Forwards Addl Info in Response to RAI Re Plant ISI Program Plan for Second 10-yr Interval.Revised Relief Requests 1-ISI-3 & 2-ISI-3 That Supersede ISI-3 Relief Requests, Provided
ML20117M047
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/06/1996
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609170259
Download: ML20117M047 (132)


Text

j Tennessee Valley Authonty, Post Office Box 2000, Soddy-Da:sy, Tennessee 37379-2000 September 6,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 GerTtlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SON)- ADDITIONAL INFORMATION FOR SECOND j

10-YEAR INTERVAL - INSERVICE INSPECTION (ISI) PROGRAM PLAN

References:

1. NRC let+er to TVA dated June 9,1996, " Request for Additional Informatien - Second 10-Year Interval Inservice Inspection Program Plan - Sequoyah Nuclear Plant Units 1 and 2 (TAC Nos. M94115 and M94116)"
2. TVA letter to NRC dated November 21,1995, "Sequoyah Nuclear Plant (SON) - American Society of Mechanical Engineers (ASME) -

Section XI Programs for the Second Inspection Interval, Units 1 and 2"

Enclosed is the additionalinformation requested in Reference 1 concerning SQN's ISI program plan for the second 10-year interva!. TVA's response reflects the information that was discussed with the NRC staff and Idaho National Engineering Laboratory staff during two telephone conversations held on June 25 and June 27,1996.

Please note that TVA is providing three additional relief requests in response to item 2.B of Reference 1. These additional relief requests utilize alternative rules provided by American Society of Mechanical Engineers code cases. In addition, in response to item 2.C of Reference 1, TVA is providing revised relief requests (1-ISI-3 and 2-ISI-3) that supersede the ISI-3 relief requests previously provided in Reference 2.

,., n, g e*.>>

/ //

j,

.j ; :

9609170259 960906 DR ADOCK 05000327 PDR

U.S. Nuclear Regulatory Commission Page 2 September 6,1996 Please direct questions concerning this issue to D. V. Goodin at (423) 843-7734.

Sincerely, 2d.2/A' R. H. Shell Manager SON Site Licensing Enclosure cc: Mr. R. W. Hernan, Project Manager (w/ Enclosure)

Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION DATED JULY 9,1996 ITEMS 2.A., 2.B., AND 2.C.

I l

l ITEM 2.A.

As requested SQN is providing a preliminary examination plan defining components currently scheduled for examination in the second interval. An updated Unit 2 examination schedule,0-SI-DXI-000-114.2, Attachment 5 revision 2 is being provided. The Unit 2 examination plan includes component identifiers, examination categories, item numbers, drawing numbers, examination method (s) and examination period in which the examinations are currently scheduled.

The examination plan ofindividual components for SQN Unit 2 is representative of the plan that will be prepared for Unit 1. Currently due to plant schedules the individual components have not yet been selected for SQN Unit 1.

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL ET SYSTEM IDENTIFIC ONNU fBER. PERIOD METHOD yyygE N MBER CATEGORY CLASS 1 i

RV WO2-03 3

UT ISI-0298 C-2 ~ '~ B1.11 ~ N~ ~ ~ ~ B'-

~

j

~V I

' ~ WO3-04

~ ~

~3 I

UT

' ISi-0298 C 2 l '~~~ ~ i d1

~~ i

~

R 7

B B

.~Ri/

"l ~ ~

WO4-05

I

~3 OT ISI-0298-C-2 I

~B1.i 1~~

i

~

~'

BA!~

~ RV

~~

WOS-06 ~~

I 3

UT ISI-0298 C 2 i B1.11

'I

~ B1 ~' ~

11

~~

RV WO6d7 ~ ~ ~

^

- 81.1i

'BA S

3 UT ISI-0298-C-2

^

RV" WO1-02 3~

'UT'

~ ISI-0298 C-2 81.21 B-A RV WO910~

I

'3

'UT ISI-0301-C-1 ~~

B1.21 B^

RV W2A' 3

UT ISI-0298 C-2 B1.22 B-A

^

]

~RV W2B 3

UT ISI-0298-C-2' '

Bi.22 B-A RV W2C 3

UT

'lSt-0298-C 2i~~

~ B1.22 "

B-A j

RV.

~ W2D ~

L3 _, _ UT

,L ISI-0298-Cf2_ [

_ B1.2'2[ ~

[ _~B- ( _

~

3 UT ISI-0298-C-2 B1.22 B-A W2E RV RV i~ ~~

~W2F' '

~

3 UT ISI-0298-C 2 ~I

~ B1.22 ~~~~I B-

~~

l

' ' RV~~

~ ~

~ WO8-09 ~ ~~

'3 MT/UT ISI-0301 -C-1

'B130 I ~ ~ ~ B-A~ ~ ~

~~

PZR ~i

~ ~ ~ ~W P-1

! ~ 2 i

UT ISI-0396-C-1 ~$

B2.'1 i '~ l B-B

~

f

~ WP-5

_[

} 3 ~~ ~ f UT' _ _ [ _ ISl{0396-C-1 [ _ B2'.[11[{[B}B _ [

' PZR PZR WP-6 2

UT ISI-0396-C-1 i

B2.12 1

B-B i

4

_.. G _

L SGW -A1 i 1 U_T_ [ISI_ 396_C-i][B2.12][jB ))

PZR i{ } [~ yP_9~

~

I~ ~ 3

-. 'UT

~

S

._.RV_ _

_ _ N11__

! ISI 0401-C-1 UT 4

B2._40_ J _ _,B;B _ _ _

N12_

j 3_

j

_].lSI _0298-C-2_ _,4 _ _ B3.90 ] _ _ _ B-D_

j RV 3 _ _ [ __ UT ISI _0298-C-2

_.B3[.90_

J____B:D i

a RV N13 1

3 UT ISI-0298-C-2 B3.90 B-D RV~~

~~N14~

^

"~

3 i

UT ISI-0298-C-2 83.'90 B-D RV

~

N15

~

'3 UT ISI-0298-C-2 B3.90

~B-D RV'

'N16 l

3 UT ISI-0298-C-2

' B3.90 '

B-D

^

^

3 RV'

[

_N18 3

UT ISI-0298-C-2 B3.90 B-D

.}

3_

[

'UT l

lSI-0298-C-2~~ l

' B3.90~ _ { [EbD

~

N17 RV RV N 1 i ~ ~lR 3

I UT ISI 0298-C-2 i~

'83.iOO '

B-D Ni'2-IR

~

{3 UT ISI 0298 C 2~

B3.100

[B-D RV RV N13-IR i

3 UT ISI-0298-C-2 83.100 B-D 1

RV N14IR 3

UT I

ISI-0298-C-2

'83.10'O B-D ~

I

.[.

~.N15-l'R 3

UT ISI-_0298 C 2 }

B3.100._j RV

_D__

B 3

RV

__N16lR,

_3 l

__UT _

UT Isl;0298 C-2

[

83.100 B-D

.RV,

._N17-IR_

. 3 UT 3

ISI 0298-C-2 y _ B3.100_

B-_D RV,.

N18-lR

_1

_UT__

q ISI 0298 C-2

_B3.100_

E _ _B-D_

___PZR RCW-21 ISI-0396-C-1

__B3.11_0

_ _ B;D_

+

PZR RCW-15 1

UT ISI-0396-C-1 B3.110

(

B-D i

4

~

j PZR' RCW-16 ~

2 UT I

ISI-0396-C-1 l~ B3.110 I'

B-D ~

PZR ~

  • RCW-17 '

~'

2 UT i ~ ISI-0396-C-1

~ B3.110 i

B-D t

PZR~

~~

RCW-i 8

^

UT' ISI-0396-C-1 I

B3.110 B-D 3

PZR I

RCW-19 3

UT ISI-0396-C-1

- B3.110 i

BD PZR RCW-21-IR' ~

~1 UT 1

ISl 0396-C-1 B3.120 B-D PZR RCW-19-IR 3

UT

[

ISI-0396-C-1 B3.120

'B-D PZR RCW-16-IR' I

2 UT ISI-0396-C-1 B3.120 B-D

~

PZR RCW 17-IR

'2 UT ISI 0396-C 1

^

B3.120 B-D

~

PZR RCW-18-IR 3

UT ISI-0396-C-1 B3.120 B-D PZR-RCW 15-lR 1

SG'

~SG 1-H-IR 1

UT

~

ISI-0396 C 1 B3.120 BD UT B-D ISI-0401-C-1 B3.140 SG SG-1-C-IR 1

UT ISI-0401 -C-1 B3.140 B-D 1

U2RAIJCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL COMPONM ISOMETRIC ITEM CODE SYSTEM IDENTIFICA TION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY SG SG-2-H-IR 2

UT ISI-0401 C-1 B3.140 BD i

SG I

SG 2-C-IR '

I 2

UT ISI-0401-C-1

~ B3.140'

'B-D

~

1

^ SG I

^

~

SG 3 H IR '

3 UT ISI-0401-C 1 B3.140 B-D 1

'~

~

SG SG'-3-C-IR~

3 UT ISI 0401-C 1 I B3.140 i

B-D

~

SG 4 H-IR l

3 UT ISI-0401-C-1 B3.140~

'B-D '

l I

SG

~

SG.

[

SG-4 C-lR.

,3. ]

[

ISi-0401-C-1

~

UT B3.140 B-D

^

RV UPlW-24P 3

VT-2 ISI-0097-C-1 B4.11 B-E f

[.

3_

^

RV VENT-1 ~

3 VT-2[

ISI-0097-C-1

_ B4'. i i

_ _B[E

~ ' RV ~

CRDW XXP (20 TOTAL)

~ I VT-2~

ISI 0319'-CT ' ~ ~ B4.13

!~

RV VT-2 ISt-0097-C-1

)

B4.12 B-E i

I

~

~'

INS PEN XXl15 TOTAL) 3

~

BE'~~~

I

~ l' ~ EIP 2-lKX (78 TOTALi 3

i VT-2

~ ISI-0309'-A-1

'i ~ '

~B4.20^^

~I ~ ~ ~ ~ B-E ~ ' ~ ~

'~RV i

)[ _T_

{ RC[0_1{S5

_ ~~ !] 3 ]

PT/UT

_ Si 0298'-lC 3 [ ~ B5.10 ((___[B'_F[_ _

I l l

RV RC-09 SE i3 PT/UT i ISI-0298-C-3 B5.10 l

B-F

))RVL ))_ ' RC-17jSE_

.l 3_ j [PT/UTl [' [ISI-0298-C 3

~ B5.iO ][~]B F i~

J 7~

.. RV, [

_ RC-0B SE_

RC-25 SE 3.j PT/UT _,

ISI-0298-C-3 B5.10_

j__

__B-F

_..._. RV _ [

.RC-_16_SE _ ___ _ _ _

. _3 _ j_ PT/UT_ ; _ _ ISI _0298.C-3

_ B 5.10 _ j__ ____B F_ ____.

_ _..RV__ L 3__ [ PT/UT ISI-02_98-C-3

. _ _ B5.10_ j_

_ B-F_ _

, B5.10 _i

_RV_ __ j. _

RC-24-SE _

j __ 3

_ PT/_UT_ ;.lSl-0298 C-3_ {

B-F BF PZR ~' i '

'RCW-24-SE I

~1

' PT/UT I ISI-0396-C-1 B530 RV RC 32-SE 3

i PT/UT ISI-0298-C-3 B5.10 t

~ ~ ~ ^ ~

~ ~ ~ ^

BF ~ ~ ~

1

~~PZR~ ~ [ ~ 'RCW-29-SE

~ ' ~ I PT/UT~ i ~lSI-0396'-C-1 B550

~I

~

~^

~1~~~

1 BF

[PZR' ~ [

RCW 25 SE[

}~~2 ~ ]

PT/UT

. lSi-0396-C-1

[ ~ ~ ' B5.40[ ~ ~ ~

B-F i 1 PZR RCW 26 SE

.;. 2 PT/UT ISI-0396-C-1 j

B5.40

[

B-F_ __.

)

PZR_

R

_ CW 27-SE L 3 j

PT/UT.

_lSI-0396-C-1_

[

,85.40

.PZR RCW 28-SE 1

3

{

PT/UT j ISI-0396-C-1_!

B5.40_

[

_ B-F

.B F

_- _ SG _. _

-.RC-03 SE.

1

_ RC-02-SE __

j 1_

PT/UT { lSI-0401-C-1

__85.70 B-F

_ B5.70

- SG..

PT/UT.

ISI-0401. -C-1

-.._._ _ B F. _

4_

_q.

SG RC-18-SE i

2 PT/UT ~

ISI-0401 -C-1 B5.70 B-F

((SG ~~ 4

_SG j_

_ RC-26;SE_ _

[

3_ f PT/UT' [ 'lSI-0401 C__1. ][ _ B5.70 ][']B F[_.

RC(19 SE[ [ 3

~

i~

. T/UT j ISI-0401-C-1 4 __ _ B5.70 i

B-F P

j

_. _ RV. ! _ _ _ _ RC-27 SE _ _._

_3 PT/UT SG

[ _ ISI 040_1-C 1_ n B5.70 __L

_ B-F 7

i

_RVNUT-(1-18) 1 1

MT ISI-0304-C 1 B6.10 B-G-1

[

ISI-0304-C-1'

~ "RV

~RVNUTd19-36)[

i 2

RV RVNUT-(37 54) 3 MT ISI-0304-C-1 B6.10 _

[_[B-G-1

~

~

j I

B6.iO MT B-G-1

]\\I }

RVSTUD_-(i-i8)

'1

j. MT/UT~ [ 'iSI-0304-C-1 B6.30}

[

_ B-G-1 B-G-i RV RVSTUD-(19 36) 2 MT/UT i ISI-0304-C-1 B6.30

^ ~RVSTUD]37-54)

[

3 ~

~ MT/UT '

iSI 0304-C-1

[

B6.30 ~

~B-G i~~ ~

_[RV}

_ _ RVTHREAD-(1 18) j 1

UT ISI-0304-C-1 B6.40 BG1 RV

. _ RV_.

_2 UT ISI-0304-C-1_.

RV

__RVTHREAD-(19 3_6).

3 UT ISI-0304-C-1 B6.40

. -G 1 B

l B6.40 RV ~

RVTHREAD-(37-54)

~ [

VT-1 ISI-0304-C-1 B6.50 ~

B-G l' i

B-G-1 RVW SHER-(1-18) ' ~

'1 i

RV

~~RVWASHER i19-36) 2 VT 1 ISI-0304 C-1 B6.50 t

B-G-1

^

i

~

^

^

RV ~

RVWASHER-(37 5'4) 3 VT-1 i

Ist-0304 C-1 B6.50

' B-G-1 2 MWCB j0616) 2 ~ i~ ' VT-1~~

! ~ ISt-0396-C 1

' B 7 20 ~

'B-G-2 1

i i

PZR i

~

SG ~

MWCB-2-6(1 16)-H

~

VT-1 ' :

iSI-0401 C-1

~B7.30

~

~~B-G 2 1

l MWCB 2-i-(1-16)I.C

[

~3

[

VT-1 ISi 0401-C-1

[

' B7.30

[.

'. B-G[2 i SG _ [

~

1 CVCS CVC-1057 BC 1

l VT-1

! MSG-0008 C-1 B7.50 l

B-G 2 CVCS' CVC-1091 BC~

2 VT-1 MSG-0008-C-2 i 87.50 B-G-2

~

"~

2 U2RAlJCG.XLS 8/28/96

I SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL 1

SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUM E

- N MBER CATEGORY CVCS CVC-1169-BC 3

VT-1 MSG-0008-C-4 B7.50 B-G-2 i

i

" CVCS

I~'~'

CVC-i~236 BC ~~ $

3' l

VT-1 ' ' ' MSG-0008-C 5 7 87.50

B-G-2

~

T

~ 'C S " I ~ ~ ~RCF-27 BC

'l 1

I VT 1

$ ' lSi-0013-C-3 ' I ~" B7.50 '

I R

~

~ T :2

~

BG RCS

~~

RCF-94-BC~~ ~ ~ ' j[

~~

F-31 BC 2

vT-1 i

ISi-0013-C-3 ~i~

B7.50 ~ ~ ' ~ 'B-G-2

~~

~

~

~

2 ~ T~ 'VT 1 1 ' ISI-0013-C-3 B7.50 T

" ~ ^ - ~

~ ~ ~

8 G-2~

~

l

!~

. _ [ _ _-0013-C 3} [

_[B7.50~ [~_ ~B;G{2}

_.RCS__ n

~ jCF-74[B.C[~

[ _3 ] _ VT-1 ISI i

VT-1

__.RCS.

RCF-107-BC

'3 ISI-0013 C-3 i

B7.50 B-G-2

-~ Si-1 f48:BC

~i

~1 i ' ~ vT-1~ !

iSi:0602-b:8 87.50

- ~ ~

~ ~ ~

~ ^ :2 B-G

~~ SIS ~i-Si-I848 Bb ~ ~ ~ ~ i

'2 i ~ ' VT-1 i

~

fT ~i

~B7.50~

~' ~" B G-2 lSI-0002 C 9 i

[ Sij1l870 BC

. { } 3 T [VT-[if { lSl-0002-C_10 i __B7.50 __ i__ _B;G.2_

SIS

_... SIS. _ _ L _ _ SI.~1926-BC _ __ i 3 VT-1, j lSI-0002-C-11_

_87.50_

{

___B,-_G-2 B-_G_-2 _ _

_ _ SIS. k 63-623 BC, j

_1 j _ VT-1..

l _ iSI:0002:C-6 [

B7.70__j

_ CjCS [

___CVCF 214 ISi-0009-C-2~ ;

B7.70 B-G-2.

RHRS 63-640-BC 1

VT-1 ISI-0003-C-5 7.

89.2i ~

~

s

)

CVCS CVCF-212.

.{_[1_

.PT.

ISI:0009-C-2 B9.21

[B-i[ _

1 PT I

._ B-J i

-~~CVDS CVCS-369 1

PT ISI-0009 C-2 B9.21 B-J 1

_..CVCS].

~CVCSj376

.[

~1 ~{

PT ISI-0009 C-2 I~

' B9.21 i

'BJ J

CVCS CVCF-211 A 1

PT ISI-0009-C-2 ' 'I B9.21 1

~B-J 4

' 'CVC S '

~ CVCF-24'4E 2 ~ I PT i ISI-0009 C-2

' ~ 89.2i

' I ~

B'-J

~*

]

[CV'CS] {}_ ] CVCF 244F 2

PT._

ISh0009-C;_2] _ B9 2i _

~

I 2

PT

~IBJ ~~

CVCF-244G ISI-0009 C-2 I

B9.21.

B-J j

_ CVCS_.

CVCS____

__ _VCF:246A__

2 PT C

SI-0009-C-2

! _ 89.21 I

B-J PT lS'l-0009-C-2, [_ _89.21

_ _ _ _Bi _ __ _ _ _

_.CVCS 4 _ _CVCF-2_44D _ _ _

2 PT_ j __ISI:0009-C-2

_CVCS _L _

CVCF-244C 3

g _ B9. 21_ _ _

__.B-J _ _

CVCS L _ _ CVCF-244B

[

~3 PT

_ISI-0009;C 2___ 1 89.21

_ _ B-J _ _

CVCS_

__ CVCS 412 i

3 i

PT _

t i

~{

ISI-0009-C-2 1

89.21 B-J 1

4 I

^CVCS N ~~

CV'CS]((

C 'CF;244[ } }{ [3 [ [

~PT' i

ISI-0009 C-2~l~

~B9.21 ~ 7 ~~BU~

~

^

CVdF-24dA

~3

~

~

~ ISI-0009 C-2[ '_B9.21 [~[ ]B[ ~ ~

PT

^

~-

CVCS.i _

CVCF-2428_ _.i __

PT t

ISI-0009-C 2

.B 9. 21._

B-J 3

...m_

_CVCS~

[CVC-1019_ _ _ _ ~

CVCS :

CVC-1020 1 _ l

'PT MSG-0008'-C-1 { ~ ]B9.40 __

~B_-J 1

PT.

89.40 B-J MSG-0008-C-1 1

i

^l

~ CVC-1030' 1

PT MSG-0008-C 1'2~'

89.40

~~ CVCS

~

~

~

I BJ

~~

- CVCS i' ~ CVC-1027 1

~

PT l

MSG-0 08-C-1,

B9.40 I'

BT

[

_ CVC-1029 1

[

PT MSG-0008-C-1[ lB9]40 -[

~ [B,J] _ _

CVCS CVCS CVC-1118 _

1 PT MSG-0008-C-2 B9.40 B-J

~CVCS CVC-1119 I

1 PT ~

I MSG-0008-C-2'

'89.40 '

l BU CVCS.

CVC-1121 __

{

1

' _ PT.

! MSG-0008-C-2[.

.[B9.40 i_

Bf ]

CVCS

[ CVC-1120~

~

1 PT

. MSG-0008-C 2 '

B9.40 B-J 1

CVCS ~ ~I' CVC-1128

'I 1

i PT

! MSG-0008 C-2

~

2

~ 89.40 B'J

~CvCS t CVC-1129 ' ~

l

~1 PT IMSG-0008 C'2

~B9.40 i{

~PT' MSG 0008'C 4 !

~B9.4 ~T

~'

~ ~ J~ ~ ~ ~

BJ

[CVCS][ ~ -[.CVC 1153[ ~ ~ j ~ [1 1

l

~

~O

~

B CVCS i CVC-1154 1

PT i MSG 0008-C-4,

B9.40 i

BJ

'~dV[CS

_((CVC-li_55[ d' '1._

PT i

PT MSG-0608{C_-4[ '89.40

_L _ _ B J _ _ _ _

CVCS I CVC-1164 i

1 MSG-0008-C-4 B9.40 B-J t

CVCS' T~'

~ CVC-1242 '

1 PT MSG-0008 C-5 I B9.40

~ BO' CVCS'

' CVC-1157 1'

PT MSG-0008-C-4 B9.4

~

B-J CVCS I CVC-1243 1

PT MSG-0008-C-5 89.40 B-J

~

CVCS CVC-1244 1

PT MSG-0008-C 5 89.40 B-J 3

U2RAUCG.XLS 8/28/96

]

I SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL SYSTEM' IDENTIFIC ON NUMBER PERIOD METHOD NUMBE

. N M ER CATEGORY l

CVCS L

_ _ _CVC-1065, _

, ;2 PT.

MSG-0008-C-2,

B9.40 B:J CVCS !

CVC-1067 2

i PT

! MSG-0008-C-2 B9.40 B-J

~CVCS l

~CVC-1D68 2

i PT MSG-0008-C-2 i B9.40 ' ~ * ~~ BT~

CVCS((

[~CVC 1070[

[

'2

.PT

[ MSG 0008-C 2l [

B940] __ [

_ Bi L

CVCS CVC-1071 2

l PT MSG-0008-C 2 i B9.40 B-J

[CVCS]~

[CVC-1'O'72]

[

2 PT

[

[ ~ MSG-D008-C-2 l ~B9.40 PT MSG-0008 C-2 89.40

_ B-J _

_CVCS _[

CVC 1074 2

B-J J

CVCS '

CVC-1093 2

PT

' ' MSG-0008-C-2 B9.40 '

'B-J CVCS CVC-12T4~

^

' MSG-0008 C-3

' B9.40

' B-J 2

PT

~ I'

~ CVC-1215 2

l

~ PT MSG-0008-C 3 '

B9.40 CVCS J

BJ 4

CVCS

~

[CVC 1217~

~ __ 2 PT MSG-0008-C-3 {

B9.40

[

B-lJ CVCS.

CVC-1218 _

2 PT MSG-0008-C-3.

B9.40 B-J CVCS l

_ CVC-1224 _

2l,

PT

~ M SG'-0008-C-3 B9.40

' ~

_ -T B

._CVCS_,

_CVC-1225.

_2 _ ;

PT

__ MSG-0008_C-3. ! _

B9.40_

B-J CVCS CVC-1262 2

PT MSG-0008 C-5,

B9.40 B-J__

CVCS~i

~

~

~ ' ~

'~T

'2 i

PT

" MSG-0008-C-5 l 89.40 ^ ~ i ' ~ ' BJ CVC-1263

~CVCS CVC-i 264

  • '2 I

PT MSG-00 8 C 5?1T 89.40 ' I

^

B T~

I CU~CS CVC 1265' I

'~2 l

PT '

i T

MSG 0008'-C-5~

~ B'9.'46 ~ 7

~ BT T

~ CVCS~

~ ~CVC-i 271' ~ ~

' ~ 2 ' l~

'PT' l' MSG-0008-C-5

~

89.40 B-J

~ CVCS ~

CVC-i272 2

I'

~ PT

~

{ ' MSG 0008-C-5

~ B9.4 ~~~I

^

~~~!T

~

B

} _ _~ ((CyC[-l1[048[

. [,_ ~ 3]~

MSG-0DD8-C-1[ ' [ 89.40[))~]B-((

l

~ ' ~CVCS PT CVCS

_ CVCy1.049__

i

_3 PT M SG-0008-C-1 B9.40

{

8 J_

j 7

CVCS _ _ _

CVC-1050 3

PT _

. 89.40 BJ

, MSG 0008-C 1 i CVCS~ i~

~

^

CVC-1052 3

PT' F MSG 0008-C 1'~

89.40 i

' ~ 'J B-

CVCS. [~

2 MSG-0008-C-1 [

B9MO _ ", ~

BJ CVC 1_053

'3[

PT.

CVCS CVC-1059 3

PT l MSG-0008-C-1 B9.40 B-J

[_

'CVCS T

CVCS i CVC-1080.

[ j

_3

[PT

' MSG-0008-C-2 [

__ B9.40 BJ CVC 1079 B9.40 _[_

._ _ B J 3

PT MSG-0008-C-2

[

PT' MSG 0008-C-2'~[ 89.40] _ (( lBQ CVCS CVC-10'87 3

B9.40 B-J CVCS CVC;1088 3

PT MSG-0008-C-2 ;

_ B9.40 B-J CVCS CVC 1089 3

PT MSG-0008-C-2 '

CvCS_ [

'CVC 1239 3

PT

' MSG-0008-C 5 89.40 CVCS B_J 7

_ 89.40.

CvC-1240 3

PT

, MSG-0008-C-5 B-J CVCS.}_

CVC 1246 3~

{

PT MSG-0008-C 5.;

'B930 _}

i

~

_ _ [J B

CVCS '

_CVC-1247 3

PT MSG-0008 C-5 :

B9.40 BJ

^

~

'3' PT MSG-000'8-Ci5 ^ ' ~ ' B9.40~

I BT

-~CVCS

~~CVC-125O ~

'~

~

CVCS' CVC-1251[

{3

[_

PT

~

. SG-0008 C 5,

' B9.40

[ __ B}~.l M

JI CVCS CVC-1254 3

PT MSG-0008-C-5 '

89.40 BJ_

i CVCS.

CVC-1255 3

PT' MSG-0008-C-5 B9.40 '

f ~ ~ ~~ B-J ^

CVCS

~

CVC-1258

~3 PT I

MSG OOO8-C-5 B9.40'

~~BJ RX' ~ '

' RC-04'-S1 1

PT/UT ISI-0008-C-1 l

~B9.11 ' ~

BJ

^

~

'~

RX RC-05 S1 1

PT/UT ISI-0008-C-1 89.11

_[

Bd RX RC-06 1.

PT/UT ISI-0008-C-1 89.11 BJ

~~~RX

~$

RC 07 1

PT/UT ISI 0008-C-1 89.11 B-J

'X RC-09-S2 ~

R 2

PT/UT ISI-0008-C-1 B9.11 '

Bd~~

RX~

RC 10 2

PT/UT ISl-0008 C-1 '

B9.1'1 BJ RX RC 11 2

PT/UT ISI 0008-C-1 B9.11 BJ RX RC-12 2

PT/UT ISI-0008-C-1 B9.11

~

BJ RX RC-07-S1 3

PT/UT ist-0008 C-1 B9.11 B-J RX RC-07-S 2 3

PT/UT ISI 0008-C-1 B9.11 BJ 4

U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT l

UNIT 2 SECOND INTERVAL y

SYSTEM IDENTIFIC ON NUMBER PERIOD WETHOD NUM E N M ER CAT GORY RX RC-05 1

3

^

PT/UT ISI-0008-C-1 B9.1'1 B-J t

PT/UT ISI-0008-C 1 89.11 J

i

~ RC-25-S1 3

RX'

' ~ ~ RX RCW:22 (Br'. Conn.)

~

~

2 PT/UT ISI-0008-C-i 89.31 B-J

[RX~

}2-TE-68 024 (Br. Conn.)'

2 _{

PT ISI-0008' C-2

[_

~

^

B9.32

[

[B J 7

RX _

. _2 TE-68 065 (Br._ Conn.)

3 PT ISI-0008-C 2 B9.32 B-J RX.

2-TE-68 018 (Br. Conn) 1 PT ISI-0008-C 2 B9.32 1

~lBJ RCS' RCS-O'49

'1 ' ' ' PT/UT ~!

ISI-0013 C 1T2~ !

