NARRATIVE SLt@%RY OF lotTHILY OPERATI!G EXPDUDJCE UTIT 1 NOVHGER 1992 November i Unit startup continued from October following camp 3etion of 33 pairs to the "A"
Reactor Coolant Pump Motor.
We Unit remained in Mode 3 until 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br /> when the station entered Mode 2.
We reactor was taken critical at 2112 hours0.0244 days <br />0.587 hours <br />0.00349 weeks <br />8.03616e-4 months <br /> ard Mode 1 was entered at 2142 hours0.0248 days <br />0.595 hours <br />0.00354 weeks <br />8.15031e-4 months <br />.
November 2 At 0417 hours0.00483 days <br />0.116 hours <br />6.894841e-4 weeks <br />1.586685e-4 months <br /> the output breakers were closed synchronizing the Main Unit Generator to the grid.
Se Unit achievcd approximately 90% output at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
November 3 h e Unit continued to operate at approximately 90% output in throtgh ao::ordance with the planned fuel cycle length extension November 30 throughout the remainder of the report period.
9212090223 921207 PDR. ADOCK 05000334-R PDR j
AVEPME DAILY QiIT PCER 11VIL i
t DOCKET 10, 50-334 UTIT.BVPS Unit 1 DATE Dec. 3, 1992 CCt4PILTED BY David T. Jones TELEPH0 tie (412) 393-7607 IOlilH llovember 1992 DAY AVERAGE DAILY PCMR LEVE1 DAY AVEPME DAILY POWER IIVEL (Wo-Net)
(We-Net)-
1 0
17 733-2 246 18 738 3
717 19 738 4
738 20 750 5
739 21 721 6
732 22 729 7
742 23 737 8
733 24 738 9
738 25 748 10-738 26.
729 r,
11 733 27
-750 12 729 28 733 13 750 29 733 14 746 30
'733 15-750 16.
729 i
l i
l INSTRUCTIONS On this fornnt, list the average daily unit pcuer level Ne-Net for each day in the reportirq renth. Orpute to the nearest whole megawatt.
OPERATING CATA REPORT l
DOCV.ET NO.,
50 334 REPORT DATE:
12/03/92 COMPLETED BY: DAVID T. JONES TELEPHONE-(412) 393 7607 i
OfffATJyG STATUS l
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: !!OVEMBER 1992 i
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross NWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Grost, M'.le):
860
- 7. MAX. DEPENDABLE CAPACYTY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
_ULA THIS MONTH
' FEAR TO DATE CUMifLATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 8040.0 145392.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
698.8 7482.7
-92806.3
- 13. REACTOR RESERVE SHUTDOWN HCURS:
0.0 0.0 4482.8
- 14. HOURS CENERATOR WAS ON LINE:
691.7 7475.6 90906.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16 GROSS THERMAL ENERGY GEN. (MWH):
1620623.0 18694234.0 217206410.5
- 17. CROSS ELECT. ENERGY GEN. (MWH):
531020.0 6114120.0 69912523.0-
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
499680.0 5751680.0 65319230.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 96.1 93.0 64.6-
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.1 93.0 64.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 83.1 85.7 56.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.9 7.0 16.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
_THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELING OUTAGE ON APRIL 2.
1993.
THE REFUELING OUTAGE IS SCHEDULED TO 1AST FOR 70 DAYS.
25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO C0KMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COHMERCIAL OPERATION N/A N/A i
UNIT SNUTDOWNS AND PCWER REDUCTIONS (220%)
Docket to.
50-334 Unit Name _8vPS Unit #1 Date December 3. 1992 Completed By David T.
Jonts REPORT MONTH NOVEMBER 1992 Telephone (412) 393-7607 Method of Licensee Cause & Corrective Duration Shuttir.g Event System Component Action to No.
