Text
l m
H
^"
License No. DPR-50 APPENDIX A
_ ().
NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on November 10-19, 1975, it appears that one of your activities was not conducted in full gompliance with conditions of your license as indicated below:
7
- q A.
Contrary to Technical Specification 6.2.3 requirements for adherence
..O to procedures, the following examples of nonconpliance with procedures were identified.
l'.
Data recording requirebents of SP1303-4.1 were not met for tests performed on July 22, 1975 and September 24, 1975; in that High Flux bistable input voltage at the trip point was not recorded j
quired by the procedure. Actual system settings did not J
ed, Limiting Sa_ety System Settings in this case.
2.
The power, range amplifier resetting administrative 1y required by SP1302-1.1 to assure setpoint maintenance within the appro-priate range was not accomplished on August 7, 1975.
Actual system settings did not exceed Limiting Safety. System Settings in this case.
"m
(
')
This item is a Deficiency.
l
()- /
r i"
90012521 l
{
l I.
)
7910190 1
w
,