89.11 iBJ i

~ ' RC S'

^~

_[RCS},

~~ RCS-040 1

PT/UT ISI-0013-C-1 B9'.11

~B-J

~RCF-16~

~ ~ ~

1 PT/OT '

  • ISI-0013 C 1 B9.'11 ((~ B[

~*

2l l

j

_._RCS_

_ _ _RCS;031 1

L _ PT/_UT. ;

. SI-0013 C _1 j_

B9.11 _ [ __B:J _ _

f RCS i

RCS-032 1

PT/UT ISI 0013 C-1 i

B9.11 l

B)

[RCS~ }][][RCS;047} _

.[ [2

[PT/OT I "lSI-0013 C-1I ~ -~ ~I ' ~ ~ B971 i ~ T B-J

____CS_ j _ _ _RCS-048

[-2 _j _PT/UT ; ISl;0013 C-1 _,!.

.89.11

[ _ _ _ B-J _

R 7

RCS RCF-84 1

2 PT/UT !

ISI-0013-C-1 B9.11 B-J.

l RCS]~

[R[CS O43[

'((

2

} ' PT/UT ]

ISl[00'13 C(1.[ } _B9._11

_1

_ B-J_ _ _

i i

RCS RCF 16_A

._3.

.;_ PT/UT j_ _. SI _0013-C-1 7

2 ISI _0013-C-1

_ _B9,11_ _ _ ( _B-J_

t RCS -,i..

7

-. B9.11

. B-_J 2

l PT/UT ;

I RCS-044 RCS l~~

~

<j

_RC'S ' [_

'~ RCS-101 ~

[ '~3[ [ PTlUT [ ~ lSI-0013-C-3 { __ [ B9.1 UPIF 2225 ~

3' IS10318'-C-1' 1

~

'I PT'OT 2

89.11

~T

~

/

B-RCS~ 'I

' - ~

~ jJ[i B

RCS-089

_3

_j PT/UT.

ISI 0013-C-3_ _ [,_ 89.11

_ B-J_

RCS, RCS-069_

j_ 3 PT/UT ISI-0013-_C-3 _, _

9.1 1 i

_ B-J 8

RCS RCS-051 3

PT/UT I

ISI-0013 C 3 B9.1_1

._ B-J 7

B-J RCS i

RCF-13 l

3 PT/UT.

ISI-0013 C-1 B9.11 i

._RCS ~[

RCF:62A_

{

_1

[

ISI-0008_C-3.

B9.21 B-J PT B9.2i IBJ RCS l [RCS}_j ~~ RCF-83A 1 PT ISI-0008-C 3 i i _[ 'PT (( ' ISI-0008-[C-3 ' [ B9.21} [_] ~ }~[B T ' ~ RCF 69A[ _ '~2 ..._ RCS._{ _ CS-30E_

_ 3._

j PT ISI-0013;C-3 [ R _ 9.21 B-J _. B RCS i RCF-76A 3 i PT ISt-0008-C-3 B9.21 B-J R' W{i4]Br'.[ Con [n )} { _ { PT/UT ~ [ 'lSI-0013 C-1~ [ _ B9.31] ((B J[~] C 3 RCS_ 1 __RCS._ _ _R_CW-08 (B_r. Conn.)] _ 2_ _ PT. j ISI 0008-C-3_ _ i _ _ B 9. 3_2 _ _ 4 B-J__ ..RCS_ j _ RCW-02 (Br._ Conn.) 1 _ PT_ [ ISI-0008 C-3 _ i _B9.32 .i 7 B-J RCS RCW-03 (Br. Conn.) i 3 PT ISt-0008-C-3 j _ B9.32 B-J i RCS RC-1477-1 1 PT ISI-0008-C 3 i B9.40 i B-J RCS ~ ^ ~ 'C 1'477 A ~ I '1~ l~ ?T I ISI-00'08-C-3 ' i ' ~ 89.40 ' R J ? ~ J' B RCS. ~[ ...RCj1618. 1 PT ISI-0013-C-2 ] B9.40~ .B-J g RCS RC-1619 1 PT. ISI-0013-C-2 89.40 B-J RC 1620 ~ ~ ~ RCS' ~ ~ 2 1 RCS .~ 'RC-1621 ~1 ^ PT I ISI-0013-C-2 B9.40 ' ~'B-J ~' PT ISI-0013-C-2 'B9AO ~ ' B-J RCS I RC-1234-1 2' PT ISI-0008-C-3 39.40 B-J ~ ~ ~ '~ RCS RC 1234 A 2 PT ISI 0008 C-3 I B930" B-J J RCS' RC-i43i 1 2 PT ISI-0008-C-3~I ~B9MO ~ B'-J ^ ~ RCS [ 2 RC 1465-1 2 PT ISI 0008 C'-3' i B9.40 B-J RCS I ' R'C;1476 1 2 I ~ PT ISI-0008-C-3 89'.40 ^ ~d B _f PT ISI 0013-C-2 B9.40 ' B-J RCS RC-1643 2 RCS l ' RC-1606-1 3 i PT ISI-0008-C-3 i 89.40 ^ ~ B-J RCS RC-15951 l 3 FT' ' ISI-0008-C-3 i B9.40 I ~B-J RCS~ ^ RC 16i7-1' ~ ] _3_ { PT_ ~ ISt-0008-C-3 [ B9.40 ]B{J[ i RCS. _, RC_-_162 5 3 PT ISI-0013-C 2 B9._40. __BJ 3 RCS RC-1626 3 PT ISI-0013-C-2 B9.40 B-J 5 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL

  1. O ISOMETRIC ITEM CODE SYSTEM IDENTIFICATION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY RCS RC-1627 3

PT ISl-0013-C-2 B9.40 B-J ~ ~ [ '1 ] PT/UT. { ' ISI-0003-C-5 i _RhRS[ i _ _ _ RHRSj211_ j _ _1 [ PT/UT ISI-0003-C-5 B9.11 _ j _ B-J __ B9.1_1 _B-_J .RHRS ( _ _ RHRS 208 ISI 0003-_C,7 _ ; __ _B9.11_ j _ B_-J _ _ RHRS_(__ . RHRF_-087 _

_ 1_

[ PT/UT RHRS L RHRF-106A 1 PT/UT [ lSI 0003-_C:6 _[ 89.11 _ j_ _ _B _J_ ___ RHRS_ RHRF-088 2 PT/UT ISI-0003-C-7 l 89.11 B-J i ~~RH.RS'T. - -. - ~RHRS-165~~ i 72' I ~ PT/UT^ ", ISI-0 03-C 7 ~l ~ B9.1'1 l.'.~'~~BJI~~' ~ ~ 1 - p 7 g q.. gg -j g ~ ~ ' ~RHRS[ (( ~ [RSRF-109-~~~j~~3~ [ 'PT/UT [ ISI-0003-C_-6 ]' [B9.i[1] _ 5[J ~ _.RHRS _., RHRS 189 _3_ ,, PT/UT__ . SI-0003 C.6 j_ B9.11.g _ _B J _ 3 l PT/UT l _RHRS. . RHRS-190 ISI-0003-C_-6 {_ B9.11 B-J RHRS ; _RHRS-16_7__ _ PT/UT ; _ B9.31 3 . PT/UT _ ISI-0003-C _7 . B9.1 1_ _ _ _B-J_ _ g __RHRS, _,RHR)V-03_ (B_r. Conn.)_,_ .2 ISI-0003-C-7 B _-J_ RHRS ; SIS-183C (Br. Conn.)., .PT ISI-0003-C-8 89.32 1 t B-J ]RHRS [ [ ~~ ~ [SI-2123' ', [ 1__ _ _[ _PT ISI-0003-C-8 ~{ ISI-0003 C-8 B930 { ~ _ _B J ~~ PT 7 RHRS [ Sl;2117 L2 B9.40 _ B-J _ 89.40_ 4 . RHRS SI-2118 2 PT ISI-0003-C-8 B-J g l _j_ [st-2119[ [ 3 j PT ISI-0003 C-8 j B9 40 _ _1 _ B-J J RHRS 3. PT _ _ RHRS_, _ __ _ SI2120_. _., _ _ _ PT/UT ISI-0002-C-4. __89.11 B-J ISl-000_3:C-8 B9.40 _ _ B:J____ 4 SIS i SIS-252 1 -~ sis T ~ ' sis.253~ ~((1 [ PT/UT ~lSI-DOO2-C-4[ [ [B9d1]_]{]B(( __ SIS 1.__ SIF-146 1 l. PT/UT ISI-000_2-C-5 j _ _B9.11_{ _B-J _4 ._ SIS _ L _ _._._ SIF _193. _ _ 3 1_

_PT/UT

ISI-G')02-C-7 _ _ B9_.1_1 _i _ B-J _ __ _ J 1 SIS SIS-237 1 PT/UT ISl 0002-C 5 B9.11 i B-J SIS SIS 274 1 i PT/UT I ISI-0002-C-6 89.11 BJ SIS ~ ['~~ SIF-i47 $~~ 2 ~ I ~ PT/UT ISI-0002 C'-5~ ' ! ' ~ ~ B9.11 I~ BT ~ i SIS' ' I ' ~ ~ ~ ~ SIF-i'29 [ '2 [ PT/UT. [ ISI-00d2-C-4 [ 'B9.1[1))_[s f ~ ~ SIS SIF-196 i 2 PT/UT ; ISI-0002-C-7 i B9.11 i B-J i ((SlS[ { ~ SIS-[246[ ~ ~ [~ ~ ' ] ~ DUT[ { 2 P ISI-0002-C-4 I-~ ~ 89]11' ~ ] [ [B{J ~~ ~ . _ SIS SIS _ - _ SIF-185_ _ _,2 [ _PT_/UT_, ISI-0002-Cy6 g B _J. 4 89 11 B9.11 B-J_ SIF-186 l 2 PT/UT ISI-0002-C-6 ~~ ~~ SIS [ ] ~' [SIF-242][ ~ !2 _PT/UT ISI-0002:C-6. B9.51_ [ ~ ' . B-J ~ PT/UT ISI-0002-C-5 SIS [ . SIS-276 1 3 B9.11 B-J SIS SIF-145 A 3 PT/UT ; ISI-0002-C-5 _ _B 9.1 1_ B:J_ __ SIS SIF-130 . 3 PT/UT ISI-0002-C-4_ B9.11 j. .B y _ _ _ 1 . SIS-301 3 L, PT/UT ISI-0002-C-6 i B9.11 B-J _ SIS. _ SIS 302_ J _ SI 0002-C-6_ [ _89.11 _.B J_. j l l SIS 3 j. PT/UT SIS SIS 291 J 3 PT/UT ISI-0002 C-6 B9.11_ B-J [ SIS. [ SIS-323_. j __ _1 ~ . 'PT. SIF-202 i 1 PT ISI-0002-C-7 ) __B 9.2_1 ' (( ~ ~[ B J _ ISI-0 02-C-7 g SIS j ISI-0002 C:7 [ 89.21, [ ~ ~s-~J~~ l 89.21 B-J 4 [ sis [ ][ [ sis-)25[ ~ 1 PT J . __ SIS SlS-326, l 2 j PT { _ SI-0002-C;7 I B9_.21 _ _ g _J B 7 SIS SIS-328 l 2 PT ISI-0002-C-7 i B9.21 l B-J Sis [ (( ~[SISf329 '2 ,I 'PT ' { ~ 1S1-00 2{C-7[ } [s9.21[ [ [s[J[ ~ _ SIS ~ SIF-203 _ 2 i PT ISI-0002-C-7 j _ _ B9.21 B-J SIS SIS-330 3 I. PT ISI-0002-C-7 B9.21 B-J _ SIS SIF-205 3 ~ PT ISI-0002-C-7 B9.21 ' " ~B-J'~ SIS SI-18'70 (Butt Weld)' 3 PT ' ISI 0002-C-10 89.21 B-J SIS SIW-08 (Br. Conn.) 3 PT/UT ISI-0002-C-4 89.31 ~ B-J 6 U2RAUCG.XLS 8/28/96

l l SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL NUMBEf ' SYSTEM IDENTIFICA ON NUMBER PERIOD ' METHOD 'N MBER TEGORY _.. SIS _ j _ _ SIW-07 (Br._ Conn.)

1_
PT/UT !

ISI-_OOO2-C-5

_ _ B9.31 _ j _ _ _ B _J SIS SIS-282A (Br. Conn.).

2 PT i ISI-0002-C-6 89.32 B-J } '~ ' sis}27_3A'(B{ Conn.)[ 3' ~ [ PT. ~ _.iSI-0002-C-6 ~ * ~ ~ ~ ~ I ~^ ~ 89.32 BJ ~ J SIS 1 PT l _ SIS _ J_ SlW-03 (Br. Conn.)_ SIS Sl1128 1 PT ' ISI-0002-C 10 _ g. B9.32_ _ [ _ _ By ISI-0002-C-8 i B9.40 B-J [ lSI-0002 [C-8[{_ ~B9.40 ] _ [BJ ~ . _ sis _ SI_1i29[ _ ] [ ~ 1 PT 1 ~~ SIS SI-1124 1 PT ISi-0002-C-8 89.40 B-J Sl1125 ~ 1 PT ISI-0002-C-8 N~ 8930' 7 ~'B-J Sis ~ ~~~ 1 I PT ISI-0002-C-8 ~ I ~ B9.40 7 B-J ^ ~ ~ ~ ~ SIS' i ~ ~ Sj1'126 ~

  • ~

Si1892' ~~ I PT ISI-0002-C 10 B9.40 ~ B-T SIS ~ l 1 SIS SI-_1888 [ [ l 89.40 [ _ B(( ~~ [SI _1890 ' 1~ PT ISI-0002-C-10 SIS. 1 3 _ _ SIS.. [_..__ __ SI'l909_ _ j 1. j PT_ ISI-0002-_C-10_;_. 89.40 4 B-J _ 1 l _ PT _ ISI-0002-C-11 _( B9.40 _ _; B-J . PT_

.lSI-0002;C-11 L

_ _ SIS _ __ _ _SI-1911_ __j_ _.1 j PT._ ; ISI-0002,C-11 _ ), _ _ __B9.40 _ { BJ. _ 1 SIS 89.40_ ]___BJBJ__ SIS _ _ _ _ SI:1912 3 _. PT_ ISI-0002-C-12 : B9.40 SI1946 1 _.. SIS _. l _ _ _ __ SI-1947C j 1 .[_ PT. j ISl;0_002-C 12 _ L_ B9 40_L__ _B-J _ SI1947,

_ _ 1_

j _PT S_lS SI-1815 l 2 l PT. [ _I_SI-_0002 _C-12. ._B9 40_ Q._ _ __B J_ _ _ _ 7 SIS t ISI-0002-C-9 B9.40 B-J _ sis _ S_181'/A(([ 2} j PT[ iS[0002-C-9 _ _ SIS. d _ _ _ SI 1819 __ _ _ _ _ _..j PT. ISI-0002-C-9 ._B9.40_ _ _ ___ B:J_ _ 7 2 B9.40_ _ _ _By _ ISI-0002-C-9 _ _B_9.40 J _ _ _B;J_ _ _.SlS _ d.. _. SI'l. 818 A _ _ _ ] _ _2 PT 1 _ISt-0002-C-1189.40 i B-J SIS SI1899 _ 2 i PT SIS SI-1900 2 PT I ISI-0002-C-11 89.40 ^ B-J ~ ~' ^ SIS 'SI1902A 2 'PT ~ lSl 0002-C-11 B9.40 ~ ' J Bi [_~ ~ Sl;[1915 2 ^ _.__SI S. L _ _ _. SI.-l S16 2 _ [ 'PT ISi-0002;C-11_ ; _[B930[ ~ ~ ' B[ _ SIS SI. PT _, ISI-0002,C-1_1. ; . B 9.40_ _ ; _ _ _ _ _B-J _ _ _._. S. _ _Sld Sl 7 2 PT ISI-0002-C-_11__ _ _89.40 _ _ ;._ _ B-J_ a SIS. SI-1918 2 PT ISt-0002-C-11 B9.40 B-J " SIS ~ ~ SI-i821 ~ 2 ' ' PT i ISiJ0002-C-9 " ~ ~B930~~ ~l ~ ~~ B f ~ i (( SIS ' [ ~ ~ SI1824 '2' I ? (( B9.40_ [ [B _J~ ~ ~ PT ISi10002-C-9 Sl1825 2 ~ I PT l lSI-0002-C-9 i B9AO BJ SIS PT __ lSI-0002-C-9 _ f ~ }B9.40[ } ~ ~ [B-[J~ {. [ SIS _ [ S_l-1827 I 2 SI-1829 3 _ PT [ ISI-0002-C-9 j _ B9.40 4_ _ SIS _SI-1830 3 PT ISI-0002 C-9 B9.40 B-J B-J SIS ~ i _ i~ sis ((}~ [SI-1831 )_3 [ ' PT ' } _ ISI-0002-Cf-9 { _[B9(40 ~ [ ~ [B{J[ SIS I Sl-1832 .3 PT ISI-0002-C-9 i B9.40 B-J i S S.. SI'_18_49[ ~ [3[ { PT~ ] iSl;00_02_C{9 )) [B5JO__]}[~ [B-{}_ _ _. SIS. i _ _ _. Sl;1851. . 3 PT ISI-0002 C-9 B9.40 _ B-J 3 i PT l _ lSI-_0002 C-9 j __ _ B9.40 J _B-J SI1850_ _ _ _3 PT ISI-0002-C-9 L 89.40 .J B-J .S.IS._L SI-1852 SIS sis SI-1855 3 PT ISI-0002-C-9~ i B9.40 ' B-J SIS' ~I SI-1856 ~ 3' ^ PT ISI-0002-C-9 ~B9.40 B-J ' sis ~ l SI-i 885 3 I PT ISI-0002-C-10 B9.40 ~B-J ^ SIS ~~ i ~ SI-1867 ~ 3 ~$ PT '~lSI 0002-C-10 ~ B9.40 I B-J ^ SIS' SI1868 3 'PT ISI-0002-C-10 B930 I B-J ~ I ~ SIS SI-i 869 3 PT ISI-0002-C-10 B9.40 ~ ~ ~~B-J SIS ' 63-623 1 VT-3 ' ISI-0002 C-6 t B12.50 ' ~~ B-M-2 RHRS~ ' [ VT-3 ~ ISI-0003-C-5 B12.50 ' B-IVi-2 63 640 1 RV RPV-INT ,1, 2,& 3 VT-3 ISI-0298-C-2 B13.10 B-N 1 7 U1RAUCG.XLS 8/28/96

1 i SEQUOYAH NUCLEAR PLANT UNIT 2 SECONDINTERVAL SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUM E N M ER CATEGORY RV RPVSUPST i 3 VT-3 ISI-0298-C 2 B13.70 B-N-3 .RCS[ '; [ ~ [CRDW-62 ~ ~* ,I ~ ~ ~ B - ~ 3 OT ISI-0097 C-1_ _ B14.10 B14.10 i7 _ CRDW-66 3 UT ISI-0097-C-1 _ B-0 i i i J 1 e i a i i 1 8 U2 RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyygE N M ER CATEGORY CLASS 1 - EQUIPMENT SUPPORTS RV' RVH-1 3 VT-3 l lSI-0298-C-4 ' F130 I' F-A i PZR i ~' PZRH 1 2 VT-3 ~lSI-0396-C 1 F1.40' I FA 2 PZR ' PZRH-2 ~ '~ 2 VT-3 ISI-0396-C-1~ !~ ' F i '.40' F- ~ ~ I SG' 'l ~~~S G'H-1 -2 3 'VT-3 ISI-0401-C 2 ~ F F130 ~- [ ~ ~ F A[ ^^ [ 'F1.40 _ _- A _ RCPH1' 1 ~' T-3 ' ISI-0326-C-1 RCP V F i INTEGRAL; ATTACHMENTS ' i r 1 PZFi ~ 'RCWO3 2 'UT ~ iSI-0396-C-1 ' Y ~ B10.10' B-K" ~ ~ PZ R'. '.PZRH-2 I ~~ ~^ 3 MT ISI' 0396-C-1 [' ~ B10'.10~~', ~ B_-lK ^ -. _ggg gCPH-1-1 1 PT ISI-0326-C B10.30 t B-K RV RV'I A-1 3 VT-3 ISI-0298-C-3' B13.60 ~B-N-2' ~ ^ ~ RV RVIA-2 3 VT-3 ' ISI-0298-C-3 ' ~B13.60 i ~~ B-N 2 ' RV~ ^ ~ RVIA' 3 ~ 3 ' VT-3 ~ ISI-0298 C-3 B13.'60 B-N 2 ^ T ~ RV' _RVIA-4 __ _ ] '3 ~ 1 VT-3 [ ISI-0298-C-3[ ! B13.60' [ _]B A 2 ~ i RV RVIA-5 3 VT-3 ISI-0298-C-3 .B13.60 BN2 RV RVI ~

  • 3' I

VT-3 ISI-0298-C-3 I B13.60 ' B N-2 i 1 1 I 9 U2RAUCG XLS 8/28/96 l 1

SEQUOYAH NUCLEAR PLANT UNIT 2 SECONDINTERVAL I ETR ' SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyygg N MBER CATEGORY CLASS 1 - l CVCS SUPPORTS l i FUNCDON "A " ~ ' VT-3 MSG-0015-C-4 F1.10A F-A'~ CVCS 2 CVCH-082 1 i '-CVCS ~ ~ ~ '~ i2 CVCH-089 I ~ 1 I VT-3 ' MSG-0015-C 4 F1.10 A ' IFA CVCS ]_ _ _ [2 CVCH-12'1 ' 2_ { 1 VT 3 MSG-OO15-C-3 F1.10A.~ I F-4 CVCS s 2-CVCH-013 2 VT-3 MSG-0015-C-1 F1.10A F-A CVCS'~ ~12 CVCH-018 2 VT-3 MSG-0015'C-i Fi.10A F-4 CVCS ~ 2-CVCH-043 3 VT-3 MSG 0015-C-2 F1.10A F-A ~ ~ CVCS ~ 2 I~ ^ 2 CVCH O75 ~ 3 VT-3 MSG-0015-C-3 ' F1.10^ F-h 1 FUNCDON *B" ) [CVCS((_ [2-[CVCH-299 ^ 1 VT-3 ' MSG-00i2-C 1 F1.10B F- ^ l ~' CVCS 2-CVCH-296 1 1 VT-3 MSG-0012-C-2 F1.10B _ _ F-[A ~ . T-3 MSG:0012 C-1 F 1.10B' 1 V CVCS i 2-CVCH-343 3 I ~ ~ F-A ' MSG OO15-C-1 [ F1.iOB _ _'F2i' ' ~[CVCS(( ~ 2'-[CVCHj004' [ '1 VT-3 CVCS _ _2-CVCH-007 _ j _1 _VT-3_ J MSG-0015 C 1 _ F1.10B _j _ _F-A_ VT-3

MSG-0015-C-1 F1.10B F

-A j CVC_S_ _ _ 2 CVC_H_-010 l 1 CVCS, L _ _2-_CVC_H-034 _

_1_ __ ; _ VT-3 MSG-0015-C_-2

_ F1.10B _ l _ _ _ F-A _ _ 1 CVCS 2-CVCH 037 1 VT-3 . MSG-0015-C-2 F1.108 FA i 1 CVCS ~ 2-CVCAli 23 i ~ 2' [ VT-3 1 MSG-00i 5-C-3 Y F1.10B T-~~~ F-~ ~ ~ ~ .__CVCSj { ]..[2{CV'CH 1l26-[] 2 VT-3[ ][ MSG 0015-C-3] ' 'F1.108[][ J ~ C MSG'0015-C-3 F1.10B_ _ _ VC_SJ _ _2:CVCH-129_ _._ _2 VT 3 _. . -A F CVCS i 2 CVCH-132 2_. VT-3 i MSG-0015-C-3 ! F1.10B F-A i [CVCS ~ [2-CVCH i35 ((2 VT-3 [ MSG-001_5-C-3' I ,F1.10B F4 J CVCS 2 CVCH-072 2 VT-3 MSG-0015 C-3 F1.108 F-A ]CVCS[ ~ [2-CVCH-078 _ 2 VT-3 MSG 00i 5-C-3 ' ' ~ CVCS ! 2-CVCH 102 3 VT-3 MSG-0015-C 5__ lF1.1 OB ' [F-A i CVCS.. 2 CVCH-002_ { F1.10B F-A 3 VT-3 MSG-0015-C-1 F1.10B F-A ^ ~~2 CVCH-046' I 3 VT-3 MSG-0015-C-2 F1.i OB 'F'- A' CVCS _CVCS [ 2-CVCHj049' 3 VT-3 ~ MSG-00i 5-C-2 ; F1.10B ~ '~ '~ ~ F-4 CVCS ; 2 CVCH-053_ 3 VT-3 MSG-0015-C 2 J F1.10B F-A CVCS 2-CVCH 105 3 VT-3 ' MSG-0015-C-5 ' F1.10B F-A CVCS' I 2-CVCH-29'2 3 VT-3 ' ' MSG-0012-C-1 I F1.10B F-4 CVCS ~ ~2-CVCH-361 3 VT-3 MSG-0012-C 2, F1.10B i J F A' FUNCHON "C" l 'T ^ ^^ CVCS 2-RCH 22 2 VT-3 ' ~' ~ F1.i OC ~i ~ I ~ FUNCDON "D" l ~ ~ ~ F-4~ ' ~ MSG OO12-C-2 MSG-0012-C 17 ' FI.~10D~ I F-A CVCS 2 CVCH 303 i 1 VT-3 ' i i ~ CVCS~ ~ ' 2-CVCH 087 ' I 2 VT-3 MSG 0015-C4 ^ Fi.10D 7 " F- ^ ~ J CVCS"I~ ~ 2 CVCH-347 3 VT-3 ' MSG-00'1262 ' ~ ' F 1.1 D ' F-A 1 INTEGRAL ATTACHMENTS' I CVCS 2-CVC H-006-I A 2 PT MSG-0015-C-1 i B10.20 8K 10 U2RAUCG.XLS 8/28/90

l i SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL . SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUMBE N M ER ' CATEGORY CLASS 1 ^ RCS SUPPORTS f FUNCTION 'A" RCS. l 2 RCH 027 1 VT-3 MSG-0013 C-3 F1.10A F-h RCS 1 2 RCH-036 2 VT-3 . MSG-0013-C-3 F1.10A F-A RCS _ ' 2-RCH-034 3 VT-3 ' MSG 0013-C 3 F1.10A F-A FUNCTION *B* \\ RCS i 2-RCH-d39 ' 1 VT-3 MSG-0013-C-3 F1.10B l F-A '~ RCS 2-RCH-088~ 2 VT-3 i MSG-0013 C-4 F1.10B F-A ~~ FUNCTION *C" \\ RCS 2-RCH-864 3' VT-3 ' ! MSG-0013-C-1~I ' F1.10C I~' F-A R.CS[ !~ VT-3[,I ' MSG-001_3 C-4 ] ' ((F1.10C_] ~ llF-lA[ _ ~ [RCH O95 [~3 [ 2-I ~ 1 l RCS 2-RCH-922 i 2 VT-3 , MSG-0013-C-1 '.T ' F1_.10C !._ _ _ F-A_ __ _. { MSG 0013-C-2 ! F1.10C i FA l RCS 'i~ 2 RCH 832 ~~i 1 i VT-3 .i 1 T RCS__ 2' RCS-833[ 1_ { ~ VT-3 ' ' MSG-0013-C-1 ] [F1.10D] ~ ~ [F-A~ ~ ~ ~ RCS i 2-RCH-835 1 VT-3 MSG-0013-C-1 F1.10D I rA ~ RCS 2-ITCH-086~~ I '2 l VT-3 MSG 0013-C-4 I F1.10D ~Y F-A RCS 2 RCif 895 2 ~ ' ~' ~^ VT-3 MSG-0013-C-2' ' F1.10D " F-A RCS [ ~ 2-R C H-031 '_ l3 { _ VT 3i_ _ MSG-0013-C-3,' ~~ F1.10D _ ] [F1.10D RCS 2 RCH-026 3 _ F1.10D _, _ _ F 1.1_0D _ VT-3 MSG-0013-C-3 INTEGRAL ATTACHMENTS. RCS 2-RCH-027-IA 1 I PT' MSG-0013-C-3 B10.20' E ' B-K 11 U2RAUCG.XLS 8/28/96 )

