ML20125C013
ML20125C013 | |
Person / Time | |
---|---|
Issue date: | 12/31/1984 |
From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Reynolds N BISHOP, COOK, PURCELL & REYNOLDS |
Shared Package | |
ML20125C017 | List: |
References | |
FOIA-84-564 NUDOCS 8506110634 | |
Download: ML20125C013 (6) | |
Text
. .
fbs -0/G
- o
~,, UNITED STATES
!" n NUCLEAR REGULATORY COMMISSION
{ j WASHINGTON, D. C. 20555
\, * * * * * /
DEC 311964 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, NW IN RESPONSE REFER Washington, DC 20036 TO F01A-84-564
Dear Mr. Reynolds:
This is in further response to your letter of July 6, 1984, in which you requested, pursuant to the Freedom of Information Act (F0IA) and the Comission's F0IA regulations, five categories of documents regarding license .
and inspection fees.
Forty-one pages of documents, listed on Appendix A, are enclosed. The document listed on enclosed Appendix B is already piiblicly available at the NRC's Public Document Room, located at 1717 H Street, NW, Washington, DC.
The accession number is indicated for your information.
The document listed on enclosed Appendix C is being withheld in its entirety because it is predecisional in nature and contains the advice, opinions, and recomendations of the Chairman to the Commissioners. This document is being withheld pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Comission's regulations. There are no segregable portions of the document which may be released.
Pursuant to 10 CFR 9.15 of the Comission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Mr. John C. Hoyle, Assistant Secretary of the Comission.
This denial may be appealed to the Comission within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an
" Appeal from an Initial FOIA Decision."
g610 4 841231 REYNOLD64-564 PDR
II ..
Mr. Nicholas Reynolds The search for and review of additional documents subject to your request have not been completed. As soon as the search and review have been completed, we will comunicate with you.
Since, rely,
.by J. . Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated
'.. . (
t i
RE: F01A-84-564 APPENDIX A
- 1. 12/16/81 EDO Principal Correspondence Control sheet with attached 12/16/81 Affirmation Vote Response Sheet from Commissioner Ahearne, re: SECY-81-615 - License Fees--Proposed Schedule and attached Ahearne's comments on SECY-81-615 (3 pages)
- 2. 8/20/82 Affirmation Response Sheet from Commissioner Asselstine, re:
SECY-81-615, License Fees--Proposed Schedule (1 page)
- 3. 9/9/82 Affirmation Vote Response Sheet from Commissioner Roberts, re:
SECY-81-615 - License Fees--Proposed Schedule (1 page)
- 4. 2/14/84 Letter to Nunzio Palladino from Rep. Bruce F. Vento with attached questions and answers sheets (4 pages)
- 5. 2/29/84 Memo for the Commissioners from Nunzio J. Palladino, re:
Commission Action on Pending SECY Papers (1 page)
- 6. 3/6/84 Affirmation Response Sheet from Commissioner Gilinsky, re:
SECY-83-495 - License Fees - Final Rule (1 page)
- 7. 3/9/84 Affirmation Response Sheet from Commissioner Roberts, re:
SECY-83-495 - License Fees - Final Rule (1 page)
- 8. 3/9/84 Affirmation Response Sheet from Commissioner Asselstine, re:
SECY-83-495 - License Fees - Final Rule (1 page)
- 9. 3/10/84 Affirmation Response Sheet from Commissioner Bernthal, re:
SECY-83-495 - License Fees - Final Rule (1 page)
- 10. 3/13/84 EDO Principal Correspondence Control sheet with attached correspondence control ticket and the following enclosures -
(2 pages)
- a. 3/13/84 letter to Nunzio Palladino from Sen. Alan K.
Simpson (2 pages)
- b. 2/10/84 letter to Sen. Alan K. Simpson from Glenn J.
Catchpole (2 pages)
- c. 2/3/84 letter to Sen. Alan Simpson from T. G. Melrose (2 pages)
- 11. 4/3/84 Memo for William J. Dircks from James K. Asselstine, re:
SECY-83-495 -- License Fees (1 page)
- 12. 4/5/84 Letter to Sen. Alan K. Simpson with attachments a, b, and c from document no. 10 (2 pages) (Note: Since a, b, and c are included with document no. 10, they are not duplicated here.)
~1 .-
2
- 13. 4/10/84 Homo for William O. Miller from Elliott A Greher, re:
FY 1981 Routine Inspection Effort at Operating Reactors, without enclosure (2 pages) (Note the enclosure is the same document as document no. 11 on the preceding page.)
- 14. 4/12/84 Routine Safety & Safeguards Inspection for FY 83, Report
- 2/ Selection Based on 11 Pic-Codes (5 pages)
- 15. 4/17/84 Memo for Commissioner Asselstine from William J. Dircks, re: SECY-83-495 - Ceiling for Routine Inspection of Power Reactors, with the following attachments: (1 page)
- a. 7/27/81 Memo for Daniel J. Donoghue from Victor Stello, re: Proposed License Fee Schedule Revision (1 page)
- b. Undated table entitled " Range of Inspection Manpower Expected per Typical License for Inspection Conducted during FY 1981"(1 page)
- c. 4/9/84 Computer printout indicating Routine Safety &
Safeguards Inspection for FY 81 (5 pages)
- 16. 4/19/84 Memo for Samuel Chilk from James K. Asselstine, re:
SECY-83-495 -- License Fees (1 page)
ret FOIA-84-564 APPENDIX B
- 1. 4/30/84 Memo for William J. Dircks, Carlton rs=*rer, and Joseph J.
Fouchard from Samuel J. Chilk, re: Staff Requirements -
Affirmation / Discussion and Vote on SECY-83-495 - License Fees - Final Rule (1 page)
PDR Accession No. 8405150274 l
'e RE: FOIA-84-564 APPENDIX C
- 1. 4/2/84 Memo for'the Commissioners from Nunzio J. Palladino, re:
SECY-83-495 - License Fees (1 page) l J
.