ML20115B975
| ML20115B975 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/29/1992 |
| From: | Woodard J SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20115B979 | List: |
| References | |
| NUDOCS 9210190066 | |
| Download: ML20115B975 (3) | |
Text
,.
(1
.{' P Sout%rn Nccioar Operat.ng Company Per.t O":00 Box 1295 Dirnungham, Alabima 35?01 Telephone 205 808 5086 Sotithern Ntidear Operating Company J. D. Woedard Presc t September 29, 1992 the southem elecinc system DodkelNo.50-364 10CFR50.55a(g) 10CFR50.36 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555 Joseph M. Farley Nuclear Plant - Unit 2 Interval 1/ Period 3/Out.ne 3 and Interval 2/ Period 1/ Outage 1 Inservice Inspection Reports Gentlemen:
Dy !ctter dated July 22, 1992 Southern Nuclear Company submitted the Joseph M. Farley Nuclear Plant - Unit 2 Interval 1/ Period 3/ Outage 3 and Interval 2/ Period 1/0utap 1 Inservice Inspaction Reports.
As noted by the NRC staff, the " Equipment Certs" sections of Volume 1 of
)
both of these reports included data sheets marked proprietary.
However, as described in the attached Westinghouse letter of September 8 1992, none of the information in those reports is proprietary and may be reproduced as necessary under government regulations associated with public information rights.
Enclosed are replacement " Equipment Certs" sections for both reports which have the p oprietary stamps removed.
The entire " Equipment Certs" sections from Volume 1, Tab G for both submittals shoul6 be removed and replaced with the respective section noted on the cover sheets of the enclosures.
If there are any questions, please advise.
Respectfully submitted, kh SQ Poodard JDW/ CDP:pgr-nrc-oa Enclosures cc: Mr. S. a. Ebneter w/l encl.
Mr. S.
. Hoffman Mr. G. F. Maxwell Y
i
.ik j
9210190066 920929
\\/J PDR ALOCK 05000364
.A g
a PDR
\\
s-Westinghouse EnethSystems we8' 3mes S*SS Electric Corporation 83 333 P"
a en ania 15230-0355 September 8, 1992 4
Mr. J. D. koodard, Vice President Nuclear Generation
- Southern Nuclear Operating Company P. O. Box 1295 Birmingham, AL 36201-1295 Attentioa: Mr. Sid Burns l
Dear Mr. Woodard:
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
JOSEPH M. FARLEY NUCLEAR PLANT UNIT-1 BEACTOR VESSEL REPORT PROPRIETARY DATA SHEETS This letter is to acknowledge that the PROPRIETARY statements located in the final reports for Interval 1 Period 3, Outage 3, and Interval 2, Period 1,
^
Outage 1 are not correct.
Any reproduction of these documents can be performed under government 3
- egulations associated with the public information rights.
Corrected data sheets for the Equipment Calibration sections for the above reports have been forwarded to site.
If you have any questions, please contact this office.
Very truly yours,
-WESTINGHOUSE ELECTRIC CORPORATION L.E. H ca_ L re a_
J. A. Knochel, Manager Alabama Project ec:.
W. G. Hairston III IL J. D. Woodard IL D.-E. Mansfield IL B. D. McKinney IL R. D. Hill IL J. E. Love IL T. T. Robin 11
' %s&
- k D. J. Shelton IL 36 K. M. Patton 1L s
R. W. Wise IL l/.
Q 3
D. Pugh IL
'J
,,, ' 'n..c rf P
%.aQ [791 S. Burns IL t
M
- i..
The mtssion ofNSD is to proude our customers unth people. rquepment and seruces Cr97*7 t'nat set the standards of excellence in the nuclear sndustry."
e