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyygE N MBER CATEGORY CLASS 1 RX SUPPORTS. FUNCTION *B* ' } F1.10B } Fh RX RCL-CLR 1 1 VT-3 ISI-0321-C-1 RHRS SUPPORTS ' FUNCTION *A" 1 RHRS ! 2-RHRH-004 i 1 I VT 3 . MSG-0010-C-1 i F1.10A F-A RHRS~ I ~ ' ~2-SlH-801 l~ 2 i VT-3 M SG-0010-C-7 F1.10A F-A ~ FUNCTION *B" RHRS 2 stH-806' 3 I VT-3 MSG-0010-C-6 ~ F1.10B } F_-' FUNCTION 'D' RHRS ! ' 2-RHRH-006 3 VT-3 MSG-0010-C-1 ~ ~ F1.10D ' F-^ INTEGRAL ATTACHMENTS 2 PT MSG 0010-C-1 B10.20~~ ~~B-K RHRS 2-RHRH-004-I A 12 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL I ETR IT CODE SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD yyygg g g gg yggggy CLASS 1 SIS SUPPORTS FUNCTION "A " ' [ SIS i 2 SlH-020 1 _VT-3 MSG-0009-C-2. F1.10A FA i _ [ SIS f ~~ ~2-SlH-228' 1 [, VT-3 I MSG 0009-C-10 { ~~ F1.10h] F-A' ~ ~ ~ SIS 2 SlH-165 2 1 VT-3 MSG 0009-C-7 : F1.10A F-A 2 I VT-3 MSG-0009-C-8' I F1.10A F-A SIS 2 SlH-153'~ SIS I 2-SlH-172~ l 3 VT 3 ' MSG-0009-C-11 F 1.10A' ~F-A ~ ~ SIS ~2 SlH 319 ' 3 VT-3 ~ MSG-0009-C-12 ~ F1.10A' F-FUNCTION "B" SIS 2 SlH-204 1 VT-3 MSG-0009-C-7 F1.10B i F-A [. ~ 2 SlH-164~ [ l _.VT-3 {. MSG-00 9-C-7,' F 1.1'O'B ~ [ ~ ' F-A ~ 1 SIS 0 F1.10B_ SIS 2 SlH 157 1 VT-3 ' MSG-0009-C 8 F-A ~ SIS _ ' _ _2-SIH-159 1 } VT-3 _ MSG-0009l-C-8 ] F1.10B[ [ F-Al ~ SIS 2 SlH-211 2 l VT-3 l MSG-0009-C-9 F1.10B F-A {. _ [2 SlH 224 ~ [2 ) _ VT-3 ~ ~~ SIS MSG-0009 C-10) ~ F1.10B]}. 1 1 F' __ _ A_ _ _ SIS i 2-SlH-217 2 VT-3 , MSG-0009-C-9 i _. F1.10B F-A ~ (( SIS [ i_ _ 2 SlH 220 { [2 } ~ VT-3 ] MSG-0009'-C-9' i [F1.1,0B] ))_F-}^]'~ ~ MSG-0009 C-7 I F1.10B i F-A SIS 2 SlH 207 1 .3 i VT-3 i ^'4 SIS L ~ ' 2-SlH-151' l 3 VT-3 MSG-0009-C-8 i F1.10B 'F-5'~' ~~~ SIS ~~I ~ ~ SlH 214~ '3' I - VT-3 i ~~ MSG-00'09 C 91 F1.'10B~ T F-A 2-i ~ 1 .. _ SIS _2 RHRH'09 _ ~ ~) _3 j _ _ VT-3 [ { MSG-0009 C-_1_2[__ _F1._10B _ _L _ F A _ _ _ _ ~ ~ 1 F-A SIS i 2-SlH-364 i 3 i VT-3 MSG-0009-C-12 ! F1.10B _ FUNCTION "C" i f 2 SlH-005 '1 VT 3 ' i i SIS MSG OOO9-C-3 ~ F1.10C i F-A ^

  • ~ ~

' ' VT-3 ~ ~ ' MSG-0009-C 5 T F1".10C F-A SIS' ~ ~2-SIN-068 ~ ~ 2 f ~ ~ ^ ~ ^ FUNCTION "D" S 1 VT-3 M SG-0009-C-3 ' 2 SlH-006 ^ ~ ~ ' 1.1'0D ". F-A SIS F .( v. g g g gg, _ -.. p g __ __p g, INTEGRAL ATTACHMENTS ~ ~~ ~ ~~~I ~ ~ ~~ SIS 2-SlH-020-IA 3 ^ 'PT MSG-0009 C 2 ~B10.'20 ^ l Blf ~~ l 1 SIS ~ ~~ 2-SlH-164-IA ~~3 PT ~ $ ~ MSG-0009-C-7 i B10.20 ' i ~ B-If ~ 13 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECCND INTERVAL T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyyg N MBER CATEGORY CLASS 2 CHEMICAL VOLUME CONTROL SYSTEM ~ CvCs wELoS CVCS 4" 237" '1 PT/UT ' ISI-0431-C;24 C5.21~ ~ C F-1 CVCS i CVCS - 148 CVCS CVCS - 149 1 PT/UT ISI-0431-C-24 C5.21 C-F-1 ~ PT/UT ISI-0431-C-24 C5.21 I C-F-1 CVCS CVCS-150 1 + CVCS CVCS - 147 ' 3 PT/UT ISI-0431 -C-24 ^ C5.21 ~ C-F-1 CVCS.. . _CVCF[- 10'O. _ l 3 [ PT/UT ISI-0431 C-24~[ _C5.21 C-F-1 CVCS C5.21[_ [C-F-1 CVCF-116 (Terminal End) 2 PT/UT, ISI-0431 -C-25 t CVC'S'}_ CVCS_g CVCS-193 _ {'2 [ _ ' PT/UT _ [ ISI-043'1-C 26 ' ~ ]~_CF1 CVCS - 196 l C5.21 + 2 l PT/UT ISI-0431-C-26 i C5.21._ ' _ _ C-F-1 i 2 j PT/UT j ISI-0431 -C-26 _. C 5.21 CVCS _ CVCF - 134_ C-F-1 ~ ' ~ ~ CVCS ~CVCS-189 ~' ^ 2 PT/UT [ ISI-043'1 -C-26~I ~C5.21 ~~I ^C-F-1 ~CVCS I ~ CVCS - 195 I ~ 2 PT/UT ! ISI-0431-C-26 ' i' C5.21 C-F'- 1 ~~ l CVCS 4".438" ~.. }.))[ ~ } CVCS CVCS - 053 3 t PT/UT i ISI-0431-C-17 i C5.21 C-F 1 CVCS I~ CVCS 7057' 'I 1 i PT/UT ISI-0431-C;17 ! C5.21' T C-F 1 CVCS CVCF - 036 { 1', { PT/UT ', ~ ISI-0431-C 17 ' ] C5.21[ [ C-F _1_ CVCS ( CVCF - 034. i 3 PT/UT ISI 0431-C-17 C5.21 C-F 1 CVCS 3".438" i CVCS ! ' CVCI - 031C 3 PT/UT ISI-0431 C-17 I C5.21 C-F-1 ~~ CVCS CVCF iO61A" 2' ^ ' PT/UT ISI-0431-C-31 C5.21 ~ I' C F-1 CVCS' I' CVCF J061' '2 ' PT/UT ISl-0431 -C-31 'C5.21 ~ .~ C-F-1 ~ ~ S Jn ~F f CVCS ~' ~ CVCS - 090 ' j [1 Pm hm-W i h h~f PT/UT 'ISI-0431'-C 32^} .C5.21[ ]i _ }C-Ffi~ 1 g_ CVCS CVCS - 115 1 PT/UT !SI-0431 -C-33 i C5.21 C-F-1 CjCS]~[ CV_CSi154[ _ ;3_ [ [ PT/UTl_] 'ISI-0431-C-33 ] ((C5.2i ,I _ .C-F-11 [1 CVCS. CVCS 113

_ PT/UT_

ISI-0431 C-33 L _C5.21 __[ C-F-1 __.CVCS i _ _ _ CVCS_ _,1_12 3 1 [ PT/UT. ISI-0431-C-33 [ . C5.21 C CVCS i CVCF - 075 .3 PT/UT ISI-0431 -C-33 i C5.21_. _ _ _ - F _1 CVCS(( __ _ 'CVCS - 120 [ ' _ ] _ _3[ j _ PT/UT ] ISI-043i-C-33_ ))C5.21 C-F-1 ~ ~ ]C[F'1[ _ CVCS j _ _ _ _ CVCF _077A_ 3_ CVCS CVCF 077 3 _ PT/UT. ISI-0431 C-34 ! C5.21 CF1 l 7 s PT/UT ISI-0431-C 34, C5.21 i C-F-1 i CVCS ~, ~ 'CVCF - 0778~ 3 PT/UT ISI-0431-C-34 ] ' 'C5.21 ~C F-1 CVCS 2".344" ~ ^ CVCS CVC - 2624 2 PT/UT ISI-0431 -C-28 C5.21 C F-1 CVCS CVC - 2622 1 PT/UT ISI-0431-C-28 C5.21 C-F-1 CVCS SOCKET WELDS (Sch.160) ' ISI 0431-C-18 C5.30' I C-F-1 CVCS CVC-3058 2 PT - CVCS CVC-3059 2 PT ISI-0431-C-18 C5.30 C-F-1 CVCS CVC' 3062 2 PT ISI-0431-C-18 C5.30 C-F-1 CVCS CVC-3063 2 PT ISI-0431-C-18 C5.30 C-F-1 CVCS CVC 3066_ I 3 PT ISI 0431-C-18 C5.30 [ C-F-[1 CVCS CVC-3067 3 PT ISI-0431-C-18 C5.30 C-F-1 CVCS' ~~ CVC-3073 1 PT ISI-0431-C-18 ' C5.30 C-F-1 ^ CVCS CVC-3074 1 PT l 'lSI-0431-C 18 C5.30 C-F-1 1 1 i PT ISI-0431-C-18 l C5.30 C-F-1 CVCS CVC-3075 '1' i PT ISI-0431-C-i 8 C5.30 C-F-1 CVCS ~ CVC-3076 ' CUC 2646 (Terminal Ens I 3 PT I ISI-0431-C-28 C5.30 I 'C-F11 J CVCS 14 U2RAUCG.XLS 8/28/96 )

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL IS ETRIC ITM C0DE SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD yyygg g g g y,gggy CVCS SOCKET WELD (Sch,40) _ ISI-0431-C-18 C-F-1 CVCS CVC-3086 3 PT i C5.30 CVCS Branch Connection'.344" I ^ CVCS 1 CVCS - 052B 1 PT ISI-0431 C-17 C5.41 ~ ^ ~~C-F-1 i a J 15 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL CfTEGORY . SYSTEM IDENTIFIC ONNUMBER PERIOD METHOD NUMBE N M ER CLASS 2 EUNCTION "A " l ~ F1.20A F-A CVCS 2-CVCH 401 I'2 VT-3 ISI-0449-C-24 CVCS 2 CVCH 404 I 2 l VT-3 ISI-0449-C-24 ~F1.20A ~ F-A f CVCS 2-CVCH-407 ' 3 VT-3' ISI-0449 C-24 F1.20 F-A ? ^ CVCS' '2-CVC H'-423 3 VT-3 ISI-0449-C-26 F1.20A FA CVCS ^ ~ 2-CVCH 505 ' ~ 3 VT-3 ISI-0449-C-16 ' ' F1.20A FA CVCS 2-CVCH 580 3 I VT-3 ISI-0449-C-29 ~ i.20A F-A F1 ~ ' ~ CVCS 2-CVCli 508 1 VT-3 ISI-0449-C-17 ' ' F1.20A ~ ~ F-A ^ ^ CVCS 2-CVCH 512 2 VT-3 ISI-0449-C-31 F1.20A FA CVCS ] 2-CVCH 541 { 2 VT-3 [ ISI-Od49-C-18 F1.20A ' F-A CVCS _2-CVCH-419 1 VT-3 ISI-0449 C-26 F1.20A j F-A CVCS., 2-CVCH 546 1 VT-3 ISI-0449-C-32. F1.20A F-A FUNCTION "B" ~ CVCS j 2-CVCMH-434_ _ _.. .FA j 1 VT-3 CVCS [_ 2-_CVCH-538 _1 _ VT-3..

.lSI-_0449 C-15 i F1.20B _ y CVCS 2 CVCH-583 2

VT-3 _lSl-0449-_C-18 i F1.20B j_ F-A ISI-0449-C 29 i F1.208 FA i ~CVCS~ ' CVCS JCVCH 548 _ ~ [_2 . VT-3 ' [ISI-0449-C-24 "[. [F1.2' B[ } [F-{_ _ ~~ [CVCif408 F1.20B_,; F-A_ _ 2 0 ~ 2 VT-3 , ISI-0449-C-33 i CVCSg _ _ _47A406-1-2_ .3 VT-3 ISI-0449-C-32 j. _.F1.20B _. [ _ F-A._ CVCS ~ 2-CVCH-552 3 VT-3 _, l ISI-0449-C-33 F1.20B F-A CVCS~ ^ ~ '2-CVCH-477 - ~ 3' VT-3 i ISI-0449 C-37 _[ ~ F1.20B~'} ~ F-A~~ FUNCTION "C" CVCS 2-CVCH-587 2' VT-3 ISI-0449-C-28 F1.20C ~~ F-A 1 CVCS' ! ~2-CVCH-585 3 ~~VT-3 ISI-0449-C 29 F1.20C F-4~ '~ i ~ FUNCTION "D" 1 VT-3 ISI-0449-C-16 ' ' F 1.20D __~[ F-A

CVCS_,

_ 2-CV C H-_502 _2. VT-3 ISI-0449-C-18 F1.20D F-A CVCS 2-CVCH-450 INTEGRAL ATTACHMENTS CVCS I 2-CVCH-538-IA I 1 PT ISI-0449-C-18 ' ~ C3.20 ~ 'C-C~ ~ CVCS' 2-CVCH-450 lA. [_ 2 PT ISI-044 9-C-18 ~{ C3.20 _ [ CC CVCS 2-CVCH 477-IA 3 PT ISI 0449-C-37 C3.20 C-C i 16 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL ISOMETRIC ITEM CODE SYSTEM IDENTIFICATION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY CLASS 2 ^ SAFETY INJECTION SYSTEM ^ SIS WELDS _[ ^- SIS 6",719" ~ I SIS SIS-415, 3 PT/UT ISI 0002-C-4 i' C5.11 C-F-1 SIS SIS-414 3 PT/UT ISI-0002-C-4 C5.11 C-F 1 t SIS SIF'-136 ~ I '2 i PT/UT ISI-0002-C-5 C 5.11 C-F-1 ^ SIS SIS-268' I 1 PT/UT ISI-0002-C-6 C5.11 C-F-1 ^ SIS SIS 269 3 PT/UT ISI-0431 -C-6 C 5.'11 C-F-1 i ~ ~~~ SIS ~ 8".812" ' ~ " ~^ C-F 1 ~~ SIS SIF- 06 (Terminal End) 3' i PT/UT ' ' ISI-0002-C-1~~ I ^ C5.ii' '[ SIS}_ [ [ SIS-017 ~ ] ~1 [ PT/UT ] ISi-0002-C-i ] ' ( PT/UT ISI 0002-C-1_ C5.11_ _ _ }C}F'-1__ C5.11 _1 SIS, _ _ _ _ SIS-019 ,. 1 PT/UT, ISI-0002 C-2 _C5.11___ C-F_1__ SIS l SIS-035 C-F-1 i ~ iS. ] _ ~~ SIS SIS 411 _ } _ _2 .'PT/UT ] ISI-0002-C-2 [ ' C 5. I 1 I~]CfF-1^} S SIS-036 i _3 PT/UT j ISI-0002-C-4 . C5.11 __ _C-F-1__ SIS SIF-160 2_ PT/UT ISI-0002-C-6 j C5.11 C-F-1 i SIS.10" 1.0" C5.11 ~C-F'- 1 SIS SIS-254 1 PT/UT ISI-0002-C-4 ~ SIS ~ l SIS-258 l 3 PT/UT l ISI-0002-C-5 'I ~C 5. i 1 ' CF-i '~ SIS ~ ~ ~' ~ SIS ~ SIS-259 ' '3 PT/UT iSI-0002-C-5 C5.11 C-F-i SIF-143~ 2 PT/UT ISI-0002-C-5 I C5.11 ' SIS 12" 0.375" I ~ C-F-1 I ISI O431-C-12 C5. I 1 ' C-F-1 ~ SIS CSS-013 1 PT/UT SIS [ ^ . CSS-0_16 2 PT/UT _ ISl O431-_C_-12 __ C5.1_1i [ ~ TC-F-i.~ i SIS CSS-018 2 PT/UT ISI-0431 -C-12 C5.11 C-F-1 l SIS 16" 0 375" ' SIS I.-- 'SIF-04 7 1 .$ ~' PT/UT I ISI-0431-C-12. C5.11~ ~~~ 'C F-1 -n _ _ SIS _j . _ __ SlF-03'8 _.p[2' [ [ PT/UT[ '_ SI-0002-C-1 j [C 5.1'1 ~ PT/UT lSI-0002-C-1 _[ ] C-F_-1____ l SIS l SIS-078 1 2 SIS 24"10.375" . C 5 _11_ _ j __ C-_F-1 i _._ SIS SIS'd97 PT/UT [ 'lSI-0431-C-i3 {. .C 5.11_ _ _ ~ SIS ^ SIS-102_ L 1 j ~

_ C-F-1___

SIS 1 3 I PT/UT ISI-0431-C-13 : C5.11 C-F-1 SIS-i O3 ' 3 PT/UT i ISI-0431-C-13 I C5.11 ~ C-F-1 SIS. 2".344" [ SIS SI-2114 2 PT/UT ISI-0431-C-9 C5.21 C-F-1 ^ SIS SI-2269 1 PT/UT ' lSI-0431-C-9 C5.21 ' C-F-1 SIS 4".237" SIS SIS - 173 1 PT/UT ISI-0431 -C-23 C5.21 i C-F-1 SIS SIS - 174 2 PT/UT ISI-0431 -C-23 C5.21 C-F-1 l SIS 4".337" SIS SIF 075 _2 _ PT/UT ISI-0431-C-2 C5.21 I C-F-1 ^ SIS _ 1 SIS ~ ~ SIS 136 3 PT/UT ISI-0431-C-2 C 5.21 C-F 1 SIS-137 ' 3 ' 'PT/UT ISI-0431-C-2 C5.21 i C-F-1 SIS SlS-138 3 PT/UT ISI-0431-C-2 C5.21 I 'C-F-1 SIS ^ SIS-144 1 PT/UT ISI-0431-C-2 C5.2i l C-F-1 SIS ^ SIS-145 '1 PT/UT [ ISI-0431 -C-2 [ C5.21 [ Cyi SIS 4".438" 17 U2RAUCG XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T ISOMETRIC ITEM CODE SYSTEM IDENTIFICATION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY SIS SIF-215 1 PT/UT ISI-0431-C-1 C5.21 C-F-1 SIS ' {' SIS 356 1 PT/UT !.lSI-0431-C 1 { C5.21 C F-1 SIS (__ SIS;357 _ _ 3 PT/UT C 5.21 .C-F-1 _ _ _ SIS SIS-358_ 4_ ISl;0431-C-1, j _C5.21 _ i 3 PT/UT i ISI-0431-C-1 i C-F-1 SIS 'I SIS-359 3' PT/UT I ~lSI-0431-C-1' ~ l C 5.21' ' ~ ' C-F-1 ~ __. SIS [ { ' SIS-360' 3 __ T/UT, _ ISI-0431 C-1 } [C5.21_ g _'_C:F-1 ^ P SIS SIF-219 2_ PT/UT ISI-0431-C-1 C5.21 _C-F-1_ i SIS 3".3" ~ SIS ' SISd69 2 ' 'PT/UT I ISI 0431-C-1' l ~ C5.21 ' 7 C-F-1 S7 NswKs

  • Y l em i s043m

~ ~- e ~ E' ~ m-S~~P iFG9 l 2 i PM i hm0 h C F-1 SOCKET WELDS i SIS 2".154" l " ~~ ~ ~ SIS j SI-10'20.. j_3 PT ISl-0431-C-27 .C 5.30.~[~ '~ C-F-1 1 SIS SI-1022 3 l PT ISI-0431 -C-27 C5.30 C-F-1_ i SIS 2".218" j C_F-1 SIS [_ _SI-1463 _2 PT ISI-0431-C-27 _, . C5.30 _l _ C-F-_1_ _ SIS.__L . _ SI'.1464 { __2 PT j_ ISI-0431 -C-27, ; C5.30_ _. SIS SI-1465 2 i PT , ISI-0431-C-27 C5.30 C-F-1 4 - SIS I SI-2162 3 PT ISI 0431 C-7' 1 ~ ~ C5.30 I ~ 'C-F-1 ~' 4 _ _ SIS. _.! _ SI-21[63 [ ' 3_ (( PT ' { ISI-0431 C-7 [ ~ ~ C5.30~I^' ~ 'C#-T 7 -- SIS. I _. -.. _SI-2166 __ _ ! __. 3 PT _ SI 0431-C 7 i. C5.30 .' -- C-F-1 I 4 -_.. SI S_ . [ ___ __ SI-226i[ [ [ _1 _ g_ _'PT _ { _ ISI-0431-C-8_ _. PT _ ISI 0431 C-8J. _C5 30_j]C-F 1] _ _.618. 4_ SI-2262 _,__ _,_ _1 i _PT ___ ISI-0431 -C-8 i C5.30 i C-F-1 C5.30 1 C-F-1 SIS i SI-2263 l 1 SIS } SI-2264A 1 1 PT ISI-0431-C-8 C5.30 C-F-1 l~ S' ~~- ~ ~2264 Si i 1 er iSi-0431 -C-8 i C5.30 C-F-1 SiFr - ~ Si-2266~ ^2 eT~

  • ' Si-0431-C-9 l '

C5.30 i C-F-1 i ~ ~ gig- ~ ~ ~ SI-2267~~ 2' I PT ' ISf-0431-C-9 " C5.30~~ I C-F-T'

  • ~

S ~ Si-2268 2 i PT iSi-0431-C 9 C5.30 ~I C-F-1 ~ i SIS Branch Connection.344" '( I j~~ ~ ] SIS SIS-355C 3 I_ PT ISI-0431 -C-4 C 5.41 l C-F-1 1 18 i I U2RAUCG XLS 8/28/96

l SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL l COM NT ISOMETRIC ITEM CODE , SYSTEM IDENTIFICATION NUMBER PERIOD METHOD NUMBER NUMBER CA TEGORY l - CLASS 2 888 SUPPORTS - FUNCTION "A" SIS l ' 2 SlH O62 '3 ~I VT-3 ISI-0449 C-8 i F1.20A ' i FA I SIS' I }2 S'lH-46'5[ I.3 VT 3 l ISI-0449-C'2 [ F1.20A" AFA SIS _ 2 SlH 481. 3 VT-3 ISI 0449-C-3 F1.20A F-A SIS i 2 SlH-292 3 VT-3 ISI-0449-C-7 F1.20A F-A '~ ~ SIS 2-SlH-114 1 VT-3 l ISi 0449-C-9 F1.20A SIS ~ 2 SlH-440 1 VT-3 'lSI-0449-C-39 F1.20A ~ ^ F-F-A SIS 2-SlH-451 ~ 1 VT-3 MSG-0009-C-9 ' F1.20A ' I F-A SIS ' 2 SlH-408 2 VT-3 ISI-0449 C-13 F120A~ ' F-d ~ ~ ~ ' ~ SIS 2 SlH 456 ~ 2 2 VT-3 MSG-0009-C-4 ~! F1.20A F- ~ ~ ~ ~ ~ ^ SIS 2 SlH-812 2 VT-3 ISI-0449-C 19 F1.20A ~ I 1 F-A [ F1.20A~ } FA SIS 2 SlH 463 1' VT-3 1 l Isi O449-C-23 FUNCTION "B"' _ SIS _ 2-SlH 281_ _ 3 VT-3 ISI-0449-C 6 _F1.20B _ __L _F-A SIS _ -SlH-080 _. 1 VT-3 lSI 0449-C-2_ q _ F1.208.__ __ ! _ _ F-A_ _ _ 2 3 VT-3 ISI-0449-C-1 i F-A SIS _ 2 SlH-470 , _,_ F 1. 2 0_B SIS _ 2_SlH-122_ ~ ~ .1_. . ;._ISI-0449 C-7 F1.20B i F-A SIS 2-SlH 815 VT-3 i [2 VT-3 } _ lS_l-0449fC 8 [ 'F.1.20B_ ][ F{A][ SIS 2-SlH-476 2 VT-3 ISI-0449-C-3 i F1.208 F-A SIS i ~ SlH-126 ~ ^ SIS [ ~ [ ~ ~ 2-SlHj284[ '2 { ' VT-3 ' ISI-0449-C-7 ~ i ~ F1.20B~ I 2 VT-3 ISI-0449-C 8 F1.208~ l - ~ ~ ~ ~ ~ ~ ~ 1 F-A ^ I ~ lh~ F SIS [ 2-SlH-128 2 VT-3 2-SlH-129 2 VT-3 ISI-0449:C-9 _! _ F1.20B r F1.208 F-A SIS ISI-0449 C-8 F-A SIS [ 2-SlH 135' '2 I VT-3 ISi O449 C-10 F1.20B~ i ~ F A' - " 1 '~ l 2 _._ _ S[ [ SIS 2-SlH-351 3 [ _ VT-3 ISI-0449[-C-10 F1.208 i . l2 SIH 103 _hl[F-A ___ SI 2 VT-3 ISI-0449-C-20 : F1.208 F-A Ss~" ~ 1SMn 1~ 'm' M9M "7df' 'M' [ SIS] ~ ~ ~ SlHy9_9 [ 1[ ] ~ VT-3' ISI-O'449-C-10' F1.20B ' [ ~ _ -{_ _ 2-F 7 SIS 2-SlH-356 1 VT-3 . ISI-0449-C-21 l F1.208 F-A '{~ ISI 0449-C-22' { ~F1.20B ^[~'F-A SIS j2-SlHy360 1 } VT-3 SIS 2-SlH-287 1 VT-3 ISI-0449-C-7 F1.20B [ F-A SIS 2-SlH-137 1 VT-3 i ISI-0449-C-10, F1.20B F-A 478435 548-19 1 I VT-3 ISI 0449-C-27 ^ F1.208 ^~~~4 SIS ~ I F- ' 2-SlH-402 ~ SIS. 2 SlH-094' I 3 VT-3 l ISI-0449-C-11 F1.20B_ _ { _] F A 3 VT-3 { ISI-0449-C-13 F1.20B I ~ SIS ( F-A SIS ' 2 SlH-326 ~ '3 VT-3. ISI-0449-C-20_ _ F1.20B F-A SIS i ~ 2-SlH-405 3 VT-3 ~ SIS ~ 2-SlH 329 3 VT-3 ~ 'ISI-0449-C-13 I ~ F1.'208 F- ~~ ~ ~ ~F-d' 1 ISI-0449-C-20 F1.20B SIS I ~47B435 548-06 2 VT-3 ISI-0449-C-27 ' ' F1.20B [ ~ FA FUNCTION "C" I J SIS 2-SlH-359 1 VT-3 ISI-0449-C-22 F1.20C FA SIS l 2-SlH 448 2 VT-3 ISI 0449-C-38 F1.20C F-A FUNCTION "D" SIS 2-SlH-028 3 VT-3 ISI 0449-C-1 F1.20D F-A' SIS 2-SlH-115 1 VT-3 ISI-0449-C-9 F1.20D F-A SIS 2-SlH-814 2 VT-3 ISI-0449-C-19 F1.200 FA i SIS INTEGRAL ATTACHMENTS SIS 2-SlH-815-I A 1 PT ISI-0449-C-7 C3.20 C-C 19 U2RAUCG.XLS 8/28/96

i SEQUOYAH NUCLEAR PLANT l UNIT 2 SECONDINTERVAL ' SYSTEM IDENTIFIC ON NOMBER PERIOD METHOD NUMBE N M ER CATEGORY \\ SIS 2-SlH 135-IA 2 PT ISI-0449-C-10 C3.20 C-C i SIS ' 2 SlH-1'03 lA~ 3' PT ISI-0449-C-10 ~ C3.20 ~ ~ C-C'~ ~ ^ ~ SIS ~2-SlH-080-IA 3 ~ PT ISI-0449-C-1 C3.20~~ 'I C-C i i i l 20 U2RAIJCG.XLS 8/28/96

l SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL CO ENT ISOMETRIC ITEM CODE SYSTEM IDENTIFICA TION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY j CLASS 2 - l CONTAINMENT SPRAY SYSTEM [ ,{ ~ CS 12".0.375". _ l ..C 5.1 1_ .I.____ CSS i CSS-037

. 2 PT/UT ISI-0007-C-3

,__ C-F-1 I CSS' [ CSS-038._ i 2

PT/UT ISI-0007_C-3

.C 5.1 1. . C-F-1 CSS CSF-26 _1 .PT/UT ; ISI-0007-C-3 . C 5.11___ _ L _C-F-1 4 CSS CSF-51 (Terminal End) .2 PT/UT. ; ISI-0007-C-4 . _C 5.1 1 _, _ __ C-F-1 _ CSS ... __ _. _C SS-06 6., _. .. PT/UT ISI-0007-C-4.. .C-F-1_._ 3 C5.11 gg g. 3 ( p,,g( g _p CSS-049 ^ I '1~ I ~PT/UT I ISI-0007 C-5 i. ~ 'C 5.. i 1 '.I.- ' 'C-F-1-- CSS ~ + CSS' ^ CSF-17 3 I PT/UT ISI-0007-C-1 ' ~ C 5.1 '1 ~ C-F-1 ^ CS 20" 0.375" I 3 PT/UT, ISI-0007-C-1 } C5.11 ~ C-F-1 CSS _ _ CSS-026. CSS CSS-009 3 PT/UT ISI-0007-C 2 l C 5.11. C-F-1 ^ CS '3" 0.216" ' I CSS i CSF-99A ' 1 I ' PT/UT ISI-0431-C-36 I ~ ~ ~ f ~ C5.21 ' C-F-i ~ ~~' ~ CS SOCKET WELDS.154" CSS CVCS-4115_ i 1_ [ PT' ' ' ISI 0431-C-36 { C5.30.[ ] ' _'.'}C-F-[1 CSS CVCS-4114 ' 3 3 PT ISI-0431 -C-36 C5.30 C-F-1 _l_ _ _ _ ' _ ]' .[ [ [ _. ~ CS Branch Cornection.154"i PT

