Forwards Safety Insp Rept 50-293/92-24 on Stated Date.No Concerns or Violations Noted.Weaknesses Identified Re Posting of Spent Fuel Pool Against Inadvertent Withdrawal of Accessible High Radiation Sources Stored in Pool
ML20125C141
Person / Time
Site: Pilgrim
Issue date: 11/23/1992
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Richard Anderson
BOSTON EDISON CO.
Shared Package
ML20125C143 List:
References
NUDOCS 9212110066
Download: ML20125C141 (3)


See also: IR 05000293/1992024

Text

- - __ - - - -_ . .. - - -_

. , bcS '

.

. ,

.

NOV. 93 mn

Docket No. 50 293

Mr. Roy A. Anderson

Senior Vice President-Nuclear

Pilgrim Nuc! car Power Station

Boston Edison Co.npany

RFD #1 Rocky Hill Road

Plymouth, Massachusetts 02360

Dear Mr. Anderson:

SUBJECT: NRC Inspection Report No. 50-293/92-24

,

An unannounced safety I spection of the radiological controls program at your facility was

conducted by Messrs. D. Mann and J. Noggle on November 2 - 5, 1992. The inspection

findings were discussed with member 3 of your staff on November 5,1992.

Areas reviewed during the inspection were important b health and safety and are discussed in'

the enclosed inspection report. These areas included review of: audits and surveillances,

collective personnel exposure status, outage radiological contr-Is, and the implementation of the

internal and external exposure radiological programs during mid-cycle outage conditions.

Overall, the station demonstrated very good performance in the areas inspected. However,

weaknesses were identified in the lack of posting of the spent fuel pool to warn against the -

inadvertent withdrawal of accessible high radiation sources stored in the pool, staffing of the

naintenance planning section responsible for maintaining radiation exposures as low as

reasonably achievable, and following procedures for issuing Radiation Work Permits. Within-

the scope of this inspectior., othet than the weaknesses identified above, no safety concerns or

violations of regulatory requirements were identified.

No response to this letter is required. Your cooperation with us is appreciated.

Sincerely,

Original Signed By;

James H. Joyner

James H. Toyner, Chief -

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

OFFICIAL RECORD COPY S:/FRSSH/PILG9224.LTR December '2,1992 1\

lL

~ '

9212110665~9211'23

ADC,CF 75000293 -

,

)'

' -

.

PDR

G PDR -

(_ _ _

c,

_ _ . . = _ . =.- u

. . _ _ _ _ _ .. _ .. _ _ . . _ _ . _ _ _ . _ - . . _ . .

. .

4

..

,

-

NOV. 2 31992

Boston Edison Company- 2

Enclosure: NRC Inspection Report No. 50-293/92-24

cc w/ encl:

E. Boulette, Vice President, Nuclear Op..ations and Station Director

E. Kraft, Plant Manager

V. Oheim, Manager, Regulatory Affairs Department

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

The lionorable John F. Kerry

The Honorable Edward J. Markey

The lionorable Edward P. Kirby

The Honorable Peter V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

Regional Administrator, FEMA

Offic:: of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts .

T. Rapone, Massachusetts Executive Offke of Public Safety

Chairman, Citizens Urging Responsible Energy

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

OFFICIAL RECORD COPY ' S:/FRSSB/PILG9224.LTR November 23,1992

.. - .- - . .

. . - -.

.

.

.

NOV. 2 a 1992

Boston Edison Company. 3

bec w/ encl:

Region I Docket Room (with concurrences and IFS Forms) .

'

DRS/EB SALP Coordinator

J. Linville, DRP

E. Kally, DRP

J. Macdonald, SRI - Pilgrim (with mncurrences and IFS Forms)

W. Butler, NRR ,

'

R. Eaton, NRR

V. McCrec, OEDO

i

i

/

R1:DRS ' RI:DRSS .1: R. S RI:DRSS

Mann Noggle elak Joyner

T[k pdf i

11P392

11/g/92 1//[/92 11h92

,

OFFICIAL RECORD COPY S:/FRSSB/PILG9224.LTR November 23,1992

,

'

_