Date Typel (Nours)
Ressen2 Ce n Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 17 921101 F
48.3 A
I 4
92-009-00 CS M010RX The Unit remained shutdown after-experiencing a reactor trio due to a trip of the "A* Reactor Coolant Pump caused by an electrical ground internal to the motor.
18 92t102 s
0 M
9 N/A ZZ 222ZZZ The Unit ceased power ascension at apcronimately 90% output and continued to operate at this reduced output in accordance with the planned fuel cycle length extension.
.l 1
i 2
3 4
F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File
.. C-R e f uel i ng.
3-Automatic Scram (NUREG0161).
-D-Regulatory Restriction 4-Cont'd. f rom Previous Month E-Operator Training & License Exam.
5-eeduction 5
F-Administrative 9-Other Exhibit H-Seee Source.
G-operational Error (Explain)
W-Other (Emplain)
ImRPATIVE SU EARY OF 10!TIHIN OPDMTDIG EXPERIDICE Uli1T 2 IK7/DGER 1992 Noveder 1
'Ihe Unit operated at a ratiml value of 100% output.
throu@l lloveder 24 Noveder 25 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit reduced output to approxim tely 46%
in accordance with the planned fuel cycle length extension.
tiovember 26 The Unit continued to operate at approxirately 46% output in thromih accordanen with the planncd fuel cycle length extension.
!!ovember 29 tioverter 30 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the Unit commenced a pcLur increase to 100%
output.
A nominal valt;e of 100% output was achieved at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.
The Unit continued to operate at a nxtiml value of 100% cxitput for the remainder of the report period.
im uilllBu i
gii r
li J
t AVEFEE DAILY U!iIT PORR IIVEL DOCKET. 10.
50-412 U! TIT BVPS Unit 2 DATE Dec. 3. 1992 Et@IfrED BY David T. Jones TELEPHOtIE J4121 393-7607 MOITIH tioverter 1992 DAY AVEP/CE DAILY IGER LEVIL DAY AVERIGE DAILY PGiER LEVEL (154e-liet)
(!fde-fiet) 1 809 17 831 2
834 18 838 3
834 19 837 4
834 20 832 5
843 21 827 6
845 22 830 7
846 23 832 8
844 24 825 9
842 25 b13 10 839 26 357 11 838 27 352 12 836 28 349 13 841 29 315 14 841 30 741 15 840 16 836 IISIRLY.TIO!!S On this formt, list the average daily unit. pcuer level 154e-Net for each day in the reporting renth. Ccrpute to the nearest whole rxgawatt.
i OPERATING DATA REPORT DOCKET NO.
50 412 REPORT DATE:
12/03/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7607 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: NOVEMBER 1992
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 8040.0 44175.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
720.0 6677 0 37757.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS CENERATOR VAS ON LINE:
720.0 6599.3 374"'.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY CEN. (MWH):
1752279.0 16478316.0 91838063.4
- 17. CROSS ELECT, ENERGY GEN. (MWH):
583392.0 5401160.0 29575741.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
553197,0 5106731.0 27912216.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 82.1 84.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 82.1 84.8
- 22. UNIT CAPACITY FACTOR ' DER): PCT 91.9 76.9 75.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.2 3.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE. AND DURATION OF_ EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A __
+
UNIT SHUTDOWNS AND POWER REDUCTIONS (t20%)
Docket No.
50-412 Unit Name BVPS Unit #2 Date December 3. 1992 Completed By David T.
Jones REPORT MONTH NOVEMBER 1992 Telephone (412) 393-7607 Method of Licensee cause & Corrective Duration Shutting Event System Component Action to io.
Date Typel (Mours)
Reason 2 Down Reactor 3 Report #
Cod =4 Codes Prevent Recurrence i
18 921125 S
0 N
5 W/A 22 ZZZZZR Unit reduced output from 100% to approximately 46% in accordance with the planned fuel cycle tength extension.
r 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets
' 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling' 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4 Cont'd. from Previous Month E-operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit N-Same Source.
G-operational Error (Explain)
H-Other.(Explain)
.