. _.
o,mmonwrann runon o mpany Qtud Citics Generating Station 22710 2(Xsth Asenue North Girdova, fl. 612 62 97 to
'frl Mrn>5 6 22il ESK-96-116 June 10,1996 i
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Quad Cities Nuclear Power Station Units 1 and 2 Supplement to Application for Amendment to Facility Operating Licenses DPR-29 and DPR-30, Appendix A, Technical Specifications for the Technical Specifications Upgrade Program (TSUP)
New Surveillance Waiver NRC Docket Nos. 50-254/265
References:
(1)
P. Piet Letter to T. Murley, dated November 14,1995 (2)
E. S. Kraft, Jr. Letter to NRC, dated March 25,1996 (3)
P. Piet Letter to NRC, dated May 10,1996 The purpose of this letter is to update item 14 of Reference (1) to specify the surveillance requirements that will not be current upon full implementation. This item was previously updated in References (2) and (3). Comed requests that implementation of the surveillances listed in Attachment A be delayed until the next refuel outage for each unit.
Three surveillances (Logic System Functiona! je (LSFT) for Main Steam Line relief valves, Turbine Control Valve Fast Closure RPS Calibration, and Reactor Mode Switch Shutdown Position RPS Response Time Test) have been removed from the list. These surveillances have been performed in accordance with the appropriate approved Technical Specification Upgrade Program (TSUP) submittals. Three surveillances (Turbine Stop Valve Closure RPS Calibration, SBLC Initiation, and Emergency Diesel Generator 24 Hour Test) have been added to the list. These surveillances have not been performed per the appropriate approved TSUP submittals. The Turbine Stop Valve Calibrations and the SBLC Initiation would require that the unit be shut down in order to perform the test.
The Diesel Generator 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test was performed within the last 18 months (the current 9606180236 960610 PDR ADOCK 05000254 P
PDR a
A Unicom company i
.p.
J a
\\
4 i
'. ESK-96-116 i
g i
i' and TSUP schedule), but was not performed per the TSUP requirements. Performing this I
test again prior to its regularly scheduled performance (the next refuel outage for each unit) would constitute an unnecessary challenge to the system.
l
. Please direct any questions or comments concerning this letter to Nick Chrissotimos, Regulatory Assurance, at (309) 654-2241, extension 3100.
}
Sincerely, i
a i
h.
E. S. Kraft, Site Vice President Quad Cities Station
Attachment:
A)
Deferred Surveillance Requirements Listing i
cc:
H. J. Miller, Regional Administrator - Region III
(
R. M Pulsifer, Project Manager - NRR f
C. G. hSler, Senior Resident Inspector - Quad Chies Office of Nudear Facility Safety - IDNS l
D. B. Tubbs, MidAmerican Energy R. J. Sing:r, MidAmerican Energy l.
l 1
y
,w.
1 l
June 10,' 1996 USNRC ATTACHMENT A Technical Specification Upgrade Program Quad Cities Nuclear Power Station Deferred TSUP Surveillance Requirements i
SR 4.1.A.1 Main Steam Line Isolation Valve Closure RPS Calibration, i
Table 4.1.A-1, Item 5, Unit 2 j
SR 4.1.A.1 Turbine Stop Valve - Closure, RPS Calibration, Table 4.1.A-1, Item 9, Unit 2 SR' 4.2. A.2 Logic System Functional Tests (LSFT), for Isolation Actuation Instrumentation, Table 4.2. A-1, Items 2.a, 2.b, 2.c, and 2.d, Secondary Containment Isolation, Unit One and Unit Two SR 4.2.A.2 LSFT for Isolation Actuation Instrumentation, Table 4.2.A-1, Item 4.a, Reactor Water Cleanup (RWCU) Isolation on Standby Liquid Control (SBLC)
Initiation, Unit Two SR 4.2.C.2 LSFT for Anticipated Transient Without Scram (ATWS)
Recirculation Pump Trip (RPT), Unit Two SR 4.4. A.4.a SBLC Initiation, Unit 2 SR 4.9.A.8.h Emergency Diesel Generator 24 Hour Test, Unit One and Unit Two
-