ISI-0431 -C-36 i

C5.41 i C-F-1 CSS CSS-101 A 2 i l 21 U?9AUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyyg N MBER CA TEGORY CS SUPPORTS j CLASS 2; 3 FUNCTION "A_"': l \\ CSS 2-CSH 428 2 VT-3 ISI-0449 C-40 F1.20A _ F-A i C' S 2-CSH-430 I3 ) S VT-3 { ISi-0449-lC-40 ', ~ F-h F1.20A . 2-CSH-426 3 VT-3_ CSS ISI-0449-C-40 F1.20A F-A CSS ~ ^ ' 2-CSH 432 I 1 VT-3 ISt-0449 C-40 ~I ' F1.20A F A' 1 FUNCTION "B" 2 CSH-437 '1 VT 3 ISI-0449-C-40 F1.208 FA CSS _ 2-CSH-443 3 VT-3 MSG-0011 C-1 F1.20B F-A CSS CSS 2-CSH 424 2 VT-3 ISI-0449-C-40 ~I F1.20B F-A ~ ~ CSS' ' ~I2 CSH-435 ~ 3 VT-3 ~ ISI-0449-C-40 ! F1.208 FUNCTION "C" 1 F-A~ ^' ^ 1 VT-3 MSG-0011-C 2 } _ F1.20C [ F-A CSS 2 CSH:449 CSS __; 2-CSH-411 CS INTEGRAL ATTACHMENT ? 2 i VT 3 M SG-0011 -C-3_ F1.20C F-A i '~ i 'l ' CSS 2-CSH-443-IA i 3 PT M SG-0011 -C-1 I C3.20 CC' 22 U2RAUCG,XLS 8/28/96

l SEQUOYAH NUCLEAR PLANT UNIT 2 SECONDINTERVAL i '#0 ' #f SYSTEM IDENTIFIC ON NUMBER PERIOD ' METHOD NUMBE N MBER TEGORY CLASS 2 - RESIDUAL HEAT REMOVAL SYSTEM RHR 8" 0.812" RHRS ! RHRS-203 3 PT/UT ISI-0003-C-5 .C 5._1 1 . C _F _1_. , RHRS,, RHRF-114 1 PT/UT ISI:0003-C-5 ~ C 5.11 C-F-1 RHRS RHRS 182. [ j' RHRS[178 2 PT/UT ISl-0003-C-6 [ ~ C5.i 1 { .C-F-1 RHRS 3 PT/UT ISI-0003-C-6 C5.11 C-F-1 RHR 12" 0.406" RHRS RHRS-O'75 1 PT/UT ISI-0003-C-2 ~ C5.11 ~ C-F-1 ^ RHRS~l' ' RHRS-074 3' ~ PT/UT ^ l 'C F-1 I ISi 0003-C 2 C5.11 RHRS~$ ~RHRS-194' 3 PT/UT I ISI-0003-C-5 C 5.1'1 I 'C F-1~~ ~'

  1. ~~

~ CSS-003 i' 2 PT/UT ' 'lSI-0003-C-9 I C5.11~~~i 'C-F-i RHRS ~~RHRS *~ ~C SS-00'4~ l 2~ ^ ~ PT/UT I ISl 0003-C 9 "I ~ ~ C 5. i~1 'i ' 'C-F-1~ ~! i RHR ' 12".1.312" - RHRS ' RH RS-19'7 3' PT/UT[ ' ISI-0003-C-5 C5.11 C-F-1 RHR T 14" ' O.438". ~ i ~~ ^ i RHRS j RHRF-006A l' PT/UT ! ISI-0003-C-1 [ ' C 5.11 C-F-1 ~

  • ~

RHRS_j RHRS-011 1 PT/UT ISI 0003-C-1 C5.11 _ C-F-1 RHRS _ RHRF-014 ._g 1 i. PT/UT. ISI-0003-C-1 C5.11~ _ L _ _ lC-F;1 ^ RHRS__; .C5.11 C-F-1 RHRF-015 (Terminal End) 3 PT/UT l lSI-0003-C-1 R' HRS I ~ RHRF-198~~ ^ ' ~ 2 I PT/UT ~ lSI-0003-C-4 C 5.1 1 ' ^ I C F-1 ~~RHRS~[ 'RHRF-020 2 ' ' PT/UT ISI-0003-C-4 I ' C5.11' ~ 'C F-1 I '~ RHRS ' RHRS-041 ~ 2 ~ PT/UT ISI-0003-C-4 ~ C5.11 ~~RHRS ~I ~ 'RHRS-042 2 PT/UT ~ ISI-0003-Cd 'C 5.1 1 ~ C41 ~ C-F 1 RHRS'"!~ ' RHRS-045 '1 PT/UT ISI-0003 C-4 C 5.1 i ~ [ C-F-1' ^ - RHR 18" 0.562" l RH'RS RHRF-010A' '1 i PT/UT I ISI-0003-C-i' I 'C5.11'~ [ C-F-1 i ((RiiR'S[~[.~~ RHR'S}-004[ ][3l_ [ PT/UT ISI-0003-C-1_ [~C5.11} _[.]C-F[1 ~ RHRS RHRS-023 3 j PT/UT ISI-0003-C-1 C5.11 RHR ;3" '0,216" _. ;{ _ g __C-F-1 y. y_. RHRF _074 _i 2_ PT/UT ; ISI-0431_-C-3 5 C5.21. _. R_ HRS _ _ ! _ _ RHRS-137 2 1 PT/UT. ISI-0431 -C-35 _ C5.21 ._ _C_-F-1 RHRS C-F-1 '~ ~' R' HRS ~ 'RHRS 160' ~ '3 PT/UT ' ISI-043i-C-35^I ' C 5.2i ~ ~C-F-1 T SW' F~3 i PM ^ MMM ' '~DS M ~ DF4 RHR 4" 0.237"L [ [~ [ l'[ [~ ~ ~ ~._ RHRS. RHRF-0227 i 1 ) PT/UT ISI-0431 -C-35 i C5.21 C-F-1

  • ~

RHR SOCKET WELD".154" T RHRS RHRF-0083 2 PT ISI-0431 -C-35 C5.30 C-F 1 RHR Branch Connection.237" RHRS RHRF-0222 3 PT/UT ISI-0431 -C-35 C5.4i I C-F-i 23 U2RAUCG.XLS 8/28/96

1 1 1 I SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyygE N MBER. CATEGORY l CLASS 2 RHR SUPPORTS ' j FUNCTION 'A' ~ RHRS 2 RHRH'-405 '3 'VT-3 MSG-0010-C-3. F1.20d i ~F-d ~' ~ RHRS ~~2-RHRH-473 2 VT-3 ISI-0449-C-41 F1.204 [~~ Fd i ' ~' i 2 RHRH-487 ' '3 VT-3 ISI-0449-C-41 F1.20A ' I ~ ' F-A ~ RHRS RHRS 2-RHRH 477' "'1 VT-3 ISl-0449-C-41 ~ F1.20X ~ ~ ~ ~F- ~~ i RHRS.[ [2 RHRH-484. { ~2 ' VT-3 . lSI-0449-C'-41 [ [_F1._20A] iF-f ~ RHRS j__ _ 2-RH RH-478 2 VT-3. 3_ ISI-0449-C-41 F1.20A RHRS ' 2-RHRH-442 3., j_ F-A VT-3

MSG-0010-C-4 F1.20A F-A RHRS'

~2-RHRH-434 '1 VT-3 ~' ISl 0449-C 36 F1.20h ~ I ' F-' 2 l ~ FiHRS '2-RH R H-43 5' ~ 1 i VT-3 ^ ISI-0449-C-36 I F1.20A~ F-4 FUNCTION "B" RHRS 2-_RHRH 471 3 VT-3 MSG-0010-C-4 l lF1.208 F-A ..RHRS 2-RHRH-464 3 VT-3 MSG-0010-C-5 F1.20B F-A l RHRS $ 2 RHRH-472 2 VT-3 MSG-0010-C 5. F1.208 F-A 2 ~ i RHRS !' ~ 2 RHRH 489 2 VT-3 ISI-0449-C-41 F1.20B F-A RHRS'l' 2-RHRH 432 ~ ~ F1.20B' F-A VT-3 ISI-0449-C-36 1 FUNCTION "C" ' . -RHRH-480 2 VT-3_ ^}~ _F1.20C _ _ y 2 ISI-0449-C-41 _ _ }l RHRS } F_ -A RHRS_ 2 RHRH _481_ 3 VT-3 [ _ ISI 0449_-C-41_ _ F 1.2_0C,__ _ j _ _ _F_A_ l RHRS 2-RHRH-437 _ F-A 1 VT-3 l iSI-0449-C-36 F1.20C .RHRS ; _2 RHRH-401__ _2 VT-3__ [ ~l __F1.20D_ . F-A ~[ } __ FUNCTION 'D" MSG-001_0-C-3_ t_ F-A RHRS ' 2-RHRH-463 1 l VT-3__ MSG-0010-C-5 l F1.20D ^ [ [ []((i ] _ _ RHRS VALVE SUPPORT. __ _. VT-3_. .. MSG-0010-C-5 ; F1.40 i F-A RHRS 2 RHRH-509 3 RHRS INTEGRAL ATTACHMENTS L RHRS I URHRH-405-IA 3 ~PT~~.,i. -C-~~ MSG-0010-C-3 ~. ~C3.20' ~ ~ i ~C 24 U2RAUCG.XLS 8/28/96

1 SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL ) T SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gygg N MBER - CA TEGORY { Cl, ASS 2 : FEEDWATER SYSTEM-l FWS ' 6" 0.432" - i ) PW' S~ FDS 27N 3 MT/UT ' ' CHM-2403-C-2 ] C5.51 ._.,I_[C-F-2 FWS 16" 0.844" ' 1 FDS-06 2 MT/UT CHM-2403-C 1 FWS ' FDF-006[ [2. [ MT/UT CHM-2403-C-1.[ _' C5.51 ' C-F-2 f C5.51 C-F-2 l FWS j_ I FWS FDF-128 FWS FDS 27 'l 2 MT/UT, CHM-2403 C-2 C5.51 C-F-2 j 7 _ MT/UT CHM 2403-C-2 C5.51 3 FWS 1 ~ FDS 28 3 MT/UT I CHM 2403-C-2' ' C5.51 ~ C-F-2 C F-2 FWS' FDS 20' 1 ' MT/UT CHM 2403 C-2 ' 'C5.51 l C-F-2 FWS ~ [ ~~FDF-138 1_ _ MT/UT CHM-2403-C-2 C5.51. } ~ [ C-F. MT/UT CHM-2403-C-2 ', C5.51 FWS FDF-141 (Terminal End). _ _ 1 C-F-2 _ _ _ _ FWS' '~ FDF-131 (Terminal End)' ' 3 MT/UT CHM 2403-C 2 ' 'C5.51 'I ~ C-F-2 I FWS 18" 0.938"' I 2 MT/UT ! CHM 2403-C 2 i FWS FDS 17

  1. ~

~C5.51~7 C F-2"' ~~ 25 U2RAtJCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL O - SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUMBE N MBER CATEGORY CLASS 2 FWS SUPPORTS FUNCTION *A * ~ FWS 2 FDH-326 2 VT-3 MSG-0016-C 1 F1.20A F-A FWS 2-FDH 327 3 VT-3 MSG-0016-C-1 F1.20 FIA ^ FWS 2-FDH 241' [ 1 VT-3 MSG 0016-C-2.[ F1.20A i ' F-'~ FUNCTION *B" { FWS 2-FDH 207 2 VT 3 MSG-0016-C-1 F1.208 F-A FUNCTION *C" '~ FWS _,, 2-FDH-202 2 VT-3 MSG-001'6-C-1 '[ F1.20C.] F-A FWS i 2 FDH-322 '3' i VT-3~ MSG-0016-C-1 i F1.20C i F-A FUNCTION "D * ^ \\ FWS 2'FDN 205 1 VT 3 MSG-0016 C-1 F1'.20D I~ F-A'~ ^ ~ i - ~ ~~ ~ ~ FWS INTEGRAL ATTACHMENT FWS I 2-FDH-326-IA 2' MT ' T ' C3.20 ~ I C-C MSG-0016-C-1 U2RAUCG.Xt.S 8/28!96

} SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL SYSTEM ' IDENTIFIC ON NUMBER PERIOD ' METHOD T yyygE N M ER ' CATEGORY MAIN STEAM SYSTEM MSS 6" 0.864" MSS I 'M SS-7'O '3 MT/UT ISI-0015 C-1 C5.51 C-F-2 MSS" !'~ MSS-48 I 1 [ MT/UT ISI-0015 C-2 C5.51 C-F-2 MSS 6" '1.5" , _ lSI-0015-C-1_ __ ;.. _ C F-2 ._ MSS 4 MSS-32 2 MT/UT, _Isi-0015-C 2_ ,.. C 5. 51_. MSS MSS 56_ ,2 MT/UT { . C5.51 MSS-45 3 MT/UT ISI-0015-C-2 C5,51 _ _ C_-F_2 ,g MSS C-F-2 MSS 32" ', '.151" - 'I~ ~ ~ ~~~ 1 MSS j. ' M S S-04' "2 [ MT/UT ISI:0015-C-1 ^ ~ [ C5.51] _ [ ~C-F-2' ~ ~ MSS i MSS-20 _ .3 MT/UT ISI-0015-C-1 C5.51 . C -F-2 _3 MSS I MSF-001'(Terminal End) ~ 3 I ~ MT/UT ISI-0015-C-1 I C 5.51 ' C-F-2 1 MT/UT ISI-0015-C-1 C 5.31 C-F 2 1 MSS ' MSF-032 iTerminal End) l MSS M SF-038 ~ I 2 MT/UT ISI-0015 C-1 C5.51 C F-2 ~~ MSS ~ ~ MSS-17 '1 ! MT/UT ^ ' ' SI-0015-C-2' C5.51 C-F-2 l ~ MSS [ ' M SF-014 ] 2' MT/UT_ } ISI-0015-C-2 { C5.51 ' C:F-2 ) . MSS.. _ MSS-16 _ 1 ' MT/UT ISI-0015-C-2_ C5.51 C-F 2 MSS MSF-027 1 _ MT/UT _ ISI-0015-C-2 C5.51 C-F-2 [ MSS _MSF-028._ 3 MT/UT ISI-0015-C-2 _, C-F-2 i C5.51 ^ ^ ~ ~ MSS 36" 3.375" MSS MSS-62 2 . MT/UT ISI-0015-C-1 C5.51 i C-F-2 MSS I MSS-40~ '3 I ~ MT/UT ISI-0015' C-2 I' C 5.51 ' ~ * ~ ~C-F-2 ' ~ 1 ~ MSS I " MSS-51 ~ ^ ~ MT/UT ISI-0015-C-2 ~ ~ ~C5.51 C-F-2 27 U2RAIJCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUM E N MBER CA TEGORY 1 CLASS 2 MSS SUPPORTS - __ _ i .J FUNCTION *A ' ', l VT-3 MSG-0017-C-2 J _F 1._20 A _ MSS l 2-MSH-389 2 F-A _ ] FUNCTION "B" 2 MSH' 31'7 1' VT-3 I MSG-0017-C-1 I F1.20B F-A MSS 4 MSS 2-MSH 385~ l 3 VT-3 MSG-0017-C-2,. F1.20B' F-A ~ 2 ~ FUNCTION 'C" 1 MSS 2 MSH 307 1 VT-3 MSG-0017-C-1 F1,20C F-A ~ MSS ~ ' ' 2-MSH'425' ~ 2 VT-3 MSG-0017-C-1 F1.20C F-^ ~ ^ ^ MSS' ~2-MSH-344 3 VT-3 M SG-0017-C-2 F1.20C F-A FUNCTIO)V_ *D" i l___}____ 2'MS' 322 1' I VT-3 MSG-0017-C-1 ~I F1.20D j F-A MSS i H ~ MSS ~ 'I 2-MSH 392 2 VT-3 MSG-0017-C-2 ~ F1.20D I~ ~ F-A ^ ~ MSS i ~ MSH-357 i 3 I VT-3 MSG-0017-C-2 F1.20D ! ~ ~ ~ F-A 2 MSS INTEGRAL ATTACHMENT;.,. MT I MSG-0017-C-2 ! C3.20 C-C MSS 2-MSH 389-lA 2 1 1 l 28 U2RAUCG.XLS 8/28/96

1 1 SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD NUMBE N M ER CA TEGORY CLASS 2 VESSEL WELDS CLASS 2 SG SGW E1 1 UT ISI-0401-C-1 C 1.10 'C-A SG }~ 'SGW-D1 2 UT ISI-0401-C 1 C 1.10' ' .CA. SG SGW-C1. 3 UT ISI-0401-C 1 C 1.10 _C _A RHRS RHRW-16 A. _C1.10 C-A_. ~ 2 UT ISI-0289-C-1 ~ CSS ~~CSHXW-4'B '3 UT ISI-0463 C 1 C1.10 ~ C-A'~ CVCS SWHXW 2 3 UT ISI-0461 -C-1 C 1.10 C-A CVCS SWFW-1 2 'UT ISI-0459-C-1 C1.10 'C-A 4 3 i UT ISI-0457-C-1 C1.10 ' ~ C-A CVCS SWIFW-1 X ^ '~ SG _ _ ' SGW-_F 1 _ .1 { UT j ISI 0401 C-1 _ C1.20. iC-A [ __ C-A 7 _RHRS_ _ ~ .RHRW-17 A _2 UT ISI-0289 A-1_ . _ C 1.20 CVCS SWHXW-1 [ ,3 UT SI-0461 C-1_ j _ C1.20

_ _ C-A I

CVCS SWFW-2 2 UT ISI-0459-C-1 C1.20 C-A_ CVCS [ ' SWIFW-_2 X ' { 3 l _ UT } ISI-0457-C-1__} C1[.20 ][}]C{A~~ ] SIS __L BIT-3 .p 1 _UT ISI-0074-C-1_ t . C1.20 j. C-A i SIS BIT 4 3 UT ISI-0074-C-1 SG ..n C 1.20 _ C-A SGW-B1 1 UT ISI-0401 -C-1 C1.30 { C-A CSS CSHXW-3 B 3 UT ISI-0463 C-1 C1.30 CA SG i FDW-1 ' MT/UT ' iSI-0401-C-1 'C2.21 I C-B 1 1 SG MSWi1 2 MT/UT ISI-0401 -C-1 ' C2.21 ? 'C-B + ^ RHRS ' RHRW-14 A ' 1 PT/UT ISI-0289 C-1 I C2.21 i C-B ^ RHRS RHRW-15 A ~ ^ '2 I PT/UT ISI-289-C-1 C2.21 ' CSS CSHXW-1-B 3 ' PT/UT ist-0463-C 1'.i _ [ C 2.21 ' ~ C-B ~ C B[ _ CSS _ CSHXW-2 8 3 PT/UT ISI-0463-C-1 C2.21 C-B SIS' BIT-5 2 MT/UT ISI-0074-C-1 C2.21 ' C-B ~ BIT-2 SIS} _ FDW-1-IR_ [3 MT/UT .lSI-007'4-C-1 _'C 2. 21[._,. ~ C-B SG t 1 i UT ISI 0401-C-1 C2.22 C-B i SG~ [ [MSW _1-IR' _ [2 2 UT _ ISI-0401-C-1_ [ [C2.22} ~} _ ~ [CJB j .UT RHRS _RHRW 14-_A-IR _ l 3.. UT ISI-0289-C-1 C2.22 _ {_ _C-B__ ISI-0289-C-1 C2.22 i 4 _. RHRS ! RHRW-15-A-IR I l C-B CLASS 2 BOLTING 1 SIS BITMWCB401 16) 1 i UT ISI-0074-C-1 i C4.10 C-D 29 U2RAIJCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL 0 ET SYSTEM IDENTIFIC ON NUMBER PERIOD METHOD gyygE N M ER CATEGORY CLASS 2 - l EQUIPMENT SUPPORTS I SG CVCS ~ ' ~ SGH-1-1 1 VT-3 ISI-0401-C-2 F1.40 F-A 1 SWFH:1~ 1 VT-3 ' ISI-0459-C-1' I ' F1.40 'Fd ~ ~ ~ _CVCS"_[ [ SWIFHjA [ [1 { VT-3 ISI-0457-C-1 [ _ F1.40 ~ ~ [ F{A _. CVCS. CCPH 2A-A 1 1 VT-3 ISI-0467-C-1. F1.40 F-A ~ RHRS I~ ~RHRHXH-1_8 ^~ _f2 } ' ' VT-3 { ISI-0289-C-1[ ], 'F1MO ~}"]~ ~~~ F-CSS CSHXH-B-1 3 VT-3 ISI-0463-C-1 i F1.40 1 F- . SIS BITH-1[. _ _ j 3 VT-3 ' Isl-0074-_C-1[ { }F1.40[_ I[__[F-A - ~ ~ ~ RHRS y RHRPH-2A _A SIS..L _ _ - _ __ SIPH A _ j 2 VT-3 ISt-0352-B-1 j_ F1.40 F-A. j 2 VT-3 ISI-0471-C-1 F1.40 ._ _ CSS._[ CSPH_ A 3 VT-3 ISt-0465-C-1 F1.40__ F-A J F-A CVCS SWHXH-1 2_ F-A VT-3 ISI-0461 C-1 F1.40 INTEGRAL, ATTACHMENTS _.._ C3.10 i C-C_ ~I PHRS i RHRHXH 18-A-IA 2 PT ISI-0289-C 1 i l _ CSS _'[ _CSHXH B 1-_lA 3 PT ISI-0463-C-1 '} _C3.10 C-C l C3.10' l ~ 'C C-CVCS SWHXH-1 -l A 2 PT ISI-0461-C-1 + CVCS I ~~SWFH-1 IA 1 PT iSI-0459 C-i ^ ~C3.10 C-C ~ ~ ' ~ ~ l ~~SWIFH-A-IA [ i } P_T ISI-0457 C-1 [_ _ C310~ [ ~ ~C'-C~ ~ CvCS SIS _ BITH-_1 -I A__ _g_ 3 MT ISI-0074-C-1_j _C3.10 CVCS ____,_CCPH 2A-A-IA 1 PT ISI-0467-C-1 C3.30 C-C,, C-C i 1 e i j l t 30 U2RAtJCG XLS 8/28/06 1

i SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL SYSTEM IDENTIFIC 0 NUMBER PERIOD METHOD NUM E N M ER CATEGORY CLASS 3 EQUIPMENT SUPPORTS __F1.40 _ . _ F-A_ _ ACCWS .SDBRWCH;A q VT-3 ISI-0455-C-1 L _ _. 1 ACCWS; __. CWASH-A 1 VT-3 ISI-0479-C-1 F1.40 F-A CWCPH-B-B 1 l VT-3 ISI-0473-C-1 F1.40 __ j ,_ - A F ACCWS ' ERCWS 'ERCWSH 11 1 VT-3 ISI-0268 A-1 F1.40 F-A F1.40[ [ CCS CCWPH-1 2 VT-3~ ISI-0260-A-1 F-A 4 CCS. CCHXH 2A1 2 VT-3 j ISI-0261 B-1 F1.40 F-A CCS 2-CCSTISlH-1B. 2 VT-3 ISI-0227 B-1 F1.40 i F-A CCS' 2-LHXISiH 1 2 VT-3 ' _ SI 0257-A 1 F1.40 F-A ~ L I ERCWS ERCW STR-2A 2 VT-3 ISI-0481 -C-1 F1.40. F-A 1 CCS ~~ ~ 2-ECH-1' ~ 3' VT-3 ISI-0226-C-1 ' F1.40 ^^ iFA CCS' 2-DCH-1 3 i VT-3 ISI-0226-C-2~~ I F1.40 ? ~ F-A CCS ~I VT-3 ISI-0226-C;3 I F1.40 ' l~ I 2-EVAPISlH-1 3 FA t I AFWS '2-AFDPH 2 -S 3' ~' VT-3 ISI-0475-C-1 F1.40 ~ I FX [ _ 2 AFDPH 2A-A 3 I VT-3 ] iSI-0477 C-1 F1.40 [ ~ F-A ~ '~ AFWS __ CSS 2-_ERCWISlH-A 1 _3 _VT-3 [ ISI-0463-C-1_ _ F1.40 F-A F1.40 1 F-A RHRS ! RHRHSXH-1-A i 3 VT-3 ISI-0291-C-1

  • ~

'~~ ~~' INTEGRAL ATTACHMENTS '~ CSS I 2-ERCWISlH A-1-lA 3 VT-1 ' ISI-0463-C-1 ' ~ D1'.10^ ~ ~ ~ ^ ~ ~ ~ ~ D-CCS' I~~ _21HXISlH 1 lh - T 'I 2 .. ".~VT-1 .-.! ~ ISi-0257 A 1 ~- _. __ D 1.10~ ~~b-1

  • ~~

^ ~ 'CCS ERCWS' ' 2-CCSTISlH 18-1 ~ 2' ' ^ 'VT-1 I ~lSI-0227-B-1 ' D 1.10' 'I~ D AT~ ERCWSH-111i4 ' 1' i ~ VT-1 ' 151-0268 ^-i D1'.10 ' ' ~ D -h~ ~ ~ "~ t ~^CCWS I ~ ~ ^~ACCWS ' ! '~SDBR5NCH A-iA '~ l' ' VT-1 ISi-0455-C-1 " ' ~' D 1.10 ' D~ ~ ~ CWASH'- -in 1 VT-1 ISI-0479 C-1 ' D 1.10 D A' I RHRS RHRHSXH 1-A lA ' 3 VT-1 ISI-0291-C-1 D 1'.10 D-h l ~ ERCWS' i 'ERCW-STR-2A lA I ~ l 2 VT-1 ' ' ISI-0481-C 1 D1.50 ' D-A 1 I I l 31 U2RAUCG,XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 4 SECONDINTERVAL - SYSTEM IDENTIFIC ON NUMBER PERIJD METHOD NUMBE N M ER CATEGORY CLASS 3 PlPING SUPPORTS ACCWS SUPPORTS FUNCTION "A

  • ACCWS 47A920-31 -72 1

VT 3 ISI-0451 C-1 I F1.30A F-A FUNCTION "B" 2 VT-3_ ISI-0451-C 1 _ F1.308 F-A i ACCWS 47 A920-31-51 1 [ _ ' F-A ACCWS '47A920 31-50 3 VT 3 ISI-0451-C-1 F1.308 i AUXILIARY FEEDWATER SUPPORTS FUNCTION "A" j AFWS : 2-AFDH 343 1 ' VT-3 ISI-0146-C-1 I ~F1.30A I F-I j kNV/3 2-AFDH 234 1 VT-3 ISI-0146-C-6 [' [F1.30A { ~ F_ T AFWS~ ~2-FDH-336 __ 2 VT-3 ISI-0146-C-4 F1.30A F-A _ 2 hFDH _306 } [._,_2 ~ [ VT-3 AFWS 2 AFDH-293 l _3 VT-3 ISI-0146-C 1 ~ [ [F'1.30lA __ [ [ lF{d[ _ _ FWS,' ~ i ISI-0146-C-3 _ l F1.30A i F-A 3 AFWS _ 2-AFDH-324 _ 3 VT-3 _. ISI--0146-C-3 F1.30A._ FUNCTION *B" ' l l [ _l ~ F-A__ 1 _} __ d AFWS 2 AFDH-283 _1_ [ _ VT-3 ISI-0146-C-3 [_ F1.30B l .FA_ AFWS : 2-AFDH-327 2 i VT-3 ISI 0146-C-3 F1.30B F-A [ _ ~ 2 AFDH 31T 7 ^ ' 2 VT-3 ISI-0146-C-1 ' F1.30B F-A AFWS AFWS ! ~47 A42 7-7-2 3 VT-3 ISI-0146-C-8 F1.30B F-AFWS 2-AFDH.3' 8~ I 3 l VT-3 ISI-0146-C-1 F1.30B FUNCTION "C" _ F-A[ _ 4 AFWS. 2-AFDH 320 I 1 VT-3 ISI-0146-C-3 F1.30C' F-A AFWS 1 2-AFDH-228 3 VT-3 ISI-0146-C-8 ~ I F1.3 C ~ ' * ~ ~h ~~ F- ~ ~ i 'dFWS ~ 2-dFDH 299 2 VT-3 ~lSI-O'146-C-4 F1.30C ~ ~ F-d~ ' ' l 'AFWS' ' ' ~2-AFDH-239 ' ISI-Oi~ 6-C-7 { _F1.30C [ _ F-A(( '] 3 VT-3 i 4 l FUNCTION "D" ~ ] ISt-0146 C' 5 F1.30D ' [ F-k][ AFWS ! 2-AMSH-d8 2 ~ VT-3 ~ 1 AFW INTEGRAL ATTACHMENTS AFWS. 2-AFDH-320-IA' 1 VT-1 i ' lSI-01 '46-C-3' i D1.20~~~ ~ DJ i FWS... I. ' - _~ ~. ~2 .- I.2'- i.20-1 ~. D-h ~ ~ I FdiU311-lA ~ VT-1 ! ~ 'lSI-0146-C-1 D COMPONENT COOLING SUPPORTS I ~ ~ ~ CCS 1-CCH-703 2 VT-3 ISI-0154-C-2 ' F1.30A F-A 'CCS 1-CCH-599 ~ 2 I VT 3 ' ISI-0154-C-2 I F1.3 A ~^F-A ISl 0154-C-3 ' l F i.30 F-A CCS ~1-CCH 586' 1 VT-3 2 ~ ^ CCS 1-CCH 727 2 VT 3 ISI-0154-C-4 F1.30^ F-A CCt; 1 CCH 604 3 VT-3 ISI-0154-C-7 F1.30A F-A CCli 1 -CCH-71'1 3 VT-3 ISI-0154-C-2 F1.30A F-A CCf. 1 -CCH-422 3 V T-3 ISI-0154-C 1 F1.30A F-A CC3 1 CCH-579 i VT-3 ISI-0154-C 2 F1.30A F-A ^ CCS 1 -CCH-715 1 ~ VT-3 ISI-0154-C-2 F1.30A ~ F-h FUNCTION 'B' CCS 1 -CCH-455 2 VT-3 ISI-0154 C-1 ' F1.30B F-A CCS ^ 1-CCH-723 I 2 VT-3 ISI-0154-C-2 Fi.308 ' F- -

