Verifies Operability of Manual Reactor Trip Switch Circuitry Per Emergency Amend 73 to License NPF-30 Re TS 4.3.1.1.On 920920,turbine Trip/Reactor Trip Experienced Due to Component Failure.Surveillance Performed on 920920
ML20118C044
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/25/1992
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M84230, ULNRC-2701, NUDOCS 9210090133
Download: ML20118C044 (2)


Text

,

m ua .a.

l' TO 10 6 i  ? 1:,- r , qt

' n' 'i l; bl (f 1 1.i Union b,ll?(lTltf(J September 25, 1992

~""'"M"c" .

[*

U.S. Nuclear Regulatory Commission ALLn; Document Control Lask Mail Stop P3-137 Washington, D.C. 20555 ULNRC- 2701 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT EMERGENCY TECHNICAL SPECIFICATION CHANGE TO SURVEILLANCE REQUIREMENT 4.3.1.1 (FUNCTIONAL UNIT 1)

EMEpr;ENfY AMENDMEET NUMBER 73 (TAC NO. MR,4230)

Emergency Amendment No. 73 to the Callaway Plant Facility Operating License No. NPF-30 granted a one time only extension to the surveillance interval for the manual reactor trip switch circuitry. Amendment 73 required complete verification of OPLRABILITY of the manual reactor trip switch circuitry be performed prior to startup from the first shutdown to Mode 3 occurring after August '/, 1992.

On September 20, 1992, Callaway Plant experienced a turbine trip / reactor trip due to a component failure concurrent with a weekly preve ntive maintenance test of the main turbine thrust bearing tr.p as required by the Turbine Overspeed Protection Program. ' he surveillance of the manual reactor trip switch circuitry was successfully performed on September 20 to independently verify the

! OPERABILITY of the Undervoltage and Shunt Trip Attachments of the Reactor Trip Breakers.

l The plant entered Mode 2 on September 21 and is currently in Mode 1 at 100% power.

very truly yours, 600C3; 1

h8f]agf

, /

Donald F. Schnell G

s i

DS/dls f h 9210090133 920925 .

i PDR ADOCK 05000483 p PDR

k~

. 4

)

cc: T. A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 Dr. J. O. Cermak CFA, Inc.

18225-A Flower Hill Way Gaithersburg, MD 20879-9334 L. Robert Greger Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Bartlett Callaway Resident Office U.S. Nuclear Rec,ulatory Commission RR#1 Steedman, Missouri 65077 L. R. Wharton (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

! I White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Se ice Commission P.O. 00:.: 360 Jefferson City, MO 65102 Ron Kucera Department of Naturnl Resources P.O. Box 176 i Jefferson City, MO 65102 i

i I

l l

l l