagnostic Evaluation at Palo Verde (21pages)

25. 1/7/91 Letter from Zimmerman'to Conway w/ attachment (4.pages) 12 6. 7/91 APS (Arizona Public Service-Company) 1992-1995 Strategic Plan (24 pages) 1 s

% e g--av e+ g e

---h 'a -- - - - - _ . -- -

  • _ - - - . * - - s m - er 9 -

2 .-

27. Undated' Summary of' Actions for Palo Verde DET Report (pages)
28. Undated Main-Event and Causal Factors Chart (2 pages)

-4A o ct_ . A e <g:- 7y < p _ .w- g ._ , ,

gog S .. _.t. q.qy a.-+f, igx n j gg ;j#pfgp p $ 2A +l % -

i I

{

1 s

. 5

  • AKIN: GUMP, HAVER & FELD, L.L.P.

ATTORNEYS AT LAW 2100 rnANulN PW

< 4:00 ripst city etNita A PCGiSitRED LewiTto LtAsitiTT PAatHrRSHim til CONOREs3 AVENUC

  1. 700 pactric AvcNut 'NCLU*NG PNE58'ON^L coa
  • orations AUSTIN. Tt*.As 78701 15:26499 e OO DALLAS. TtxAs 7520be618 1333 NEW HAMPSHIRE AVENUE. N W.

SUITE Aoo 1500 NATIONSEANK PLA2 A 300 CONVCNT STRCCT C5 AvtNut Louist. P S NO 7 WASHINGTON. D.C. 2Oo36 SAN ANTONIO. TE.XAs 7820S

  1. 050 emusstLs. ettoivu ( o2188Mooo t5 21270-0800 1011l 32-2 535 2911 F Ax (202i 887 4288 4558 7,, louisiana sf actT weitte a einact oiA6 avuote isoti set. NousTON. TtxAs 77002

-(7131220-5800 February 21, 1992 BYHANDDELIVERk FREEDOM 0F INFORMATION Donnie H. Grimsley, Director ACT REQUETT Division of Freedom of Informa.on and Publications Service hp ggg U.S. Nuclear Regulatory Commission g_g4 Washington, D.C. 20555

Dear Mr. Grimsley:

V c This ' is a requdst' pursuant"Eo the Freedom' of Infh'rriti'on Act, 5 U.S.C. 552, and 10 CFR Part 9 for documents relating to Palo Verde Units 1, 2& 3, and more particularly described below.

For the purpose of this request, the term " document" means all memoranda, letters, filings, testimony, exhibits, contracts, transcripts, minutes, notes, drafts, studies, analyses, reports, maps, diagrams, charts, books. articles, pictures, printouts, tapes, or other written, graphic, or computerized information in any form which constitutes agency records under the Freedom of Information Act.

The documents we are requesting can more particularly be described as:

1. All documents, other than the NRC Augmented Inspection Team (AIT) report forwarded to Arizona Public Service (APS) on April 19, 1989 and the Diagnostic Evaluation Team (DET) Report forwarded to APS on March 16, 1990, which discuss, evaluate, analyze or otherwise address the causes of the 1989 outages at Palo Verde Units 1, 2, and 3; and the basis for the NRC Confirmation of Action letters issued on March 3, 1989; March 7, 1989; March 28, 1989; June 28, 1989; and December 24, 1989 that addressed the Palo Verde Units.

This request includes, but is not limited to, documents which address the causes of the shutdown resulting in the 1989 outages at all three Palo Verde Units and the causes of the 1989 outages exceeding the formally or informally scheduled or planned outage durations.

% Had5 esso Lee. \

m* 'hKIN. GuMP. HAVER & Fct.o. L.L,R Donnie H. Grimsley q February 21, 1992 I Page 2 .l

2. All transcripts, tapes or other record of interviews conducted during or in support of the NRC Augmented Inspection Team's review of the March 3, 1989 trip of Palo Verde Unit 3. The AIT review was reported in an AIT report forwarded to APS on April 9, 1989.
3. All' transcripts, tapes or other record of interviews conducted during or in support of the Diagnostic Evaluation Team s review of Palo Verde performance. The DET review was' reported in a DET report transmitted to APS on March 16, 1990.

Pursuant to 5 U.S.C. 9552(a)(6), a response to this request is required in ten days. We af.e willing to pay all- necessary search and copy fees associated with this request. Please notify the undersigned at (202) 887-4558 if these fees are expected to w e. exceed $450.00. If_any portion of this request is de.iied, please

' provide 'a ' detailed explanation of 'the' reasofis 'foF th'e*dinis1?ssi 3%*

~

required by 5 U.S.C. 9 552(a)(6).

Sincere ,

Bradle . J es rt- - -- -. .-

___ _____ _._ __.