  • ~

~ ^ CCS 1-CCH-649 '2 VT-3 ISI-0154-C-6 ' F1.30B ' ~ T ' F-CCS 1-CCH-490 I 1 VT-3 ISI-0154-C-3 F1.308 F-h CCS 1 -C'C H-545 3 VT-3 ISI-0154-C 3 F1.30B ' ~ F^ I 1 CCS 1 -CCH-495 ~ 1 VT-3 ISI-0154-C-3 F1.30B ' I F-A 32 U2RAIJCG.XLS 8/28/96 .m

SEQUOYAH NUCLEAR PLANT UNIT 2 SECOND INTERVAL T SYSTEM ' IDENTIFIC TONNUMBER PERIOD METHOD gyygE N MBER CATEGORY l ISI-0154-C-1 F1.30B F-A l CCS l-CCH 425 3 VT-3 4 CCS~ I ~21 CC'H 593' 3 VT-3 ' ISI 0154 C-2 I ' F1.308 ' ^ ~ FM I J ^ ~ ~ ~ - CCS I ~~1-CCH 608 3 ~ VT-3 ISI-0154 C-7 F1.30B~ IFA ) CCS ' 1 -CCH-582 1' VT-3 } _ ISI-0154-C-2 F1.30B ~ F-A 4 FUNCTION "C" [ VT-3 _[ ISI-0154-C-1 F1.30C_ _. CCS_ j _1;CC H_-4_14 [ 1 F_- A _, _ F1.30C F-A_. CCS 2-CCH-734 2 i VT-3 ISI-0154-C-4 ^l [ _ _ l ~ } _ ~ j __ [ ^~ __[ j FUNCTION "D" ' . CCS _ _ ( _ _ _ _1-CCH;75_3 CCS 4 1-CCH-403_. _ _ _1 VT-3 j ISI-0154-C-5 { _F1.30D__g _ F-A_ l 3 VT-3 ISI-0154-C 1 F1.30D F-A i CCS INTEGRAL. ATTACHMENTS l CCS_ [ _1 -CCH-727-I A[ 1 'VT-1 ISI-0154-C-4 D1.20' ~ ~ A'~~~ D ~ CCS 1-CCH-403 lA 3 VT-1 ISI-0154-C-1 D1.20 D-A i '~ ~ C S ' 1'-CCH 582-lA 2 1~ VT-1 ~ Isi 0154-C-2 ' I D1.20 1 D'- l ~ ~ C CCS[! _1}CCH-425-IA '2 VT-1 ISI 0154-C:1 ' D1.20 ] _ D- ~ ~' CCS 1-CCH 593-IA i 3_ [ VT-1 ISI-0154-C-2 D1.20 _ D;A ESSENTIAL RAW COOLING WATER SUPPORTS I FUNCTION "A " t ERCWS 1-ERCWH-515 1 VT-3 , ISI-0158-C-12 F1.30A F-A ERCWS' ' ~ '2 ^FDH 203 '1 ! ~ VT-3 ' ' ISI-0158 C-10 i F1.30A~ ~ ' ~ F-A~ ' ~ ~ I i t ERCWS[ I _ [2-AFDH)208[ [ 1 _. [ VT_-3 _ _ ISI 0158-C-6[ { _ lF1.30h[ [ F-A _ _ _ ER_CWS 1_ERCWH-076 .[ 1 1 VT:3 j ist-0158 C-6 j_ F1.30A 1 . F-A_ _ _ _.ERCWS _ _1-ERCWH-073 [ _ 2._ [ VT-3 ISI-0158-C-7.[ F1.30A j _ _ _ F-A. 2 t ERCWS ' 47A450-3 39 2. [ _ VT-3 j _ lS1-0158;C 8_ { F1.30A_ _ C,F_-A ___ J 3 _ ER_CWS_ g __ _47A450 3 58 j_ FA VT-3 _.1 ISI-0158 C-8 i _F130A___1 ERCWS 1-ERCWH-068 2 i VT-3 ISI-0158-C-7_ _ _ F1.30A F-A i [ERCW'S ~[1fERlC_WH-236[ [ _ 2[_l[ __ VT-3 j _ _lSI-0158-C-7_ l F1.30A 4_ F-A ___ ~ERCWS i 1-ERCWH-240 3 VT-3 ISI-0158-C-7 F1.30A F-A __5RCWS[][~i-[ERCWk2_4i[} [3 l[ VT-3[ (( iSI-O_15sD7 [F1.30 ~ ~ ~ ~k ~ F ERCWS ' 1-ERCWH 132 3 VT 3 i ISI-0158-C-11 i F1.30A i F-A 't~RCWS' 7 ERCWH-129 ' ~ ' I 3~ VT-3 lSI-015'8-C i0 T ~' ~F1.'30A F-A ~ ~ ~'~ i ~ERCWS 47 450 28-04^ l ~~3 VT-3 ISI-0158-C-12 l F1.30A F-A ~ ~ 7 ^ FUNCTION "B" ]" ^ ERCWS 1-ERCWH-267 '2 VT-3 ISI-0158-C-7 ~F1.30B F-A ERCWS $ 1-ERCWH 380 ~ ^ 1 2 VT-3 ISI-0158-C-16 F1.30B F-A i ERC'WS 1 ERCWH-512~ 2 VT-3 'lSI-0158-C-12 i F1.30B ' FJ 1 ~

  • ~

~ ' ERCWH-080 3 VT-3 ' ISI-0158 C-6 F1.30B FA 1-1 ERCWS ERCWS 1-ERCWH-370 3 VT-3 ISI-0158-C-15 I Fi.30B F ~ ^ ERCWS ~ 1-ERCWH 373 ~ ~ ~ F-A i 3 VT-3 ISI 0158-C-15 F1.30B 5RCWS ' ' 1-ERCWH 272 ! ~ 2~ VT-1 ISl O158-C-7 1 F1.308 " F- ~ 1 i ERCWS ' ' 1 ERCWH-342 1 2 VT-1 ' ISI-0158 C-16 i F1.30B I ~ F-ISI-0158-C 7 F1.308 ~i F-^~~~ i ERCWS " 1-ERCWH 376 ' ' 1 VT-3 ~5RCWS[ [ 2-ERCWH-0_16_' 1 [ ~ VT-3 ISI-0158-C-16[ [ F1.30B T ~ ~ F- ~ ERCWS ERCWHDGI-31 t 1 VT-3 ISI-0158-C-17 ; F1.30B 'F-A ERCWS ERCWHDGi-38' l ~1' ~ i VT-3 ISI-0158 C-17 i F1.30B ~I ' F-A ~ 5RCWS 1-ERCWH-224 ' 1 VT-3 ISI-0158-C-11 ' F1.30B ~ F-h ~ ^ ER'CWS. 1-ERCWH 500 3 V1-1 ISI-0158 C-8 F1.30B I F- ~ ERCWS 1-ERCWH 140 3 VT-1 ISI-0158-C-10 F1.308 F-A ERCWS, 1-ERCWH-302 3 VT-1 ISI-0158-C-11 F1.308 F-A i ERNC110N "C~ 33 U2RAUCG.XLS 8/28/96

SEQUOYAH NUCLEAR PLANT UNIT 2 SECONDINTERVAL I CO ENT ISOMETRIC ITEM CODE SYSTEM IDENTIFICATION NUMBER PERIOD METHOD NUMBER NUMBER CATEGORY \\ ERCWS 2 ERCWH-020 i 2 VT-3 ISI 0158-C-13 F1.30C F-A FUNCTION 'D * ' F1.30D, F-A ^ [~ _l [ ISI-0158-C 6 ERCWS 1 ERCWH-058 i 3 VT-3 ERCW lNTEGRAt. ATTACHMENTS; . T-1 } ISI-0158-C-7 _ __D 1.20[ ~ DA 1-ERCWH 272-IA _j 2 ERCWS V ERCWS 1-ERCWH 342 IA 2_ VT-1 ISI 0158-C-7 D1.20 .1 1 VT-1 .D-A ERCWS. _ .. ERCWH 512-IA 3

lSI-0158 C-12 ;

D1.20 D-A ERCWS 1 ERCWH 500 IA .3 VT-1 .ISI 0158-C-8 D1.20 DA ERCWS ', 1_ERCWH-140-IA 3~ VT-1 ' lSI-0158-C-10 D1.20 [ D-A ERCWS 1-ERCWH 302-IA 3 VT 1 ISI-0158-C-11 D1.20 D-A ERCWS' 1 ERCWH' 224-l'A 1 VT-1 ISI-0158-C-11 D1.20 D-A 34 U2RAUCG.XLS 8/28/96

0-SI-DXI-000-Il4.2 Revision 2 Page 1 of 64 Examination Schedule (Unit 2) Mechanical / Nuclear Engineering A. MAINTAIN a listing of components for ISI examination. B. UPDATE listing as necessary. C. SIGN below. D. FORWARD to SPS for updating Table of Contents, etc. SPS 4 E. FORWARD to DCRM. DCRM j F. DISTRIBUTE per SSP-2.7. i i l { 00h I 8[L3(16 Mechanical / Nuclear Engineering Manager / Designee Date ATT05R02. DOC a

ATTACHMENT 5 0-SI-Dxt-000-I l 4.2 Anachment s TABLE A N'"" 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 2 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PER D ..___-_L -.L B-A Pressure Retaining Welds in Reactor Vessel B-A B1.10 RV Shell Welds Volumetric f_ B-A B1.11 UT 5 100 % 5 0 0 5 ISI-0298-C g n ._ 4 N/A N/A N/A N/A B-A B1.12 Volumetnc None 100 % N/A p I B-A B1.20 RV Head Welds Volumetnc } g. B-A B1.21 RV Head Welds UT (closure and 2 0 0 2 ISI-0298-C p lower) } B-A B1.22 RV Head Welds UT 6 O O l 6 Meridional welds accessible length Permissible ISI-0301-C Included in Partial ~

  • "~ ~
  • "9*

'** ~ 100 % 0 O O O B-A B1.30 UT Weld see See RFR 2-ISI-1 RFR 2-ISi-1 i l UNIT 2 -ATT5AR02.XLS I u

ATTACHMENT 5 0-st-DXI-c30-Il4 2 TABLE A Revision 2 SQN UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 3 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO O l NUMBER TO EXACD ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER f NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P D { RV Head-to-Flange 1 B-A B1.40 ee 0 0 1 ISWM Weld (Closure) RFR 2-ISI-2 _j.._..__ B-A B1.50 Volumetric l Areas > 10% Walt N/A N/A N/A N/A B-A B1.51 Volumetric None All N/A j p i ..._ L. ___._ } 9 B-B , Pressure Retaining Welds in Vessels Other than Reactor Vessels l i. l

      • " "' *"~

B-B B2.10 Volumetric Head Welds essuter N SM-B-B B2.11 UT 2 Both 2 O 1 1 ISI-0396-C to-Head Welds Permissible UNIT 2 -ATT5ARO2.XLS

0-si-Dxi-cDo-l l4.2 ATTACHMENT 5 TABLE A Revision 2 SQN UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 4 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P OD 1 Foot of weld 1 Foot of weld j Pressurizer (one longitudinal hen to Head

        1. '"9 B-B B2.12 UT 1 Foot of all 2 /1 Foot 0

circ. weld circ. weld ISI-0396-C Intersecting two Permissible g gg Longitudinal Welds circumferential examination examination welds) l .{ _- __ _ p _ 9 I i essu&er hem B-B B2.20 Volumetnc 4 Welds l ._-~.-p-_.-. { One weld per Deferral Not B-B B2~21 ! Volumetric None "^ N/A N/A N/A N/A i Welds Circumferential head Permissible j I ( { PressunzerHead One weM per Deferral Not B-B B2~22 Volumetnc None N/A N/A N/A N/A N/A Welds Mendional head Permissible l t i Steam Generator B-B B2.30 Pranary Side Head Volumetric Welds B-B B2 31 Pn ary S H Volumetnc None N/A N/A N/A N/A N/A h Welds Circumferential i UNIT 2 -ATTSAR02.XLS

0-st-oxl-000-II4 2 ATTACHMENT 5 Anachrnent 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 5 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAC ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PEROO f B-B B2.32 P ary ide H ad Volumetric None N/A N/A N/A N/A N/A [ Welds Meridional ~ * "

  • i O

ISI-0401-C B-B B2.40 UT One weld 1 1 0 Weld each Permissible B-B B2.50 (P mary S Head Volumetric N/A N/A N/A N/A N/A N/A Welds i __p____.__. l Heat Exchangers B-B B2.51 (Primary Side). Head Volumetric N/A N/A N/A N/A N/A N/A E*' I Welds. Circumferential B-B B2.52 (P ary Side) H ad Volumetnc N/A N/A N/A N/A N/A N/A Welds, Meridional Heat Exchangers P*' "**'Y ~ Volumetric N/A N/A N/A N/A N/A N/A B-B B2.60 Tubesheet -to-Head group.100% Permissible Welds Heat Exchangers One foot of one gg B-B B2.70 (Pnmary Side)-Shell. Volumetric N/A weld per group, at N/A N/A N/A N/A N/A PWM Longitudinal Welds each end of shell UNIT 2 -ATTSARO2.XLS

0-st-Dxt-000 ll4.2 ATTACHMENT 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 6 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P R OD Heat Exchangers Volumetric N/A N/A N/A N/A N/A N/A B-B B2.80 Tubesheet-to-Shell group at each end Permissible B-D Full Penetration Welds of Nozzles in Vessels Defenal j ISI-0298-C f ISI-0297-C B-D B3.90. RV Noz-to-Ves Welds UT 8 100 % 8 O O 8 i ISI-0392-C Case N-521 _. _ _ { _.. _ (_ I Deferral Not Isl4)008-C B-D B3.100, UT 8 100 % 8 0 0 8 Secton See Code ISI-0298-C Case N-521 i ISI-0392-C - l. B-D lB3.110 UT 6 100 % 6 2 2 2 ISI-0396-C i l } B-D B3.120 UT 6 100 % 6 2 2 2 ISI-0396-C R n l N/A B-D B3.130 Volumetric None 100 % N/A N/A N/A N/A I l UNIT 2 -ATTSAR02.XLS

0-si-Dxi-000-i l4.2 ATTACHMENT 5 Attichment 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 7 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL - INTERVAL INTERVAL PERIOD PERIOD PER OD SG Pnmary Side Deferral Not B-D B3.140j Nozzle inside Radius UT 8 100 % 8 2 2 4 ISI-0401-C p l Section I Heat Exchanger Deferral Not B-D B3.150' Primary Side Nozzle-to-Volumetric N/A 100 % N/A N/A N/A N/A N/A p Vessel Welds Heat Exchanger-B3160lPnmary Side Noz inside Volumetric N/A 100 % N/A N/A N/A N/A N/A B-D p Radius Section B-E ' Pressure Retaining Partial Penetration Welds in Vessels _. d. _ _. _. { _ _ _. _ _ __ __.. _ B-E B4.10 Visual Welds 8' enal B-E B4.11 VT-2 25 % 0 0 Welded Nozzles (4 UHl.1 Vent) (1 UHI,1 Vent) Permissible (1 UHi,1 Vent) IS14318-C B-E B4.12 VT-2 78 25% 20 O O 20 Noz Permissible ISI-0300-C h UNIT 2 -ATTSARO2.XLS

s ATTACHMENT 5 0-SI-DXI-000-I l 4.2 Anactani s TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 8 of 64 O NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PR D B-E B4.20 VT-2 78 100 % 78 0 0 78 ISI-0309-A pene a p l B-F Pressure Retaining Dissimilar Metal Welds RV Noz-to-SE - B-F B5.10 Dissi ar i Butt PT & UT 8 100 % 8 O O 8 3 C N-521 RV Noz-to-SE N/A N/A N/A N/A B-F B5 20 Surface None 100 % N/A W P sT 4* Deferral Not B-F B5.30 Dissimilar Metal Socket Surface None 100 % N/A N/A N/A N/A N/A P W ss e Welds e .1 Pressurizer Noz-to-SE g B-F B5.40 Dissimilar Metal Butt PT & UT 6 100 % 6 2 2 2 ISl4396-C p Welds NPS 4" or Larger Pressurizer Noz-to-SE j B-F B5.50 Surface km 100 % N/A N/A N/A N/A N/A PS ss 4" UNIT 2 -ATTSARO2.XLS

~.. ATTACHMENT 5 0-St-Dul-on-1 I 4.2 TABLE A "*NSi"" 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Iage 9 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PER OD Pressurizer Noz-to-SE Deferral N<>t B-F B5.60 Dissimilar Metal Socket Surface None 100 % N/A N/A N/A N/A N/A p Welds

  • ~ ' '

Deferral Not B-F B5.70 Dissimilar Metal Butt PT & UT 8 100 % 8 2 3 3 ISI-0401-C p Welds NPS 4" or Larger Steam Generator Noz-N/A N/A N/A N/A B-F B5 80 Surface None 100 % N/A Bn s Than 4" , Steam Generator Noz-B-F B5.90 ' to-SE Dissimilar Metal Surface None 100 % N/A N/A N/A N/A N/A p Socket Welds Heat Exchanger Noz-to- ,, g B-F B5100 SE Dissimilar Metal PT & UT N/A 100 % N/A N/A N/A N/A N/A Pee 1 Welds NPS 4" or Larger i Heat Exchanger Noz-to-N/A N/A N/A N/A B-F B5110: Surface N/A 100 % N/A s P a 4" Heat Exchanger Noz-to-gg B-F BS 120 SE Dissimilar Metal Surface N/A 100 % N/A N/A N/A N/A N/A p Socket Welds UNIT 2 -ATT5ARO2.XLS

ATTACHMENT 5 o-s1.oxi-ooo-II4 2 Anachrnent 5 TABLE A SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO BE E M ED EXAM ITEM DESCRIPT!ON IN THE CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST SECOND NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD Piping Dissimilar Metal Deferral Not B-F B5.130 Butt Welds NPS 4" or PT & UT None 100 % N/A Permissible N/A N/A N/A N/A Larger .. -.... ~ Piping Dissimilar Metal al NM B-F B5.140; Butt Welds NPS Surface None 100 % N/A N/A N/A N/A N/A p I LessThan 4"

  • 8' N/A N/A N/A N/A B-F B5.150 Surface None 100 %

N/A g B-G-1 l Pressure Retaining Bolting, Greater Than 2" in Diameter . _ ~. _ - - sure Nuts 8 B-G-1 B6.10 MT 54 100 % 54 18 18 18 ISI-0304-C N/A N/A N/A N/A B-G-1 B6.20 Volumetric o 100 % N/A B6.30 RV Closure Studs > 2" g B-G-1 B6.30 diameter, when MT & UT 54 100 % 54 18 18 18 ISi-03044 p ,,g removed B-G-1 B6.40 RV Threads in Flange UT 54 100 % 54 18 18 18 ISI-0304-C UNIT 2 -ATTSAR02.XLS

ATTACHMENT 5 0-st-Dxt-000-I l4.2 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 1I of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAO ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PER D p RV Closure Washers, B-G-1 B6.50 VT-1 54 100 % 54 18 18 18 ISI-0304-C Note: RV does not have bushings only washers Pressunzer Bolts and Deferral Not Volumetric None 100 % N/A N/A N/A N/A N/A Studs >2" diameter Permissible 6 Pressurizer Flav l 1 S" S Deferrat Not B41 B6.70 Visual N/A 100 % N/A N/A N/A N/A Connection Perm ssible I Disassembled 8 "b Visual N/A 100 % N/A N/A N/A N/A N/A B-G-1 B6 80 B h gs as j. a s N/A N/A N/A N/A B-G-1 B6.90 Volumetnc None 100 % N/A SG Flange Surfaces l gg B-G-1 B6.100 When Connection Visual N/A 100 % N/A N/A N/A N/A N/A p Disassembled i g," ,"9

  • Visual N/A 100 %

N/A N/A N/A N/A N/A B-G-1 B6.110 1 UNIT 2 -ATT5ARO2.XLS

ATTACHMENT 5 0-si-Dxi-eta-Il 4.2 Anachment 5 TABLE A Remon 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 12 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMGER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P R OD Heat Exchanger Flange B-G-1 B6.130 Visual N/A 100 % N/A N/A N/A N/A N/A Disassembled .__p_ .-__. __ _ -~ _ B-G-1 B6.140 " Visual N/A 100 % N/A N/A N/A N/A N/A Bus s .} Studs B-G-1 B6150l Piping Bolts Volumetric None 100 % N/A N/A N/A N/A N/A _._. ] _. a Piping Flange Surfaces Deferral Not B-G-1 B6.160 When Connection Visual N/A 100 % N/A N/A N/A N/A l N/A p Disassembled i "9 B-G-1 B6.170 Visual N/A 100 % N/A N/A N/A N/A N/A and Washers Permissible E" E only if B-L-2 only if B-L-2 only if B-L-2 4 Pumps / 24 selected for one pump / 24 Deferral Not B-G-1 B6.180 UT examination is examination is examination is! ISI-0307-C > 2* dia bolts per pump ' examination under bolts Permissible 4 B-L-2 "'I "'Y ~ "'Y ' f f 4 Pumps / 24 se cted or one pump / 24 Deferral Not B-G-1 B6.190 when connection is VT-1 examination is examination is examination is ISl-0307-C p j disassembled done done done One pump

    • "* "9'*

Visual None N/A N/A N/A N/A N/A B6 200l B-G-1 and Washers examination under Permissible B-L-2 i UNIT 2 -ATT5ARO2.XLS l

0-st-Imi-ooo-ll4.2 ATTACHMENT S TABLE A Reusk>n 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 13 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO O f NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAW 1NG CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PERO B-G-1 B6 210 Volumetnc None or exam na on N/A N/A N/A N/A N/A alve s s> under B-M-2 Valves selected Valve Flange Surface. Deferral Not B-G-1 B6.220 when connection is Visual None for examination N/A N/A N/A N/A N/A p disassembled under B-M-2 ._7_ a B-G-1 B6.230 Visual None orex n N/A N/A N/A N/A N/A under B-M-2 B-G-2 Pressure Retaining Bolting,2" and Less in Diameter l j Reactor Vessel Bolts. Defenal N l N/A N/A B-G-2 B7.10 Studs, and Nuts <= 2" Visual None 100 % N/A N/A N/A p . _.._ f-B-G-2 B7.20 St s and us 2" VT-1 100 % 0 One Manway 0 1S1-0299-B 6 6 i s dia 4 Gen / One Gen / ,f* 2 Manways / One Manway 0 One Manway ISI-0299-B 7g* VT-1 2 Manways/ B-G-2 B7.30 under B-B j i 1 Heat Exchanger Bolts. Deferral Not B-G-2 B7.40 Studs, and Nuts <= 2" Visual N/A 100 % N/A N/A N/A N/A N/A p dia j UNIT 2 -ATTSAR02.XLS

0-SI-Dul-ooo-ll4.2 ATTACHMENT 5 TABLE A Pem n2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 14 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO ^ '" IBE EXAMINED ISI DRAWING EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P OD l 9 "** B-G-2 B7.50 Visual Nuts <= 2* dia }._ l 8 B7.50 CVCS VT-1 4 100 % 4 1 1 2 MSG-0008-C B7.50 RCS VT-1 5 100 % 5 1 2 2 ISI-0013-C j _ _ _. ~ p N/A N/A N/A ISIN3-C B7.50 RHR VT-1 NONE 100 % N/A -1 B7.50 SIS VT-1 4 100 % 4 1 1 2 ISI-0002-C . _ _ _ -- _ - } - "* E"*P Only if B-L-2 Only if B-L-2 Only if B-L-2 E' ne set 12 bolts, selected for One pump / Deferral Not y B-G-2 87.60 VT-1 and Nuts <= 2* dia the other set 8 examination under 2 Sets Permissible done done done i-I B-G-2 87.70 Visual and Nuts <= 2" dia One valve

  • d B7.70 CVCS VT-1 NONE N/A N/A N/A l

N/A MSG-0008-C B-M-2 j_ One Group / Only if B-M-2 Only if B-M-2 Only if B-M-2 [,P # one valve per examination is examination is ; examination is ISI-0013-C 87.70 RCS VT-1 gr up done done i done B-M-2 r UNIT 2 -ATT5AR02.XLS a

- _ _ _..~. - - -. _. -. ATTACHMENT 5 0-SI-Dxt-ooo-Il4 2 TABLE A SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD P D Three Groups / Only if B-M-2 Only if B-M-2 Only if B-M-2 Three Groups / B7.70 RHR VT-1 " " *

  • P

exam n is exam n tionis exami on is ISI-0003-C enmin r s ~ Two Groups / Only if B-M-2 Only if B-M-2 Only if B-M-2 P examination is exami on is. examination is ISI-0002-C B7.70 SIS . VT-1 onev e per B-M-2 l Bolts, studs,and B-G-2 ' B7.80 l H us4 Bons, Visual None N/A N/A N/A N/A N/A Studs, and Nuis housing when Permissible disassembled B-J jPressure Retaining Welds in Piping Surface B-J B9.10 NPS 4" or Larger and Volumetric l Piping NPS 4* or Larger l CircumferentialWeldsy enal t 89 11 RCS Main PT & UT 45 25% 12 4 4 4 ISI-0008-C Permissible 70 89.11 ! RCS PT & UT inct t 25% 18 5 6 7 Auxiliary Head l ~ { Adapter welds. i 1 UNIT 2 -ATTSAR02.XLS

ATTACHMENT 5 0-st-Dxt-000-Il4.2 Anachment 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 16 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PER OD _____.}._.___ I B9.11 RHRS PT & UT 45 25% 12 4 4 4 ISI-0003-C 6 7 6 ISI-0002-C 89.11 SIS PT & UT 73 25% 19 9 "9 B-J 89.12 C None N/A N/A N/A N/A N/A N/A N/A N-524 I B-J B9.20 Less Than NPS 4" Surface t Piping Circ. Welds B-J 89.21 3 Less than NPS 4" 89.21 CVCS PT 62 25% 16 5 5 l 6 ISI-0009-C a ot I l-0008-C B9.21 RCS PT 20 25% 6 2 1 2 Permissible ISi-0013-C } 3 4 3 ISI-0002-C B9 21 SIS PT 39 25% 10 Longitudinal Piping Code B-J B9.22 Welds Less than NPS Case None N/A N/A N/A N/A N/A N/A N/A 4" N-524 UNIT 2 -ATT5AR02.XLS

0-si-Dxi-ooo-II4.2 ATTACHMENT 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 17 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PE OD j. ___. ran Pe N B-J B9.30 Volumetric Piping Branch Surface B-J 89 31 Connection Weids NPS and i 4" or Larger Volumetric .... _ __ j. _ _. _.. a B9.31 CVCS PT & UT None 25% N/A N/A N/A N/A ISI-0009-C __.l q ___ _ ~_.. ____ .} g l 1 RCS PT & UT 2 25% 1 0 0 l B9 31 Permissible ISl4013-C _ _._ f __ _ _. .____q_.___. 8 B9.31 RCS Main PT & UT 1 25% 1 0 1 0 i ISI-0008-C __ }. - {. _.- _._. _..__. j 0 1 0 ISl-0003-C B9 31 RHRS PT & UT 3 25% 1 B9 31 SIS PT & UT 5 25% 2 '"*k" 1 0 1 ISI-0002-C Permissible j Piping Branch j B-J B9 32 Connection Welds Less Surface i l than NPS 4" enal t 89.32 CVCS PT 4 25% 1 0 0 1 Permissible ISI-0013-C enalN t ISI-00084 B9 32 RCS PT 11 25% 3 Permissible ISI-0013-C ~ ! 89.32 RCS Main PT 12 25% 3 1 1 1 ist-0008-C UNIT 2 -ATT5AR02 XLS

