ML20118A102

From kanterella
Jump to navigation Jump to search
Forwards Vols 1-3 of Interval 1,Period 3,Outage 3 ISI Rept of Jm Farley Nuclear Plant Unit 2 & Vols 1-3 of Interval 2,Period 1,Outage 1 ISI Rept of Jm Farley Nuclear Plant Unit 2, Per 10CFR50.55a(g) & 10CFR50.36
ML20118A102
Person / Time
Site: Farley 
Issue date: 07/22/1992
From: Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115B979 List:
References
NUDOCS 9207310033
Download: ML20118A102 (1)


Text

-

Southem Nockar Operating Company Post Offce Bos 1295

(

B.rmin; rum. A!abama 35201 Tc!cphone 201, 869 5086 k

h Southern Nudear Operating Company 1 o. w oe,,a

$e j

July 22, 1992 the sovthem eleanc system Docket No. 50-364 10CFR50.55a(g) 10CFR50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Joseph M. Farley Nuclear Plant - Unit 2 Interval 1/ Period 3/00tage 3 and Interval 2/ Period 1/Cutage 1 Inservice InsAe_q11on Reports Gentlemen:

Pursuant to the requirements of 10CFR50.55a(g) and 10CFR50.36, Southern Nuclear Company herewith submits the Joseph M. Farley Nuclear Plant Unit 2 Interval 1/ Period 3/ Outage 3 and Interval 2/ Period 1/0utage 1 Inservice Inspection Reports. These reports describe and summarize the inservice inspection activities performed during the Unit 2 eighth refueling outage. These activities were completed May 6, 1992.

Completion of the Unit 2 First Ten Year Interval examinations were deferred until the eighth refueling outage per the ASniE Code,Section XI, IWA-2400. The results of these examinations are reported in the Interval 1/ Period 3/0utage 3 report.

Completely separate and distinct examinations and reports were made as required for each Interval's examinations.

Included in the Interval 2/ Period 1/0utage 1 report are the results of the steam generator eddy currcnt testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the Farley Nuc'. ear Plant Unit 2 Technical Specifications.

Specifically, the results and a summary may be found in Tab B.

Other pertinent report information is available at Farley Nuclear Plant for your review.

This information includes as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective actions and repairs.

If there are my questions, please advise.

Respectfully submitted, L90011 (gbk.\\

D). Woodard JDW/ CDP:pgr-nrc-oa Enclosure cc: Mr. S. D. Ebneter w/l encl.

i Mr. S. T. Hoffman (l\\,

. J g' Mr. G. F. Maxwell

\\ 9y I

9207310033 920722

\\

t PDR ADOCK 05000364 O

PDR

_ _ _ _ _ _ _ - - - _ - -