ML20125A670

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. No Action Required
ML20125A670
Person / Time
Site: Peach Bottom  
Issue date: 07/26/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 7908100261
Download: ML20125A670 (1)


Text

'"h g

fp yg e((4 y

UNITED STATES g

NUCLEAR REGULATORY COMMISSION O\\

REGION I C

[

I 611 PARif AVENUE 4..V KING OF PRL 'tlA, PENNSYLVANI A 19406 July 26, 1979 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

The enclosed Bulletin 79-17 is forwarded to you for information.

No written response is required. However, the potential corrosion behavior of safety related systems as it regards your plant over the long tem should be taken into considerction.

If you desire additional information concerning this matter, please contact this office.

Sincerely, Boyce H. Grier

" Director

Enclosures:

1.

IE Bulletin No. 79-17 with Attachments

)

2.

Listing of IE Bulletins Issued in Last 12 Months cc w/encis:

W. T. Ullrich, Station Superintc.*nt Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond L. "?'is Esquire Warren Rich Esquire i

)

l l

790810026/

-..