..m o-si-Dui-c30-114.2 ATTACHMENT 5 TABLE A Revision 2 SQN UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 18 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING r CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PR D 1 0 0 ISI-0003-C B9.32 RHRS PT 2 25 % 1 89.32 SIS PT 11 25% 3 1 1 1 ISI-0002-C B-J B9 40 Piping Socket Wekts Surfa ~ _ _ _ B9 40 CVCS PT 238 25% 60 20 20 20 __ _ _ _ { _._ _ ~ 89 40' RCS PT 70 25% 18 ""*k" 6 6 6 Permissible ISl4)013-C a t 89.40 RHRS PT 18 25% 5 1 2 2 ISI-0003-C B9 40 SIS PT 170 25% 43 14 15 14 ISI-0002-C B-L-1 Pressure Retaining Welds in Pump Casings B-L-1 B12.10 Pump Casing Welds Volumetric None Ca 81 N/A N/A N/A N/A N/A P (Note Unit 1 only) UNIT 2 -ATT5ARO2.XLS

0-st-Dxt-ooo-114.2 ATTACHMENT 5 TABLE A Revision 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT l' age 19 of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO BE E ED EXAM ITEM IN THE DESCRIPTION CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST SECOND NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD B-L-2 Pump Casings At least one pump

    • 9 "E '

Deferral Only if pump Only if pump Only if pump Pump Casing BM B12.E VT-3 4 pump n One Pump Internal Surfaces Permissible disassembled disassembled disassembled maintenance. BG1 Pressure Retaining Welds in Valve Bodies a es s an M B-M-1 B12.30 Surface None a g up of N/A N/A N/A N/A N/A P s g valves. B-M-1 B12.40 Volumetric None a g up f N/A N/A N/A N/A N/A p valves. l t UNIT 2 -ATTSAR02.XLS

ATTACHMENT 5 0-SI-DXI-c30-114.2 Auachment 5 TABLE A Revision 2 SON UNIT 2 CLASS.1 SCHEDULE PLANNING DOCUMENT Page 20 of 64 t NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO., METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD i-P OD h B-M-2 Valve bodies Visual l ! B12.50l l Internal Surfaces __}_______.. l At least one valve l in each group of One Group / Deferral Only if Only if Only if j B12.50 RCS VT-3 One Group valves when one valve per Pessh hsMid hMW ! hsMW. disassembled for group l t-l maintenance. [ I -_ 4 -.. At least one valve in each group of Three Groups / 9 Deferral Only if Only if Only if j B12.50, RHR VT-3 Three Groups valves when one valve per ^"" Permissible disassembled disassembled disassembled. disassembled for group I 1 maintenance. l l _ _. 4 i..-_.____ l i f At least one valve in each group of Two Groups / 812.50;j Deferral Only if Only if Only if SIS VT-3 Two Groups valves when one valve per Permissible disassembled disassembled disassembled j disassembled for group i i maintenance. UNIT 2 -ATTSAR02.XLS

ATTACHMENT 5 0-st-Dxi-000-I I 4.2 Anactinient s TABLE A Reson 2 SON UNIT 2 CLASS 1 SCHEDULE PLANNING DOCUMENT Page 2I of 64 NUMBER OF TO BE NUMBER TO DEFERRAL OF NUMBER TO NUMBER TO EXAM ITEM EXAM COMPONENTS EXAMINED BE EXAMINED INSPECTION BE EXAMINED BE EXAMINED ISI DRAWING CAT. NO. METHOD IN ITEM DURING IN THE TO END OF IN THE FIRST IN THE THIRD NUMBER NUMBER INTERVAL INTERVAL INTERVAL PERIOD PERIOD PER D k _..-.__._L-_ .{ B-N-1 Interior of Reactor Vessel ^ #*** B-N-1 813.10-VT-3 1 1 1 1 1 ISI-0298-C areas Period Perrnissible ._._g__ B-N-2 Integrally Welded Core Support Structure and Interior Attachments to Reactor Vessels B-N-2 B13.50 Visual None Accessible welds N/A N/A N/A N/A N/A g p ._{___-.-.-_._ B-N-2 B13 60 VT-3 6 Accessible welds 6 O O 6 ISI-0298-C P B-N-3 Removal Core Support Structures Accessible Defenal B-N-3 813.70. Structure Accessible VT-3 1 1 0 0 1 ISi-02984 p l Surfaces B-O Pressure Retaining welds in Control Rod housing B-O B14.10 UT I using dun 2 O O 2 Housings Peripheral Permissible ISI-0300-C Housings UNIT 2 -ATT5ARO2.XLS =

ATTACHMENT 5 0-sI-Dnt-ooo-114.2 Attac nt 5 TABLE B SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT EXAM ITEM TO BE EXAMINED FREQUENCY OF ISI DRAW 1NG CAT. NO. DURING INTERVAL EXAMINATION NUMBER ITEM NUMBER INTERVAL FIRST PERIOD sECOND PERIOD THIRD PERIOD C-A Pressure Retaining welds in pressure Vessels Pressure Retaining C-A C1.10 Shell Circumferential Volumetric Welds ---y 1 C1.10 Steam Generator UT 3 weld per SG nte n discontinuity transition cone girth weld) 2 RHRHXI All in one vessel l C1.10 UT 1 weld per at structural 1 O 1 0 ISI-02894 Heat E@nger RHRHX discontinuity 2 CSHXI Allin one vessel "*""*" F8Y C1.10 UT 1 weld per at structural 1 O O 1 ISI-0463-C Heat Exchanger CSHX discontinuity l C1.10 UT at s ura 1 0 0 1 ISI-0461-C Exchanger 1 weld discontinuity l 0 1 0 ISI-0459-C C1.10 Seal Water Filter UT at structura 1 discontinuity ? UNIT 2 - ATTSBRO2.XLS

0-st-oxi-ooo-114.2 ATTACHMENT 5 Anaciunent 5 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 23 of 64 TO BE EXAMINED FREQUENCY OF ist DRAWMG EXAM ITEM DEsCRPTK)N EXAM METHOO COMPONENTsM EXAMetED M THE NUMBER EXAMMATION ITEM NUMBER INTERVAL FIRsT PERIOD sECOND PERIOD INGRD PERIOD SealWater injection 2 SWIF/ Each inspection C1.10 UT at structural 1 0 1 ISIMM Fh gp Interval discontinuity C1.10 V lumetnc None at s ructura N/A N/A N/A N/A N/A T discontinuity Pressure Retaining C-A C1.20 ! Head Circumferential Volutretric I Welds ._ [ l Head-to-Shell C1.20 Steam Generator UT 1 weld per SG nte "* ~ ~ Each inspection Residual Heat Removal 2 RHRHXI1 Heat Exchanger weld per RHRHX Interval vessel a ns m UT None ,no N/A N/A N/A N/A ISI-0463-C g,, "g C1.20 vessel a ns on C1.20 UT , n one 1 0 0 1 ISI-0461-C E a vessel Head-to-Shell U" C1.20 Seal Water Filter UT Welds one 1 0 1 0 IS14)459-C i UNIT 2 - ATTSBRO2.XLS

. - ~.. _. - ~ - ~.. _ - _ _ 0-SI-Dxr-000-I I4.2 ATTACHMENT 5 -TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 24 of 64 TO BE EXAMINED FREQUENCY OF IS4 DRAWING EXAM ITEM DESCRIPTION EXAM METHOD COMPONENTS IN DURING INTERVAL EXAMINATION NUMBER CR M ITEM IW NR INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOD Head-to-Shell '"*E' C1.20 UT Welds,in one 1 O O 1 ISI-0457-C Filter per SWIF Interval vessel Head-to-Shell

    1. I"# "

C1.20 UT Weids, in one 2 1 0 1 ISt-0074-C Pump Tank 2 welds Interval vessel Tubesheet-to-shell C-A C1.30 Volumetric Tubesheet-to-E "*E' C1.30 Steam Generator UT Shell Welds,in 1 1 0 0 ISI-0401-C S one vessel Tubesheet-to-

  • I"**

C1.30 Volumetric None SheliWelds,in N/A N/A N//, N/A ISI-0289-C Heat Exchanger one vessel 2CSHXI Tubesheet-to- '"*E*' C1.30 Volumetric 1 weld per ShellWelds,in 1 0 0 1 ISt-0463-C "Y 8' Heat Exchanger CSHX one vessel ~_ Tubesheet-to-Each inspection Volumetric None ShellWelds,in N/A N/A N/A N/A ISI-0461-C Seal Water Heat Exchanger one vessel _ ~. Tubesheet-to-C1.30 Seal Water Filter Volumetnc None ShellWelds,in N/A N/A N/A N/A ISI-0459-C Interval one vessel UNIT 2 - ATT58R02.XLS

ATTACHMENT 5 0-si-Dul-ooo-114.2 Attactunent 5 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 25 of 64 i EXAtt ITEM TO BE EXAMINED FREQUENCY OF 151 DRAVIANG DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE g ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOD Tubesheet-to-SealWater IWn C1.30 Volumetric None Shell Welds, in N/A N/A N/A N/A ISI-0457-C Filter I" * **' one vessel c C-B Pressure Retaining Nozzle Welds in Vessels ..-. y 7 C-8 C2.10 i 1/2" nominal thickness i (or Head) Weld in C-B C2.11 Vessels <= 1/2" thk, Surface and Nozzles Greater i thanS NPS All nozzles at SealWater Heat terminal ends of Each inspection PT Now N/A N/A N/A N/A ISl-0461-C Exchanger piping runs in one Interval vessel AH nozzles at 8' *

  • C2.11 Seal Water Filter PT None N/A N/A N/A N/A ISI-0459-C piping runs in one Interval vessel All nozzles at Seal Water ingection I*" "8I Ea ns on C2.11 PT None N/A N/A N/A N/A ISI-0457-C Filter piping runs in one na i

vessel I i UNIT 2 - ATTSBRO2.XLS .m mr. :

0-st-Dxt-000-I l 4.2 ATTACHMENT 5 TABLE B Revision 2 SON UNIT 2 CLASS 2 ECHEDULE PLANNING DOCUMENT Page 26 of 64 l NUMBER OF NUMBER TO BE NUMBER TO BE NUMBER TO BE NUMBER TO BE DESCRIPTION EXAM METHOD COMPONENTS 98 EXAMlNED IN THE EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE DURING INTERVAL EXAMINATION M R FlRsT PERlOO sECONO PERIOD THfRD PERtOO CAT. NO. Nonles without "9 C-B C2.20 vessels >1/2" nominal thickness Nozzles without g C-B C2.21 Reinforcing Plate in j y Vessels > 1rl' thk e +*mw w. -... l 4SGI All nozzles at 2

  • I Steam Generator.

MT & UT ( 1 FW and 1 1 (FW) 1 (MS) 0 ISI-0401-C l C2.21 and piping runs in one Interval MS) 1 MS nozzle vessel j All nozzles at j 2 RHRHXI Each inspecten C2.21,i Residual Heat Removal PT & UT pip ng runs in ne 2 1 1 0 ISI-0289-C 2MsM vessel i i __q___ ~ l All nozzles at j C2'M l Containment Spray

  • "" 8' * *'

'"W " PT & UT 2 0 0 2 I ISI-0463-C i Heat Exchanger 2 nozzles each pping runs in one Interval i vessel i f All nozzles at ! CentnfugalCharging MT & UT 2 2 0 1 1 ISt-0074-C Pump Tank piping runs in one Interval vessel i UNIT 2 - ATTSBR02.XLS

ATTACHMENT 5 0-SI-DIti-000-I t 4.2 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT P.ge 27 of 64 EXAM ITEM TO BE EXAMINED FREQUEEY OF ist DRAWlNG DESCRIPTION EXAM METHOD COMPONENTS IN EXAMlNED IN THE EXAWNED IN THE EXAMNED IN THE EXAMINED IN THE p ITEM NUMBER INTERVAL FIRsT PERIOD sECOND PERIOD THERD PERIOD Nonle inside Radius C-B C2.22 Volumetric Note: only for nonles greater than 12" NPS 4SGI All nonles at C2.22 Steam Generator UT 2 1(FW) 1 (MS) 0 ISI-0401-C and 1 MS nonle piping runs in one Interval per SG vessel All nonles at Residual Heat Removal 2 RHRHX/ terminal ends of Each inspection C2.22 2 0 1 1 IS14289-C Heat Exchanger 2 nonles each piping runs in one Interval vessel All nonles at Containment Spray

  • 'W" UT None N/A N/A N/A N/A ISI-0463-C Heat Exchanger piping runs in one interval vessel All nonles at Centnfugal Charging UT None N/A N/A N/A N/A ISI-0074-C Pump Tank piping runs in one Interval vessel UNIT 2 - ATT5BR02.XLS

~. ATTACHMENT 5 0-St-nxi-ooo-II4.2 TABLE B Revision 2 SQN UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 28 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF ist DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMINATION NUMBER ITEM NtJMBER INTERVAL FtRsT PERIOD SECONO PERIOD THIRO PERIOD Nozzles with reinforcing C-B C2.30 plate in vessels > 1/2 " nominal thickness Nozzles with All nozzles at Reinforcing Plate in tesinal ends of ad Inspection N/A N/A N/A N/A N/A C-B C2.31 Vessels > 1/2"thk. Surface None Piping runs in one Interval Reinforcing Plate Welds vessef to Vessel & Nozzle All nozzles at Nozzle-to-Shell(or teminalends of Each inspection C-B C2.32 head) Weld when inside Volumetric None N/A N/A N/A I N/A N/A piping runs in one Interval of Vesselis accessible vessel Nozzle-to-Shell(or All nozzles at l '"*P Visual None N/A N/A N/A N/A N/A of Vessel." " C-B C2.33 is piping runs in one Penod j inaccessible vessel l 1 p C-D Pressure Retaining Bolting greater Than 2 inches in Diameter l C-D C4.10 Volumetric & Studs > 2" dia ~~ 100% of one Each inspection C4.10 Steam Generator Volumetnc None N/A N/A N/A N/A N/A component Interval ~ Residual Heat Removal 100% of one 8 I* C4.10 V lumetric None N/A N/A N/A N/A N/A Heat Exchanger component interval UNIT 2 - ATT5 BRO 2.XLS

ATTACHMENT 5 0-st-Dui-ooo-l l4.2 Amhment 5 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 29 of 64 EXAM ITEM TO BE EXAM 0NED FREQUENCY OF isl DRAWING CAT. NO. DURING BNTERVAL EKAMINATION NUMSER ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOD i a nment Spray C4.10 Volumetric None N/A N/A N/A N/A N/A Heat Exchanger component Interva! 8'*'"** C4.10 Volumetric None N/A N/A N/A N/A N/A Exchanger component interval s - __..-- -. y _. _. ~ 100% of one Each inspection C4.10 Seal Water Filter Volumetric None ^ N/A N/A N/A N/A component Interval 4 }._._ eat atedW C4.10 i Volumetric None N/A N/A N/A N/A N/A Fitter component Interval l _ _ ___ j _ _ Centnfugal Charging C4.10 UT 1 CCP/16 bolts 0 0 ISI-0074-C Pump Tank component (16 bolts) Interval (16 bolts) t p__. _ ._ j i Piping Bolts & Studs > 100% of one Each inspection C-D C4.20 yg N/A N/A N/A N/A N/A 2" dia component interval l Pumps Bolts & Studs > C-D C4 30 Volumetric None N/A N/A N/A N/A N/A l C4.40 l 8'#8 Volumetric None N/A N/A N/A N/A N/A C-D 2" dia component Interval UNIT 2 - ATTSBRO2.XLS ~

0-si-Dxi-000-114.2 ATTACHMENT 5 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 30 of 64 EXAM ITEM TO BE EKAMINED FREQUENCY OF ist DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EKAMINED IN THE EXAWNED IN THE EXAMINED IN THE EXAMINED IN THE g' ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERf00 C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping 7.5% of allwelds not exempted by IWC-1220 spread Pressure Retaining over the item Welds in Austenitic See Each Numbers within Stainless Steel or High item Number. this Exam Alloy Piping Category, but not including welds i excluded by wall thickness. Piping welds >= 3/8" l C-F-1 C5.10 nominal wall thickness l for piping > NPS 4" Piping Circ. Welds NPS 3 C-F-1 C5.11 > 4" or Larger and >= g t 3/8" Nom Wall. a inspedon C511 CS PT & UT 141 7.50 % 11 3 4 I 4 ISI-0007-C interval l l UNIT 2 - ATT58R02.XLS

0-st-Imi-oco-114 2 ATTACHMENT 5 TABLE B Revisi n 2 SQN UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 31 of 64 TO BE EXAMINED FREQUENCY OF BSt DRAWING DESCRIPTION EXAM METHOO COMPONENTS IN ERAMINEDIN THE EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAM ITEM NUMBER ITEM NUMBER INTERVAL FIRST PERIOD SECONO PERIOD THIRD PERIOD 5 Note: 64 of these welds are on excluded piping and the remaining 2 Each Inspection ISI-0431-C N/A N/A N/A C511 CVCS PT & UT 66 have limited Interval g3,93g access. Based j on the above these 5 welds will be included in CVCS item i number C5.21 l 1 _______j_ i Ed Inspon 8 isi-0003-C C5.11 RHRS PT & UT 283 7.50 % 22 7 7 Interval l l I" C5.11 SIS PT & UT 334 7.50 % 26 8 9 9 ISl 6 2-C Interval I Code C-F-1 C5.12 Longitudinal Welds Case N/A N/A N/A N/A N/A N/A i N/A N/A l N-524 UNIT 2 - ATTSBR02.XLS

~ -. ~ -. ATTACHMENT 5 0-SI-DXI-000-114.2 TABLE B Revisim: 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 32 of 64 i EXAM ITEM TO BE EXAMINED FREQUENCY OF ist DRAWING DEsCR8PTION EXAM METHOD COMPONENTS IN DURfMG INTERVAL EXAMINATION NUMBER ITEM NUMBER INTERVAL FIRsT PERIOD SECOND PERIOD THIRD PERIOD PiDing Welds >1/5" n m na waH ass C-F-1 C5.20 for piping >= NPS 2

  • and <= NPS 4*

. _ _... ~. _. amferential SMace aM C-F-1 C5.21 ' i Welds Volumetric am InsMction C5.21 CS PT & UT 1 7.50 % 1 1 0 0 Interval ISI-0435-C i -__--._4-.____ 31 t i I Note: This a d ins W on ISW3bC I C5.21 CVCS PT & UT 345 7.50 % includes the 5 10 10 11 Interval ISl4435-C welds from CVCS item number C5.11 _~ a inspdon ISI-0431-C C5.21 RHRS PT & UT 55 7.50 % 5 1 2 2 Interval ISI.0435-C _ _ _ - ~_ I 3'~ C5 21 SIS PT & UT 255 7.50 % 20 6 7 7 Interval IS14435-C Longitudinal C5.22 Case N/A N/A N/A N/A N/A N/A N/A N/A WeMs N-524 UNIT 2 - ATT5 BRO 2.XLS

...~ - . _.=. ~... - - -. ATTACHMENT 5 o-si-tmi-000-i l4.2 TABLE B ReWsion 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUl'AENT Page 33 of 64 EXAM ITEM TO BE EXAMWED FREQUENCY OF 138 DRAWING DESCRIPTION EXAM METHM COMPONENTSIN EXAMMED M THE g_ EXAtHN ATION NUMSER ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOO C-F-1 C5.30 Socket Welds Surface '8 3 C5.30 CS PT 26 7.50 % 2 1 0 1 Interval ISI-0435-C Ead inwon ISl & 31-C C5.30 CVC PT 153 7.50 % 12 4 4 4 Interval ISI-0435-C IS 3K Ea d ins W on f 0 C5.30 RHR PT 6 7.50 % 1 0 1 Interval ISI-0435-C Ead Inspon C5.30 SIS PT 215 7.50 % 17 5 6 6 Interval ISI-0435-C UNIT 2 - ATT5BR02.XLS

ATTACHMENT S o-st-Dxt-CD0-Il4.2 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 34 of 64 EKAM ITEM TO BE EXARMNED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COeAPONENTS IN DURmG INTERVAL EXAMINATION NUMBER ITEM NURSBER INTERVAL FIRST PERIOD SECOND PERIOO THIRD PERIOD Pipe Branch C-F-1 C5.40 Connections of Bs.mch Piping >= 2" NPS Brand ConWm C-F-1 C5 41 Surface Welds >= NPS 2" I i t Ead ins p on 'b'#3 C5.41 .CVCS PT 3 7.50 % 1 1 0 0 ISI-0435-C Interval t l i i i i Ea nspe on C5.41 CS PT 2 7.50 % 1 0 1 0 S ISI-0435-C -- t- _ _ _ _ _..j _. r i 1 Ea s on C5 41 RHRS PT 4 7.50 % 1 0 0 1 -04 ISl-0435-C Ea ns on C5.41 SIS PT 7 7.50 % 1 0 0 1 31 -C ISt-0435-C code C5 42 Longitudinal Welds Case N/A N/A N/A N/A N/A N/A N/A N/A N-524 f UNIT 2 - ATT50RO2.XLS

,_.- -.- ~. -.. _.- 0-si-1)xt-000-114 2 -ATTACHMENT 5 TABLE B Revision 2 SQN UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 35 of 64 L TO BE EXAMINED FREQUENCY OF ist DRAWING DESCRIPTION EXAM METHOD COMPONENTS M EXAMMED M THE EXAMMED M THE EXAMMED M THE EXAMINED M THE EXAM ITEM ,g, ITEM NUMBER INTERVAL FIRST PERIOO SECOND PER600 THIRD PERIOD C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping i 7.5% of allwelds j not exempted by [ lWC-1220 spread over the item Pressure retaining see each item numbers within C-F-2 All l we in carbon or low number this examination u j i a, < ateel piping category, but not including welds excluded by wall thickness Piping welds >= 3/8" C-F-2 C.S.50 nominal wall thickness for piping > NPS 4" l ___ j Piping circumferential welds >= 3/8" nominal gg C-F-2 C5.51 wall thickness for piping > NPS 4" l 7.5%. but not less C5.51 FW MT & UT 71 than 28 welds 11 3 4 4 CHM-2403-C Intemal total for all C-F-2 UNIT 2 - ATTSBR02.XLS

0-si-oxi-ooo-II4.2 ATTACHMENT 5 Attadant 5 1 TABLE B Revision 2 SON UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 36 of 64 TO BE EXAMtNED FREQUENCY OF iSI DRAWING EXAM ITEM DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE NUMBER EXAMINATION ITEM NUMBER INTERVAL FIRST PERIOD SECONO PERIOD THIRD PERIOD 7.5%, but not less Each inspection C5.51 MS MT & UT 122 than 28 welds 18 6 6 6 ISI-0015-C total for all C-F-2 I Code C-F-2 C5.52 Longitudinal Welds Case N/A N/A N/A N/A N/A N/A N/A N/A f N-524 Piping welds >1/5" l "**8 C-F-2 C5 60 None 7.50 % N/A N/A N/A N/A N/A for piping >= NPS 2, Volumetric Interval l and <= NPS 4" j i Piping Circ. Welds Each inspection Surface and C-F-2 C5 61 >=NPS 2" and <= NPS None 7.50 % N/A N/A N/A N/A N/A g,g 4" Code C-F-2 C5.62 Longitudinal Weids Case N/A N/A N/A N/A N/A N/A N/A ( N/A N-524 l l t r C-F-2 C5 70 Socket Welds Surface None 7.50 % N/A N/A N/A N/A N/A Interval i UNIT 2 - ATTSBR02.XLS

ATTACHMENT 5 0-SI-Dxi-000-I I 4.2 Anachment 5 TABLE B "2 SQN UNIT 2 CLASS 2 SCHEDULE PLANNING DOCUMENT Page 37 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF ISI DRAWING DESCR!PTION EXAM METHOD COMPONENTS IN EX*ND IN T12 EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOO THIRD PERIOD Pipe Branch Connection C-F-2 C5.80 of branch piping >= NPS 2" C-F-2 C5 81 Surface Welds >= NPS 2" C5 81 F ev MT None 7.50 % N/A N/A N/A N/A CHM-2403-C ..-.-.l--.-. N/A N/A N/A IS14)015-C C5.81 MS MT None 7.50 % N/A I _.___4__._.. _L. f Code C-F-2 I C5 82 Longitudinal Welds Case N/A N/A N/A N/A N/A N/A N/A N/A N-524 C-G Pressure Retaining Welds in Pumps and Valves 100% of welds in components in Each inspection C-G C610 Pump Casing Welds Surface None piping runs N/A N/A N/A N/A N/A Interval examined under C F. 100% of welds in nen s in Each inspection C-G C6.20 Valve Body Welds Surface None piping runs N/A N/A N/A N/A N/A examined under C F. UNIT 2 - ATTSBRO2.XLS

~. _ ATTACHMENT 5 0-SI-DXINil4.2 Autuneau 5 TABLE C cWoon 2 SON UNIT 2 Ct. ASS 1.2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 38 of 64 -~ NUMBER FREQUENCY OF NUMBER OF TO BE EXAMINATION DESCRIPTION EXAM METHOD COMPONENTS IN % TO BE EXAM 6NED DURING INTERVAL EXAMINED OR ITEM NUMBER IN THE DEFERRAL OF INSPECTION TO INTERVAL END OF WTERVAL PERIOD PERIOD PEReOD D-H All integral Attachments for Class 1 Vessels Reference Code Case N-509 in This Table C-K-1 All Integral Attachments for Class 1 Piping, Pumps, and Valves Reference Code Case N-509 in This Table C-C All integral Attachments for Class 2 Vessels, Piping, Pumps, and Valves Reference Code Case N-509 in This Table '" '8

  • I" * * ' " "

D-A All Reference Code Case N-509 in This Table Shutdown Function Integral Attachments for Class 3 Systems in Support Emergency Core Cooling, D,3 All Containment Heat Removal, Atmospero Cleanup, and Referance Code Case N-509 in This Table Reactor Residual Heat Removal Function integral Attachments for Class 3 Systems in Support of Reference Code Case N-509 in This Table Residual Heat Removal From Spent Fuel Storage Pool B-K of Code Integral Attachments for Class 1 Vessels, Piping Pumps, and Valves Case N-509 B-K of Pressure Vessels 3 Code B10.10 Integrally Welded y C se Attachments N-509 100% of required areas cf each B10.10 Reactor Vessel Volumetric None N/A Each inspection Interval N/A N/A N/A N/A member deformation is identified UNIT 2 - ATT'5CRO2.XLS

ATTACHMENT 5 0-st-Dxt-000-I I4.2 ^

  • h"*"' 5 TABLE C RcWm 2 SON UNIT 2 CLASS 1,2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 39 of 64 NUMBER FREQUENCY oF NUMBER OF TO BE EXAMINATION DESCRIPTION EXAM METHOD COMPONENTS IN

% TO BE EXAMINED OURING INTERVAL EXAMINED OR ITEM NUMBER IN THE DEFERRAL OF peSPEcTION T INTERVAL END OF INTERVAL PERICO PERooD PERIOD 100% of required areas of each pg ppy 810.10 UT I support Each inspection Interval 0 1 support 0 ISI-0396-C Support Skirt 1 support skirt whenever component support g g rnember deformation is identified __. [_. 100% of required areas of each pg pg rs ugs 4 sei miclugs whenever nen rt member deformation is identified l "9" _.____.{_. 100% of required areas of each B10.10 Steam Generator Surface None N/A Each inspedion Interval N/A N/A N/A N/A j member deformation is identified B-K Piping IntegraDy i of Welded Attachments Code B10.20 Surface Case Note: This includes I N-509 Item No. B10.40. 100% of required areas of each welded attachment on 10% of the welded attachments associated with B10 20 CVC PT 10 the component supports selected a Inspede intemal 0 1 0 MSG-0015-C (Note: 34 for examanation and whenever I component support member ) deformation is identified l 100% of required areas of each i welded attachment on 10% of the welded attachments associated with B10.20 RCS PT 6 the component supports selected a inspede Intemal 1 0 0 , MSNM (Note: 15 j for examination and whenever comporient support member deformation is identified UNIT 2 - ATTSCRO2.XLS

o-si-oxi-c00-t t4 2 ATTACHMENT 5 Awheneni 5 TABLE C ai2 SON UNIT 2 CLASS 1,2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 40 of 64 NuMeER FREQUENCY OF NuM8ER OF TO BE EKAMMATION DESCRIPTION EXAM METHOD COMPONENTS W % TO BE ERAMMED OuRWG INTERVAL EXAMINED OR ITEM NUMBER HTHE DEFERRAL OF INSPECTION TO INTERVAL END OF INrERVAL PERIOD PERIOD PERIOD 100% of required areas of each welded attachment on 10% of the welded attachments associated with B10.20 RCS MAIN PT None the component supports selected N/A Each inspection interval N/A N/A N/A ,3 g for examinahon and whenever component support member deformahon is identdied .______p 1 100% of required areas of each 3 welded attachment on 10% of the welded attachments associated with B1020! RHR PT 3 the component supports selected Each inspection interval 0 1 0 MSG-0010-C 4 for examination and whenever l component support member ," PE ) i deformation is identrfied l_. q _ ___ __ -. __ _ . _ - _. _ _ j i l 100% of required areas af each 2 hl welded attachment on 10% of the welded attachments associated with { MSG-00094 B10.20[ SIS PT 13 the component supports selected Each inspection Interval 0 0 2 3 for examinaten and whenever j i component support member l deformahon is identified i 100% of required areas of each B-K I Pumps integrally 3 RCP with welded attachment on 10% of the f Weided Attachments 3 ins on welded attachments associated with of Code B10.30l Surface each pump the component supports selected one pump Each inspecten Interval one pump 0 0 IS14326-C Ctse ? Note Thisincludes (Pumps 1,3 and for examination ard whenever N-509 l Item No. C3 40. 4) component support member deformation is identrfied 100% of required areas of each B-K Included under welded attachrnent on 10% of the of Hem we a n s asWM M Valve Integrally Code B10 40 u ace c mpen supp s A a inspecten intemal WA NA WA N/A Welded Attachments CEse Case for exammaton and whenever N-509 N-509 component support member deformation is identified g UNIT 2 - ATT5CRO2.XLS .a

m.m_ m...___._ _. _ m. L i 0-SI-DXIcc-Il4 2 i ATTACHMENT 5 Amtwn 5 TABLE C 2 SON UNIT 2 CLASS 1,2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 41 of 64 hundeER FREQUENCY OF NuteeER OF TO eE EXAGAMATION D EMMD EMMD WNM j DESCRIPTION EXAa8 RAETHOo COAAPONENTs W % TO eE EMAtAMED DuRMG WTERVAL EXAGAMED OR ITERI NutseER IN THE DEFERRAL OF WsPECTION To i I INTERVAL END OF INTERVAL PERIOD PEMOO PEmOO I l C-C of Code Integral Attachments for Class 2 Vessels, Ploing Pumps, and Valves f Case N-509 f C-C [ of Pressure Vessels Code C3.10 Integrally Welded Surface [ Cose Attachments N-509 l 100% of requwed areas of each welded attachment on one vessel C3.10 Steam Generator Surface None WA Each inspection interval NA NA WA MA and whenever component support member deformation is identehed ( 100% of requwed areas of each Residual Heat Removal 2 RHRHX welded attachment on one vessel. C3.10 PT one RHRHX Each inspection Interval 0 one RHRHX 0 ISl-0289-C i Heat Exchanger 12 IA's each whenever m.W.. support member deformation is identihed { 7 100% of required areas of each i Containment Spray 2 CSHX1 welded attachment on one vessel, C3.10 PT one CSHX Each inspection Interva! 0 0 one CSHX ISI-0463-C Heat Exchanger 4 IA's each whenever component support j t member deformation is idenhfied 100% of required areas of each SealWater Heat Heat exchrager welded attachment on one vessel. Heat Heat C3.10 PT Each Inspechon Interval 0 0 ISt-0461-C / ins whenever component support exchanger exchanger Exchanger e member deformation is identified 100% of required areas of each FilterI welded attachment on one vessel

  • C3.10 SealWater Filter PT Filter Each inspecten interval Filter 0

0 ISl4459-C 4 IA's whenever component support member deformaten is idenhfied 0 NIT 2. ATT5CRO2.XLS

0-si-Dxt-000-1I4 2 ATTACHMENT 5 Anah 5 TABLE C Reit h 2 SON UNIT 2 CLASS 1,2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 42 of 64 NUMeER FREQUENCY OF. NUMBER OF TO SE EXAanNATeoN MAMMED ERAMMED EXA M mNM DEsCRIPfloN EMAM RAETHOD COdePONENTs M % TO SE ERAaENED DURMG INTERVAL EXAIENED OR ITEtt NutseER MTHE DEFERRAL OF INSPECTION TO INTERVAL END oF MTERVAL pef 40D PEROD PEntoD 100% of requwed areas of each C3.10 PT one SWIF Each inspection Interval one SWIF 0 '0 ISI-0457-C Filter 3 ins each whenever compone'd support. member deformebon is identi.ed 100% of requered areas of each C3.10 MT Tank Each inspection Interval 0 0 Tank ISt @ 74-C Pump Tank 4 ins whenever component support member deformahon is idenhfied C-C Pping integrally l of Welded Attachments Code C3 20 Surfem i C:se Note: This includes N-509 Item No. C3.40. 100% of required areas of each welded attachment on 10% of the ISI-0449-C C3 20 CS PT 17 the component supports M a in W 0 0 1 (Note: 10 MSG-0011-C for exammahon and whenever exammed) deformation is identdied l 100% of requwed areas of each f 3 welded attachment on 10% of the welded attachments associated with C3.20 CVC PT 63 the component supports selected Each inspection Interval 1 1 1 ISI-0449-C 23 for exammabon and whenever i ex ) deformaten mr,t d UNIT 2 - ATTSCR02.XLS

I 0-st-DXI-000-t 4 2 ATTACHMENT 5 ^"*'h'nen 5 TABLE C SON UNIT 2 CLASS 1,2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 43 of 64 k NUMBER FREQUENCY OF NUMBER OF TO BE EXARMNATION DESCRIPTION EXAM METHOD COMPONENTS IN % TO BE EXAMINED DURtNG INTERVAL EXAMINED OR ITEM NUMBER IN THE DEFERRAL OF INSPECTION TO INTERVAL END OF INTERVAL l 100% of.wved arreas of each 9 welded attachn.ent on 10% of the welded attachments associated with C3.20 FW MT S the component supg orts selected a insPee Intemal 0 1 0 EME (Note: 7 for exarnination ant'. whenever component suppo6t member ) deformation is identified i . _ _ _. 1, . __.._..._.{ l 100% of required areas of each l 9 welded attachment on 10% of the i I welded attachments associated with C3.20 ! MS MT 10 the component supports selected ach inspection intemal 0 1 0 MSG-001M (Note: 9 for examination and whenever l l component support member ) deformation is identified l 100% of required areas of each 2 welded attachment on 10% of the welded attachments associated with C3.20 j RHR PT 31 the component supports selected inspe n in emal 0 1 (Note: 20 SG for examination and whenever l

  1. "E "*" '

{ examined) deformahon is identified i .._ j 100% of required areas of each 4 welded attachment on 10% of the j welded attachments associated with C3.20 j SIS PT 69 the component supports selected 8 inspecte intemat 1 1 2 (Note: 40 MSG-00094 for examination and whenever component support member deformation is adentified i UNIT 2 - ATT5CRO2.XLS

ATTACHMENT 5 0-sl.Dxi-oc3-114 2 Attachrnent 5 TABLE C Revision 2 SON UNIT 2 CLASS 1,2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 44 of 64 NuRAeER FREQUENCY OF NuegoER OF TO eE EXARMNATioN ^ DEsCMPTioN EXAnd RAETHOD CORIPONENTsIN % TO eE ExAGAlpfED OURmGINTERVAL EXAteNED OR ITERI NuteeER m THE DEFERRAL OF INSPECTION TO INTERVAL END OF INTERVAL PERSOO PERsOO PERsoD C-C of "*E' '"W'D Code C3.30 Surface Welded Attachments l N-509 ~ .---.y-..___._. 100% of requwsd areas of each welded attadiment on 10% of the l Centrifugal Charging 2CCP/ C3.30 PT the component supports selected one pump Each inspection interval one pump 0 0 ISI-0467-C p 4 g,,, for examinatson and whenever l component support member i deformahon is identded -___4___.___ 100% of requwed areas of each welded attachment on 10% of the welded attachments=== ara =And with I ' F*I I C3.30 Surface None the component supports selected N/A Each inspechon interval N/A MA MA N/A "'"E for examenshon and whenever component support member deformanon is identmed 100% of requwed areas of each welded attachment on 10% of the l Residual Heat Removal C3.30 Surface None the component supports selected MA Each inspection interval N/A N/A l N/A N/A p for examenshon and whenever j component support member l deformanon is identmed i .l-100% of requwed areas of each j welded attachment on 10% of the I welded attadiments associated with C3.30 Safety triection Pump Surface. None the w..,~... supports selected N/A Each inspechon Interval N/A N/A N/A N/A for examination and whenever -l component support member j deformahon is identmed UNIT 2 - ATT5CR02.XLS .. -~

ATTACHMENT 5 0-st-oxi-000-114 2 ^"*C8""u 5 TABLE C Revision 2 SQN UNIT 2 CLASS 1.2, AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 45 of 64 NutASER FREQUENCY OF Nut 08ER oF TOBE ExAtAMAfloN DESCRIPTION ExAnd RAETHoD ConIPONENTsIN % To DE EXAa0MED DuRINo MTERVAL ExAhAINED OR ITERA NutABER IN THE DEFERRAL OF INSPECTION TO MTERVAL END oF MTERVAL PERIOD PEIUoO PERooO 100% of required areas of each C-C included under welded attachment on 10% of the of item Number welded attachments associated with

  • **'"'*9'"

Code C3.40 Surface C3.20 cf Code the component supports selected N/A Each inspection Interval N/A N/A N/A N/A ^* Ctse Case for examination and whenever N-509 N-509 component support member deformation is identified D-A of Code Integral Attachments for Class 3 Vessels. Piping. Pumps, and Valves Case N-509 " y__ i of Pressure Vessets Code Dt.10 Integrally Welded Visual Case Attachments f__ N-509 One Heat Exchanger 100% of l i Class 3 required areas of each welded 3 exchanger { ISl4463-C D1.10 Containment Spray VT-1 attachment and whenever Each inspection interval 0 0 ex anger Heat Exchanger component support member deformaton is identified Class 3 All.100% of required areas of each at Ex& anger / W auent aM hw N at D1.10 VT-1 Each inspection interval 0 O ISI-0257-A Letdown Heat 1 IA's component support member Exchanger Exchanger Exchanger deformaton is identified Class 3 100% of required areas of each D1.10 Visual None N/A Each Inspection Interval N/A N/A N/A N/A I Gas Stnpper and M Acid Evaporator component support member Condenser deformation is identified i UNIT 2 - ATT5CRO2.XLS 2

ATTACHMENT 5 0-SI-oxl-cco-t 14 2 Anachinent 5 TABLE C Rch 2 SON UNIT 2 CLASS 1.2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 46 of 64 k NUMBER FREQUENCY OF NUMBER OF ToBE EXAtNNATION DESCRIPTION EXAM METHOO COMPONENTS IN % TO BE EXADNNED DUR$NG INTERVAL EXAMINED OR ITEM NUMeER WTHE DEFERRAL OF INsPEcTIord TO INTERVAL END OF INTERVAL PERIOO PERIOD PERIOO Class 3 AR,100% of required areas of each D1.10 VT-1 Cooler Each inspection Interval 0 0 Cooier ISl4226-C Acid Evaporator 2 IA's cornponent support rnember Distillate Cooler deformation is identified Class 3 100% of required areas of each D1.10 Visual None N/A Each inspection interval NA N/A N/A N/A Acid Evaporator component support member Support Frame deformation is identfed ..d-.__-_ ___.--p____ All,100% of required areas of each D1.10 n oohng VT-1 Tank Each inspection Interval 0 Tank 0 ISI-0227-B r deformation is identified -~ -. - - _. _ _ -.. - 1 2 ERCWS/ One Strainer,100% of required Class 3 0 ssent aw m ne s ra a in Intemal one skainer 0 0 ISI-0268-A n 17 IA's on B member deformation is identdied AH,100% of required areas of each r/ w a nt aM hwr D1.10 /Ch ter ystem VT-1 Chiner Each inspection Interval Chener 0 0 ISI-0455-C s nt suW hr Shut Down Board Room Water Chiller Class 3 AH,100% of required areas of each " "9 Separator / welded attachment and whenever D1.10 VT-1 Separator Each inspection interval Separator 0 0 IS14479 C Water System Chin 4 IA's component support member Water Air Separator deformation is identdied One Heat Exchanger,100% of Class 3 required areas of each welded D1.10 Component Coohng VT-1 None attachment and whenever N/A Each inspection Interval N/A N/A N/A ISI-0261-8 Heat Exchanger component support rnember deformation is identified UNIT 2 - ATT5CRO2.XLS

0-SI-DXI-C00-Il4 2 ATTACHMENT 5 Anachment 5 TABLE C h 2 SON UNIT 2 CLASS 1.2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 47 of 64 NutsBER FREQUENCY OF Nut #9ER OF TO BE EXAMINATION DESCRIPTION EXAM METHOO COMPONENTS IN % TO BE EXAMINED DuRlNG INTERVAL EXAlstNED OR ITEM Nutd8ER IN THE DEFERRAL OF INSPECTION TO INTERVAL END OF INTERVAL 100% of required areas of each D1.10 Cleaning S nt VT-1 Unit 1 only N/A Each inspection Interval N/A N/A N/A N/A deformation is identified _ _ _ Exchanger _ (. One Heat Exchanger 100% of l f one heat Class 3 '*N" 2 RHRHSHX / one heat IS14291-C D1.10 RHR Heat Exchanger VT-1 attachtnent and whenever Each inspedion Interval 0 0 ""9 l**#8"9 Secondary Side component support rnember deformation is identified Class 3 One Strainer 100% of required D1.10 VT-1 one strainer Each inspedion interval 0 one strainer 0 ISI-0481-C Intake Pumping Station 2 IA's each and whenever component support Strainer rmmber deformation is identified D-A Piping Integrally of Welded Attachments Code D1.20 Visual CEsa Note: This includes N-509 ltem No. D1.40. 100% of required areas of each j welded attachment on 10% of the l D1.20 AFW VT-1 30 3 Each inspection Interval 1 1 1 IS14146-C the nonexempt component supports and whenever component support member deformation is identified 100% si required was of each welded attachment on 10% of the D1.20 CC VT-1 41 5 Each inspection Interval 1 2 2 ISt-01544 the nonexempt component supports and whenever component support member deformation is identified UNIT 2 - ATTSCR02.XLS

o-st-nx14*0-Il4.2 ATTACHMENT 5 ^"*C8""*'n 5 TABLE C Ree 2 SON UNIT 2 CLASS 1,2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 48 of 64 NutsBER FREQUENCY OF NutA8ER OF TO BE ExAnsWATION DESCRIPTION EXARA teETHoD COtsPONENTsIN % TO BE EKAMINED DuRINGINTERVAL EMARAINED OR ITEM NutABER IN THE DEFERRAL OF INSPECTION TO INTERVAL END OF INTERVAL PERIOD PERIOD PERioO 100% of required areas of each welded attachment on 10% of the D1.20 ERCW VT-1 65 7 Each Inspection Interval 2 2 3 IS14158-C the nonexempt component supports and whenever component support member deformation is identified 100% of required areas of each welded attachment on 10% of the au nts as a ed s D1.20 FPCS VI-1 Unit 1 only N/A Each inspection Interval N/A N/A N/A N/A the nonexempt component supports and whenever u.mp,..-.t support j member deformation is identified j _j l 100% of required areas of each l welded attachment on 10% of the I Dt.20 l ACCW VT-1 None N/A Each inspection interval N/A N/A N/A ISI-0451-C the nonexempt component supports j and whenever component support member deformation is identified j f' D+ Pumps integrally Code Dt.30 Visual Case i N-509 l 100% of required areas of each Class 3 welded attachment on 10% of the D1.30 Visual None N/A Each inspection Interval N/A N/A N/A N/A Auxiliary Feedwater the nonexempt component supports i Pump and whenever component support member deformation is identified l l UNIT 2 - ATTSCR02.XLS I

__m... 0-st-Oxi-000-114 2 ATTACHMENT 5 Attshment 5 TABLE C RcWm 2 SQN UNIT 2 CLASS 1.2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 49 of 64 NuMSER FREQUENCY OF NuMSER OF TO BE EXAMMATION DESCRIPTION EXAM METHOD COMPONENTS M % TO BE EXAtaNED DuRmGINTERVAL EXAMMEO OR ITEM NUMBER MTHE DEFERRAL OF MsPECTION TO INTERVAL END OF INTERVAL PERIOD PERICO PERIOD 100% of required areas of each Class 3 D1.30 Mot en A ary Visual None N/A Each inspechon interval N/A NA N/A N/A and whenever component support member deformatson is identified 100% of required areas of each Class 3 ^ ^ the none empt s p and whenever component support member deformation es identified 100% of required areas of each Class 3 welded attachment on 10% of the EssenM Raw MN mW anachments associated with D1.30 VT-1 Unit 1 wh WA Each inspection Interval N/A N/A N/A N/A Water System Pump the nonexempt component supports Station Pump and whenever component support member deformation is identified - - - - - l 100% of required areas of each l Class 3 welded attachment on 10% of the D1.30 VT-1 Unit 1 only N/A Each inspechon Interval N/A N/A N/A N/A Cleaning System Spent the nonexempt component supports Fuel Pit Pumps and whenever w...,ss.ist support rnember deformation is identified 100% of required areas of each l Class 3 welded attachment on 10% of the l ^ Water System Chdi Visual None N/A Each inspection Interval N/A N/A N/A N/A ""9 D1.30 the nonexempt component supports l Water Circulation Pump and whenever component support member deformation is identsfied t UNIT 2 - ATT5CRO2.XLS

.~~ . -. -. ~. ATTACHMENT 5 0-SI-DXt-oco-II4 2 Autani 5 TABLE C Ro h 2 SON UNIT 2 CLASS 1.2. AND 3 INTEGRALLY WELDED ATTACHMENTS SCHEDULE PLANNING DOCUMENT Page 50 of 64 NUMBER FREQUENCY OF DESCRIPTION EXAM METHOD C N IN % TO BE EXAMINED DURfNG INTERVAL E MtNED H ITEM NUMeER IN THE DEFERRAL OF INSPECTION To FIRST $ECOND THIRD INTERVAL END OF INTERVAL f 100% of required areas of each welded attachment on 10% of the l ,3 f, WA N/A D1.30 ERCW Screen Wash Visual Unit 1 only N/A Each inspeciton interval N/A N/A the nonexempt component supports Pump Support and whenever component support { member deformation is identified I

f. _ _ _

_ _ ~ _. _ _ 100% of required areas of each included under welded attachment on 10% of the N/A Each inspection interval N/A N/A N/A l N/A

  • * '"W" D1.40 VT 1 Attachments of Code Case the nonexempt component supports l

ase N-509. and whenever component support 1 1 member deformation is identified l 1 UNIT 2 - ATTSCR02.XLS

ATTACHMENT 5 0-SI-DXI-000-I l 4.2 TABLE D RcWsb 2 SON UNIT 2 CLASS 1,2, AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 5I of 64 EXA2 frEM TO SE EXAaltNED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMINATION NUMBER g' ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOD t F-A Class 1 Piping cf One-directional Code F1.10A Restraints Visual C:so N-491 Function A F1.10A! CVC VT-3 27 25% 7 2 3 2 interval MSG-0015-C F1.10A RCS VT-3 9 25% 3 1 1 1 MSG-0013-C interval ____}__.__ F1.10A RCS MAIN VT-3 None 25% N/A N/A N/A N/A interval ISI-0321-C , F1.10A. RHR VT-3 8 25% 2 1 1 0 MSG-0010-C Interval t ______j__ _j F1.10A SIS VT-3 21 25 % 6 2 2 2 MSG-0009-C interval p_ F-A ' Class 1 Piping c.f Multidirectional Code F1.10B' Restraints Visual Cm3 N-491 Function B F1.10B CVC VT-3 91 25 % 23 8 7 8 interval MSG-0015-C ad inspm F1.10B RCS VT-3 6 25 % 2 1 1-0 MSG-0013-C interval Ead inWon ~ 1 0 0 F1.10B RCS MAIN VT-3 4 25% 1 f ISI-0321-C interval UNIT 2 - ATTSDRO2.XLS

~ -. - - - -.. -.. ~ ~ _ -. - -- -. - -. ~. - - ATTACHMENT 5 0-st-Dxi-oc3-I I4.2 TABLE D Revision 2 SON UNIT 2 CLASS 1. 2, AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 52 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF BSI DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMifrJ.J IN THE EXAMINED IN THE EXAANNED IN THE EXAMMEDIN THE ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRO PERIOD F1.10B RHR VT-3 4 25% 1 0 0 1 MSMO-C nterv F1.10B SIS VT-3 52 25% 13 4 4 5 MSG-0009-C Class 1 Piping p, Variable Supports C nstant Force) Function C 24 F1.10C CVC VT-3 2 25% 1 0 1 0 interval MSG-0015-C F1.10C RCS VT-3 14 25% 4 1 1 2 MSG-0013-C Interval F1.10C RCS MAIN VT-3 None 25% N/A N/A N/A N/A 3 .._ _ __..l f N/A MSG-0010-C F1.10C RHR VT-3 None 25% N/A N/A N/A a specbon 0 MSG N F1.10C SIS VT-3 6 25% 2 1 1 I interval I F-A Class 1 Piping l cf Variable Supports Code F1.100 (Snubbers) Visual Cas2 N-491 Function D M2C F1.10D CVC VT-3 to 25 % 3 1 1 1 Interval MSG-0015-C i UNIT 2 - ATT5DRO2.XLS

ATTACHMENT 5 0-st-nxt-000-114.2 TABLE D =2 SON UNIT 2 CLASS 1, ' AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 53 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF ISI DRAWWG DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE NUMBER EXAMINATION ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERIOD _j F1.100-RCS VT-3 22 25% 6 2 2 2 MSG-00134 interval F1.10D RCS MAIN VT-3 None 25% N/A N/A N/A N/A -0 C F1.10D' RHR VT-3 1 25% 1 0 0 1 MSG-00104 interval F1.10D SIS VT-3 12 25 % 3 1 1 1 MSG-0009-C interval F-A Class 2 Piping. I of One-directional Code F1.20Ai Restraints Visual C mso N-491 Function A I"*P* F1.20A CS VT-3 23 15% 4 1 1 2 interval MSG @11-C a s@on F1.20A CVC VT-3 73 15% 11 3 4 4 ISI-04494 interval F1.20A FW VT-3 14 15 % 3 1 1 1 MSG-00164 interval "*P' F120A MS VT-3 6 15% 1 0 1 0 MSG-0017-C interval "*P F120A RHR VT-3 54 15% 9 3 3 3 interval MSG-0010-C .y. "*P* IS 9-C F1.20A SIS VT-3 68 15% 11 4 3 4 interval MSG-0009-C l UNIT 2 - ATT5DRO2.XLS

.. ~... 0-SI-Dxt-000-114.2 ATTACHMENT 5 Anachment 5 TABLE D Revision 2 SON UNIT 2 CLASS 1,2, AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 54 of 64 TO BE EXAMWED FREQUENCY OF BSI DRAWING EXAM ITEM ! DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAM 0NEDIN THE EXAMINED IN THE EXAMINED IN THE NMR ITEM MUMBER INTERVAL FIRST PERIOD SECOND PERIOD THIRD PERtOD F-A Class 2 Piping c,f Multidirectional Code F1.20B Restraints Visual Crse N-491 Function B "*E' F1.20B; CS VT-3 ')5 15% 4 1 1 2 interval MSG-0011-C i _ _.4- - Each inspection F1.20B CVC VT-3 47 15% 8 2 3 3 i ISI-0449-C interval _ L__ - ' - ~ - ' ~ ~ _ _ _ _ j.. Each inspection F1.20B{ FW VT-3 3 15% 1 0 1 O MSG-00M interval ( MSG-00174 Each inspection F1.20B MS VT-3 10 15% 2 1 0 1 interval _...____{__ j - ^ " ~ - ~ ~~ ~ ~ ~ ~ ~ ~ - - ~ ~ ~ Each inspection ISI-04494 F1.20B! RHR VT-3 30 15% 5 1 ) MSG-00104 2 2 interval

  • P' F1.20B SIS VT-3 158 15 %

24 8 8 8 interval MSGM-C Class 2 Piping p Variable Supports d C nstant Force) Function C

  1. i"*P # "

'8 F1.20C CS VT-3 8 15% 2 1 1 0 enterval MSG-0011-C F1.20C CVC VT-3 11 15% 2 0 1 1 ISt&49-C interval UNIT 2 - ATTSDR02.XLS

0-SI-Dxist :4.2 ATTACHMENT 5 TABLE D Reh 2 SON UNIT 2 CLASS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 55 of 64 EXAM l'EM TO BE EXAMINED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE CE E ITEM NUMBER INTERVAL FIRST PERtOD SECOND PERIOD THtRD PERIOD [ 0 1 1 MSG-0016-C F1.20C FW VT-3 8 15% 2 F1.20C 'MS VT-3 16 15% 3 1 1 1 MSG-0017-C interval I F1.20C RHR VT-3 19 15% 3 1 1 1 interval MSG @10-C F1.20C SIS VT-3 12 15% 2 1 1 0 interval MSG-00094 F-A Class 2 Piping. of Variable Supports Code F1.200 (Snubbers) Visual C=>s N491 Function D __._...__..j__ F1.20D CS VT-3 None 15% N/A N/A N/A N/A interval MSG-0011-C F1.20D CVC VT-3 9 15% 2 1 1 0 ISI-0449-C Interval F1.20D FW VT-3 5 15% 1 1 0 0 MSG-0016-C interval F1.20D MS VT-3 14 15 % 3 1 1 1 MSG-0017-C interval F1.20D RHR VT-3 9 15% 2 1 1 0 interval MSG-0010-C I F1.20D SIS VT-3 15 15% 3 1 1 1 interval MSG-0009-C UNIT 2 - ATT5DRO2.XLS

ATTACHMENT 5 0-si-Dxt-ooo-114.2 TABLE D Revision 2 SON UNIT 2 CLASS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 56 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE NUMBER EXAMINATION ITEM NUMBER INTERVAL FIRST PERIOD SECOMO PERIOD THIRD PERIOD _~ F-A Class 3 Piping cf One-directional Code F1.30A Restraints Visual Cxe N-491 Function A 1 0 0 ISI-0451-C F1.30A ACCW VT-3 1 10% 1 .____.____j___.._...__ l 2 IS14146-C 2 2 F1.30A AFW VT-3 57 10% 6 -_ j. _.._ F1.30A CC VT-3 82 10 % 9 3 3 3 ISI-0154-C interval F1.30A CVC VT-3 None 10% N/A N/A N/A N/A ISi-0449-C interval .. 4 a sWon F1.30A ERCW VT-3 135 10% 14 4 5 5 ISI-01584 interval a spedon F130A FPCS VT-3 Unit 1 only 10 % N/A N/A N/A N/A N/A interval F-A Class 3 Piping Multidirectional Code F1.30B' Restraints Visual C se N-491 Function B E"* F1.30B ACCW VT-3 11 10% 2 0 1 1 ISI-0451-C interval F1.308 AFW VT-3 43 10% 5 1 2 2 ISI-0146-C Interval UNIT 2 - ATT5DRO2.XLS

0-st-DXI-000-Il4.2 ATTACHMENT 5 TABLE D RcWsion 2 SON UNIT 2 CLASS 1. 2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT. Page 57 of 64 EXAM ITEM TO BE EXAMINED FREQUENCY OF ISt DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXARWNED IN THE FXAMINED IN THE EXAM 6NED IN THE EXAMINED IN THE ITEM NUMBER INTERVAL FIRST PERIOD SECONO PERIOD THIRD PERIOD CE M ~_ 3 3 4 ISI-0154-C F1.30B CC VT-3 98 10% 10 F1.30B CVC VT-3 None 10% N/A N/A N/A N/A ISI-0449-C e F1.30B ERCW VT-3 156 10*/. 16 5 5 6 ISI-0158-C F1.30B FPCS VT-3 Unit 1 only 10% N/A N/A N!A N/A N/A Class 3 Piping p Variable Supports C natant Force) Function C F1.30C ACCW VT-3 None 10% N/A N/A N/A N/A ISI-0451-C interval I"*E*d" F1.30C AFW VT-3 31 10% 4 1 1 2 ISI-0146-C interval a ns W on F1.30C CC VT-3 16 10% 2 1 1 0 ISI-0154-C interval F1.30C CVC VT-3 None 10% N/A N/A N/A N/A ISI-0449-C interval i Eac inspedon F1.30C ERCW VT-3 4 10 % 1 0 1 0 ISI-0158-C interval F1.30C FPCS VT-3 Unit 1 only 10 % N/A N/A N/A N/A N/A interval j i UNIT 2 - ATT5DRO2.XLS l I

ATTACHMENT 5 o-s1.nxi. coo-II4.2 Anactment 5 TABLE D Reh 2 SON UNIT 2 CLASS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 58 of 64 EXAM ITEM TO BE EXAMMED FREQUENCY OF ISI DRAtMNG CAT ~ NO~ DURWG MTERVAL EXAMMATION NUMBER ITEM NUMBER INTERVAL FIRST PERIOO SECOND PERIOO THIRD PERIOO F-A Class 3 Piping cf Variable Supports Code F1.30D. (Snubbers) Visual CLse N-491 Function D F1.30D ACCW VT-3 None 10% N/A N/A N/A N/A ISI-0451-C --f F1.30D AFW VT-3 9 10 % 1 nte 1 ~t Ea in m l ISI-0154-C F1.30D-CC VT-3 16 10 % 2 1 0 1


f F1.30D CVC I

VT-3 None 10% N/A n -i--- F1.30D ERCW VT-3 9 10 % 1 0 0 1 l lSI-0158-C interval F1.30D FPCS VT-3 Unit 1 only 10% N/A N/A N/A N/A i N/A anterval i I ~~ 100% of the F-A components or if cf Class 1,2, or 3 multiple Each inspection Code F1.40 Supports OtherThan Visual components only g Ctse Piping Supports one of the i N491 multiple components Class 1 Equipment "W" F1A0 VT-3 All 0 0 ISI-0298-C t Reactor Vessel 1 support i 1 support interval /1 support i l UNIT 2 - ATTSDRO2.XLS

0-SI-D%t-ooo-1 I4.2 ATTACHMENT 5 Anathment 5 TABLE D Revision 2 SON UNIT 2 CLASS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 59 of 64 TO BE EXAMINED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAQ ITEM R ER M ITEM NUMBER INTERVAL FIRST PERIOD SECOND PERIOO THIRD PERIDO ~__-._ F1.40 VT-3 All 0 0 ISi-0396-C Pressurizer 2 support 2 supports Interval 2 supports Class 1 One Steam One Steam Each inspection One Steam Steam Generator Generator Generator interval Generator Class 1 One Reactor Each inspection One Reactor D ISW2% . Reactor Coolant Pump

  • E
  • E Coolant Pump interval Coolant Pump F1.40 VT-3 None m a vales N/A N/A N/A N/A g

only one of the multiple valves Class 2 Equipment Class 2 One steam One Steam Each inspection One Steam 0 0 MM Steam Generator Generator Generator interval Generator 0 O ISI-0289-C F1.40 Residua eat Removal VT-3 1 support on each Exchanger Exchanger interval Exchanger Heat Exchanger ass 2 2 CSHX / One Heat One Heat Each inspection One Heat 1s rt on each Exchanger Exchanger interval Exchanger H E I UNIT 2 - ATTSDRO2.XLS

0-st-Dul-ooo-ll4.2 ATTACHMENT 5 TABLE D Reson 2 SON UNIT 2 CLASS 1,2, AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 60 of 64 TO BE EXAMrNED FREQUENCY OF ist DRAWING EXAM ITEM DURING INTERVAL EXAMINATION NuMSER ITEM N'JMBER INTERVAL FIRST PERK)O sECOND PERIOD TH8RD PERIOD CAT. NO. Class 2 SealWater Heat SealWater Each inspection F1.40 SealWater Heat VT-3 Exchanger / All Heat 0 Heat 0 ISI-0461-C Exchanger 1 support Exchanger Exchanger F1.40 VT-3 Ali O O ISI-0459-C Seal Water Filter 1 support Filter interval Fitter Class 2

    • I F1'40 VT-3 One filter One SWIF One SWIF 0

0 ISI-0457-C Filter 1 support each interval -( l

  • I Centnfugal Class 2 Centrifugal Charg mp F1.40 Centrifugal Charging VT-3 All Charging Pump 0

0 ' Charging Pump ISI-0074-C e Pump Tank Tank Tank 1 support I "*P' F1.40 Residua at Removal VT-3 One Pump One RHRP 0 One RHRP O ISI-0352-B 3, ,g Pump ) F1.40 Centrif a Charging VT-3 One Pump One CCP One CCP O O ISl&67-C Pump I One Pump One SIP 0 One SIP 0 ISI-0471-C Safety in ection Pump 1 su rt ach l l 1 UNIT 2 - ATT5DRO2.XLS

0-SI-D%I-oc3-I t 4.2 ATTACHMENT 5 TABLE D SQN UNIT 2 CLASS 1,2, AND ! AIPPORTS SCHEDULE PLANNING DOCUMENT Page 61 of 64 i ~ i I """*E" " EXAM ITEM TO BE EXAMMEC FREQUENCY OF 158 CRAWMNG DESCRIPTION EXAM METHOD COMPOt:ENTS IN EXAMINED IN THE EXAMINED IN THE EXAMINED IN THE EXAMWED IN THE g R ITEM NUMBER INTERVAL FIRST PERIOO SECOND PERIOD THIRD PERIOD F1.40 Conta t Spray VT-3 One Pump One CSP 0 0 One CSP iSI-0465-C 1 support each intervat Pump 100% of the i F1.40 VT-3 mult v i es 1 0 0 1 MSG-0010-C RH s only one of the f-multiple valves i I Class 3 Equipment i i p HX/ One Heat F1~40 Conta Spray VT-3 One CSHX 0 0 One CSHX ISI-0463-C 1 support each Exchanger interval Heat Exchanger j j Class 3 F1.40 VT-3 All 0 O ISI-0257-A Letdown Heat 1 support Exchanger Interval Exchanger Exchanger ~" I Class 3 Gas Stripperand Boric F1.40 VT-3 All Condenser O O Condenser ISM 22% Acid Evaporator 1 support interval Condenser Class 3 88 F1'40 VT-3 AH C M er 0 0 0W GM% 4 Acid Evaporator 1 support interval l Distillate Cooler i UNIT 2 - ATTSDR02.XLS i

0-si-Dxi-coo-l it2 ATTACHMENT 5 TABLE D SQN UNIT 2 CLASS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 62 of 64 TO BE EXAMINED FREQUENCY OF ISI DRAWING DESCRIPTION EXAM METHOD COMPONENTS M EXAMINED IN THE EXAMWED IN THE EXAMINED IN THE EXAMMED IN THE EXAM ITEM ITEM NUMBER INTERVAL FIRST PERIOD sECOND PERIOD THIRD PERIOO ._-._--_{._._ Class 3 F1.40 VT-3 All Frame 0 0 Frame ISI-C s &C Acid Evaporator 1 support interval Support Frame F1.40 Com ing VT-3 All Tank 0 Tank 0 ISI-0227-8 i Surge Tank [,# All Pump 0 0 Fump ISI-0475-C F1.40 Turbine Dnv n Auxiliary VT-3 Feedwater Pump Ea on F1.40 Motor D ven Auxiliasy VT-3 One pump One MDAFWP 0 0 One MDAFWP ISI-0477-C g, Feedwater Pump F1.40 pg One CCSM 0 One CCW 0 ISM 2EA CCS te Pumps 1s ach interv ~ - -. Class 3 2 CCHX I One heat Ead bspection F1.4O g One CCHX 0 One CCHX 0 ISI-0261-B CCS Heat Exchanger 1 support each exchanger Interval UNIT 2 - ATT5DRO2.XLS w....

l l U-s:-DXI-000-I l 4.2 ATTACHMENT 5 Auachnien 5 TABLE D Reson 2 SON UNIT 2 CLASS 1,2, AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 63 of 6A NUMBER OF NUMBER TO BE NURABER TO BE NUMBER TO BE NUGABER TO BE DESCRIPTION EXAM METHOD COMPONENTSM EXAMINED W THE EXARIINED M THE EXAGAINED IN THE EXAAAINED M THE i CAT. NO. DuRING INTERVAL EXAMMATION i FIRST PERIOO SECOND PERIOD THIRD PERIOO Class 3 F1.40 ERCW Pump Station VT-3 Unit 1 only One Pump N/A N/A N/A N/A N/A snterval p - -- } -- - - - Each inspection l Class 3 F1.40 FPCC Spent Fuel Pit VT-3 Unit 1 only One Pump N/A ^ ^ interval l Pumps -4.. i Class 3 ^ I F1.40 VT-3 All CIGeer Chiller 0 0 ISI-0455-C Board Room Water 1 support interval Chiller Ea son F1.40 ACCW h il Water VT-3 All Pump Pump 0 0 ISI-0473-C Circulation Pump l F1.40 ACCW il Water Air VT-3 All Separator Separator 0 0 ISI-0479-C Separator - - ~ ~ F1.40 FPCC nt Fuel Pat VT-3 Unit 1 only N/A N/A N/A N/A N/A Heat Exchanger ass 3 2 RHRHSHX / One heat One Each inspection One F1.40 RHR Heat Exchanger VT-3 1 support each exchanger RHRHSHX interval RHRHSHX Secondary Side UNIT 2 - ATT5DR02.XLS f

0-st-Dximo-II4.2 ATTACHMENT 5 Anadinent 5 TABLE D Revision 2 SON UNIT 2 CL/SS 1,2. AND 3 SUPPORTS SCHEDULE PLANNING DOCUMENT Page 64 of 64 l O BE NNER M M NR M M TO BE CXAMWED FREQUENCY OF 153 DRAWING EXAM ITEM DESCRIPTION EXAM METHOD COMPONENTS IN EXAMINED IN THE EXAMtNATON NUMSER ITEM NUMBER INTERVAL FIRsT PERIOD SECOND PERIOD THIRD PERIOD Class 3 F140 ERCW Screen Wash VT-3 Unit 1 only One Pump N/A N/A N/A N/A i N/A Interval P Su W O 0 ISI-0481-C F1.40 ERCW ntake Pumping VT-3 One strainer 3 STR Station Strainer _ ~ _ _ _ ._[ valves or if I* ** F140 VT-3 None multiple valves N/A N/A N/A N/A Valves anterval multiple valves UNIT 2 - ATTSDR02.XLS ~

1 ITEM 2.B. As requested SQN is providing Requests for Relief for Code Cases N-509, N-521, and N-524. Request for Relief 1-ISI-5 and 2-ISI-5 address Code Case N-509," Alternative Rules for the Selection and Examination of Class 1,2, and 3 Integrally Welded Attachments", i Section XI, Division 1. Request for Relief 1-ISI-6 and 2-ISI-6 address Code Case N-521, " Alternative Rules for Deferral ofInspections ofNozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel", Section XI, Division 1. Request for Relief 1-ISI-7 and 2-ISI-7 address Code Case N-524, " Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping", Section XI, Division 1. Relief Requests I-ISI-5, I-ISI-6, and 1-ISI-7 will be added to 0-SI-DXI-000-114.2, 2, Requests for Relief (Unit 1). Relief Requests 2-ISI-5,2-ISI-6, and 2-ISI-7 will be added to 0-SI-DXI-000-114.2, Attachment 13, Requests for Relief (Unit 2). i l

l SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-5 ) l Components: Class 1,2, and 3 Integrally Welded i Attachments of Vessels, Piping, Pumps and Valves. b Class. ASME Code Class 1,2, and 3 (Equivalent) Integrally Welded Attachments 4 l Examination Categories: B-H, B-'K-1, C-C, D-A, D-B, and D-C i Item Numbers: B8.10, B8.20, B8.30, B8.40 ; B10.10, B10.20, j B10.30 ; C3.10, C3.20, C3.30, C3.40 ; D1.20, i DI.30, Dl.40, DI.50, D1.60 ; D2.20, D2.30, j D2.40, D2.50, D2.60 ; D3.20, D3.30, D3.40, j D3.50, D3.60. } Code Reauirement: Selection and Examination of Class 1,2 and 3 ] Integrally Welded Attachments in accordance with the 1989 Edition of ASME Section XI, j Division 1 and Code Case N-491. l Alternative Requirements: Reliefis requested to use Code Case N-509,. " Alternative Rules for the Selection and l Examination of Class 1,2, and 3 Integrally Welded Attachments", Section XI, Division 1 i in lieu of the 1989 Edition of ASME Section XI as stated above. + Basis for Relief: In many cases, performing a surface examination on Class 1 and Class 2 integrally l welded attachments requires the removal of pipe clamps. Pipe clamp removal is labor intensive and often destroys bolting in the process. Pipe clamp removal on larger components such as those found on the Main Steam and Feedwater Systems are particularly difficult. Sequoyah did not identify any significant problems with integrally welded attachments in the first ISI Inspection Interval. The costs for preparing and examining integrally welded attachments are significant, as is the attendant additional radiation exposure. Code Case

- ~ _ - -.. _. - - -.. - - - i SEQUOYAH NUCLEAR PLANT j REQUEST FOR RELIEF 1-ISI-5 N-509 provides an overall cost savings and exposure reduction without compromising safety or quality. By utilizing Code Case N-509 the number ofintegral attachments requiring examination is reduced for Classi integrally welded attachments where base material design thickness is 5/8" or greater, Class 2 integrally welded attachments where base material design thickness is 3/4" or greater, and Class 3 integrally welded attachments. However Code Case N-509 increases the Class 1 and 2 integral attachment population for certain areas due to the elimination of the material design base thickness exemption and for Class 3 integrally welded attachments a more stringent visual examination method (VT-1 in lieu of a VT-3) is required. Alternate Examinations: The examination requirements of Code Case N-509 will be used as an alternative to the examination requirements of the 1989 Edition of ASME Section XI, Division 1. Note: Code Case N-509 requires selection of component apports for examination in accordance with IWF of the 1990 Addenda. ) Sequoyah will implement Code Case N-509 l uti!izing Code Case N-491, which contains the j same requirements for selection of component supports for examination as the 1990 Addenda. Code Case N-491 has been approved for use in Regulatory Guide 1.147. SQN will perform surface examinations on 10% of Class 1 and Class 2 integral attachments (on piping, pumps and valves) associated with the component supports selected for examination in accordance with Code Case N-509. Note: SQN will perform visual examinations (VT-1) on 10% of the integral attachments of Class 3 piping, pumps, and valves.

d i SEQUOYAH NUCLEAR PLANT ,{ REQUEST FOR RELIEF 1-ISI-5 NOTE: SQN's Program is designed to ensure as a j minimum the number ofintegral attachments j for Class 1 and 2 (piping, pumps, and valves) to be examined would be equal to 10% of the L total supports being examined. l In the case of multiple vessels of similar design, i function, and service, only one integral attachment of j only one of the multiple vessels will be examined. i l Examinations will be performed on integral attachments when a component support member i deformation (e.g. broken, bent, or pulled out parts) is identified during operation, refueling, maintenance, i examination, inservice inspection, or testing. I l l Justification: Code Case N-509 was accepted by the ASME Code l Committee as an alternative to the provisions in ASME Section XI for the examination ofintegral attachments. The alternate examinations specified in the code case maintain an acceptable level of safety and are suHicient to assure structuralintegrity for the integral attachments. i C_onclusion: Based on the above justification and the reasons stated previously, it is concluded that the alternate examination requirements of Code Case N-509 provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), itis recommended that relief be granted. Implementation Schedule: Code Case N-509 will be implemented during the Second ISI Inspection Interval for Sequoyah Unit 1.

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-5 Components: Class 1,2, and 3 Integrally Welded Attachments of Vessels, Piping, Pumps and Valves. Class: ASME Code Class 1,2, and 3 (Equivalent) Integrally Welded Attachments E_u.mination Categories: B-H, B-K-1, C-C, D-A, D-B, and D-C Item Numbers: B8.10, B8.20, B8.30, B8.40 ; B10.10, B10.20, J B10.30 ; C3.10, C3.20, C3.30, C3.40 ; D1.20, DI.30, DI.40, DI.50, DI.60 ; D2.20, D2.30, D2.40, D2.50, D2.60 ; D3.20, D3.30, D3.40, D3.50, D3.60. Code Requirement: Selection and Examination of Class 1,2 and 3 Integrally Welded Attachments in accordance with the 1989 Edition of ASME Section XI, i Division 1 and Code Case N-491. Alternative Reauirements: Reliefis requested to use Code Case N-509, " Alternative Rules for the Selection and i Examination of Class 1,2, and 3 Integrally Welded Attaciunents", Section XI, Division 1 in lieu of the 1989 Edition of ASME Section XI as stated above. Basis for Relief: In many cases, performing a surface examination on Class 1 and Class 2 integrally welded attachments requires the removal of pipe clamps. Pipe clamp removal is labor 3 [ intensive and often destroys bolting in the l process. Pipe clamp removal on larger components such as those found on the Main i Steam and Feedwater Systems are particularly difficult. I t Sequoyah did not identify any significant problems with integrally welded attachments in i the first ISI Inspection Interval. The costs for { preparing and examining integrally welded j attachments are significant, as is the attendant additional radiation exposure. Code Case 4 1

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-IS1-5 N-509 provides an overall cost savings and exposure reduction without compromising safety or quality. i By utilizing Code Case N-509 the number ofintegral i attachments requiring examination is reduced for Classl integrally welded attachments where base j material design thickness is 5/8" or greater, Class 2 i integrally welded attachments where base material i design thickness is 3/4" or greater, and Class 3 integrally welded attachments. However Code Case N-509 increases the Class 1 and 2 integral attachment i the at naldesi ase hick ss exem t n a d for l Class 3 integrally welded attachments a more stringent visual examination method (VT-1 in lieu of a VT-3) is j required. i Alternate Examinationx The examination requirements of Code Case N-509 l will be used as an alternative to the examination requirements of the 1989 Edition of ASME Section XI, Division 1. J Note: Code Case N-509 requires selection of component supports for examination in j accordance with IWF of the 1990 Addenda. Sequoyah will implement Code Case N-509 j utilizing Code Case N-491, which contains the i same requirements for selection of component supports for examination as the 1990 Addenda. Code Case N-491 has been approved for use in j Regulatory Guide 1.147. i SQN will perform surface examinations an 10% of Class 1 and Class 2 integral attachments (on piping, pumps and valves) associated with the component l supports selected for examination in accordance with Code Case N-509. j Note: SQN will perform visual examinations (VT-1) on 10% of the integral attachments of Class 3 piping, pumps, and valves.

i SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-5 NOTE: SQN's Program is designed to ensure as a minimum the number ofintegral attachments for Class 1 and 2 (piping, pumps, and valves) l to be examined would be equal to 10% of the ] total supports being examined. In the case of multiple vessels of similar design, i{ function, and service, only one integral attachment of only one of the multiple vessels will be examined. Examinations will be performed on integral attachments when a component support member deformation (e.g. broken, bent, or pulled out parts) is identified during operation, refueling, maintenance, examination, inservice inspection, or testing. Justification: Code Case N-509 was accepted by the ASME Code Committee as an alternative to the provisions in ASME Section XI for the examination ofintegral attachments. The alternate examinations specified in a the code case maintain an acceptable level of safety i and are sufficient to assure stmetural integrity for the integral attachments. I

== Conclusion:== Based on the abovejustification and the reuons stated i previously, it is concluded that the alternate 1 examination requirements of Code Case N-509 provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3),it is recommended that relief be granted. j Implementation Schedule: Code Case N-509 will be implemented during the Second ISI Inspection Interval for Sequoyah Unit 2.

i SEQUOYAH NUCLEAR PLANT ] REQUEST FOR RELIEF 1-ISI-6 ) Components: Reactor Vessel (RV) Outlet Nozzle-to-Vessel Welds, l RV Nozzle Inside Radius Section and RV Nozzle-to-Safe End Butt Welds i Class. ASME Code Class 1 i Examination Category: B-D and B-F Item Number: B3.90, B3.100 and B5.10 Code Requirement: ASME Section XI,1989 Edition, Table IWB-2500-1 Examination Category B-D requires a volumetric l examination for Item Numbers B3.90 and B3.100 in accordance with Footnote (2) " At least 25% but not more than 50% (credited) of the nozzles shall be j-examined by the end of the first inspection period, and i the remainder by the end of the inspection interval. j Item Number B3.90 must also be in accordance with Footnote (3)" Inspections may be partially deferred i under the following conditions: If examinations are conducted from inside the component and the nozzle weld is examined by the straight beam ultrasonic j method from the nozzle bore, the remaining examinations required to be conducted from the shell inside diameter may be performed at or near the end of each inspection interval." l 4, ASME Section XI,1989 Edition, Table IWB-2500-1, Examination Category B-F, requires a volumetric and f surface examination for Item Number B5.10, Footnote (2)"For the reactor vessel nozzle safe ends, the j examinations may be performed coincident with the i vessel nozzle examinations required by Examination Category B-D." Alternate Requirements: Reliefis requested to use Code Case N-521, " Alternative Rules for Deferral ofInspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel Section XI, Division 1," in lieu of the 1989 Edition of ASME Section XI as stated above.

l SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-6 Basis for Relief: The alternative examination requirements of Code Case N-521 allows deferral of the examinations of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a PWR vessel to the end of the inspection interval, if certain conditions are met. Per the examination requirements of the 1989 l Edition, Examination Category B-D, Footnote (2) two reactor vessel outlet nozzles are required to be examined "At least 25% but not more than 50% (credited) of the nozzles shall be examined by the end of the first inspection period, and the remainder by the end of the inspection interval.The RV nozzle-to-vessel welds and inside radius sections are ultrasonically examined from the RV inside diameter using automated examination devices. With the RV core barrel in place, the outlet nozzles are accessible for examination from the nozzle bore only. The inlet nozzles are inaccessible for examination until the core barrelis removed. During the first inspection period, the accessible volumes of the nozzle-to-vessel welds and inside radius sections on four outlet nozzles would be examined from the nozzle bore. The remaining examinations for the four inlet and four outlet nozzles would be completed in the third inspection period, to satisfy the requirements of Table IWB-2500-1, Examination Category B-D, Item Numbers B3.90 and 3.100. j The RV nozzle-to-safe end welds on the four outlet q nozzles are ultrasonically examined from the inside 1 diameter when the outlet nozzles are examined from the nozzle bore during the first inspection period. The four inlet nozzles would be examined in the third inspection period to satisfy the requirements of Table IWB-2500-1 Examination Category B-F, Item Number B5.10. Performing all required examinations for the nozzle-to-vessel, inside radius sections and nozzle-to-safe end welds during the third inspection period in lieu of the first and third inspection periods provides several benefits for SQN:

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-6 1 i

1. A reduction in the number of times an automated device and associated materials and equipment must be installed on RV.
2. Compliance with ALARA Program j
a. Reduction in Radwaste
b. Reduction in Personnel Exposure t
3. Use of same vendor, personnel, procedures and equipment to examine welds would enhance quality of examination results and reduce possibilty for errors.
4. Overall cost savings to SQN with a reduction in hardship without compromising quality and safety.

SQN examined the nozzle-to-vessel welds and inside radius sections, and nozzle-to-safe end welds of the four outlet nozzles in both the first and third inspection periods of the first inspection interval.These additional examinations were performed to maintain a ten year frequency. Code Case N-521 was accepted by the ASME Code Committee as an alternative to the existing requirements. SQN Unit I satisfied the following conditions as required by the ASME Code Committee for use of Code Case N-521: (a) No inservice repairs or replacements by welding have ever been performed on any of the Nozzle-to-Vessel Welds, Inside Radius Sections, or Nozzle-to-Safe End Welds. (b) None of the Nozzle-to-Vessel Welds, Inside Radius Sections, or Nozzle-to Safe End Welds contains identified flaws or relevant conditions that currently require successive inspections in accordance with IWB-2420(b). (c) The unit is not in the first inspection interval. Alternate Examinations: As an alternative to the requirements of the 1989 Edition of ASME Section XI, SQN will perform examinations in accordance with the requirements of Code Case N-521.

1 SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-6 Justification: Code Case N-521 was accepted by the ASME Code Committee as an alternative to the provisions in ASME Section XI for " Deferral ofInspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel". The alternate examinations specified in the code case maintain an acceptable level of quality and safety, with a reduction in hardship and costs to SQN.

== Conclusion:== Based on the abovejustification and the reasons stated previously, it is concluded that the alternate examination requirements of Code Case N-521 and the additional examinations performed in the third period of the first inspection interval at SQN provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), it is recommended J that relief be granted. J Imolementation Schedule: Code Case N-521 will be implemented during the Second ISI Inspection Interval for Sequoyah Unit 1.

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-6 Components: Reactor Vessel (RV) Outlet Nozzle-to-Vessel Welds, RV Nozzle Inside Radius Section and RV Nozzle-to-Safe End Butt Welds Class. ASME Code Class 1 Examination Category: B-D and B-F Item Number: B3.90, B3.100 and B5.10 Code Reauirement: ASME Section XI,1989 Edition, Table IWB-2500-1 Examination Category B-D requires a volumetric examination for Item Numbers B3.90 and B3.100 in accordance with Footnote (2)" At least 25% but not more than 50% (credited) of the nozzles shall be examined by the end of the first inspection period, and the remainder by the end of the inspection interval. Item Number B3.90 must also be in accordance with Footnote (3)" Inspections may be partially deferred under the following conditions: If examinations are conducted from inside the component and the nozzle weld is examined by the straight beam ultrasonic method from the nozzle bore, the remaining examinations required to be conducted from the shell inside diameter may be performed at or near the end of each inspection interval." ASME Section XI,1989 Edition, Table IWB-2500-1, Examination Category B-F, requires a volumetric and surface examination for Item Number B5.10, Footnote (2) "For the reactor vessel nozzle safe ends, the examinations may be performed coincident with the vessel nozzle examinations required by Examination Category B-D." Alternate Requirements: Reliefis requested to use Code Case N-521, " Alternative Rules for Deferral ofInspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel Section XI, Division 1," in lieu of the 1989 Edition of ASME Section XI as stated above. i 1

i 1 l SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-6 4 Basis for Relief: The alternative examination requirements of Code . Case N-521 allows deferral of the examinatious of ) Nozzle-to-Vessel Welds, Inside Radius Sections, and l Nozzle-to-Safe End Welds of a PWR vessel to the end of the inspection interval, if certain conditions are met. 1 j Per the examination requirements of the 1989 Edition, Examination Category B-D, Footnote (2) two i reactor vessel outlet nozzles are required to be examined "At least 25% but not more than 50% l (credited) of the nozzles shall be examined by the end of the first inspection period, and the remainder by the i end of the inspection interval.The RV nozzle-to-vessel welds and inside radius sections are ultrasonically examined from the RV inside diameter using i automated examination devices. With the RV core i barrel in place, the outlet nozzles are accessible for i examination from the nozzle bore only. The inlet nozzles are inaccessible for examination until the core barrelis removed. i 4 } During the first inspection period, the accessible 1 volumes of the nozzle-to-vessel welds and inside radius sections on four outlet nozzles would be { examined from the nozzle bore. The remaining 4 examinations for the four inlet and four outlet nozzles would be completed in the third inspection period, to i satisfy the requirements of Table IWB-2500-1, Examination Category B-D, Item Numbers B3.90 and j 3.100. The RV nozzle-to-safe end welds on the four outlet nozzles are ultrasonically examined from the inside diameter when the outlet nozzles are examined from the nozzle bore during the first inspection period. The four inlet nozzles would be examined in the third. inspection period to satisfy the requirements of Table IWB-2500-1 Examination Category B-F, Item Number B5.10. Performing all required examinations for the nozzle-to-vessel, inside radius sections and nozzle-to-safe end welds during the third inspection period in lieu of the first and third inspection periods provides several benefits for SQN:

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-6

1. A reduction in the number of times an automated device and associated materials and equipment must be installed on RV.
2. Compliance with ALARA Program
a. Reduction in Radwaste
b. Reduction in Personnel Exposure
3. Use of same vendor, personnel, procedures and equipment to examine welds would enhance quality of examination results and reduce possibilty for errors.
4. Overall cost savings to SQN with a reduction in hardship without compromising quality and safety.

SQN examined the nozzle-to-vessel welds and inside radius sections, and nozzle-to-safe end welds of the four outlet nozzles in both the first and third inspection periods of the first inspection interval.These additional examinations were performed to maintam a ten year frequency. Code Case N-521 was accepted by the ASME Code Committee as an alternative to the existing requirements. SQN ' Unit 2 satisfied the following conditions as required by the ASME Code Committee for use of Code Case N-521: (a) No inservice repairs or replacements by welding have ever been performed on any of the Nozzle-to-Vessel Welds, Inside Radius Sections, or Nozzle-to-Safe End Welds. (b) None of the Nozzle-to-Vessel Welds, Inside Radius Sections, or Nozzle-to Safe End Welds contains identified flaws or relevant conditions that currently require successive inspections in accordance with IWB-2420(b). (c) The unit is not in the first inspection interval. Alternate Examinations: As an alternative to the requirements of the 1989 Edition of ASME Section XI, SQN will perform examinations in accordance with the requirements of Code Case N-521.

1 SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-6 Justification: Code Case N-521 was accepted by the ASME Code Committee as an alternative to the provisions in ASME Section XI for " Deferral ofInspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and i Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel". The alternate examinations specified in the code case maintain an acceptable level l of quality and safety, with a reduction in hardship and costs to SQN.

== Conclusion:== Based on the abovejustification and the reasons stated previously, it is concluded that the alternate examination requirements of Code Case N-521 and the additional examinations performed in the third period of the first inspection interval at SQN provide an acceptable level of quality and safety. Therefore, j pursuant to 10CFR50.55a(a)(3), it is recommended that relief be granted. 1 Implementation Schedule: Code Case N-521 will be implemented during the J Second ISI Inspection Interval for Sequoyah Unit 2. 4 i l

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-7 Components: Longitudinal Welds in Class 1 and 2 Piping Class. ASME Code Class 1 and 2 (Equivalent) Examination Category: B-J, C-F-1, and C-F-2 i Item Number: B9.12, B9.22, C5.12, C5.22, C5.42, C5.52, C5.62 and C5.82 Code Requirement: ASME Section XI,1989 Edition, Table IWB-2500-1 Examination Category B-J, requires a volumetric and surface examination for Item Number B9.12, requires a surface examination for Item Number B9.22, in accordance with Footnote (4) "The examination includes at least a pipe-diameter length but not more than 12 in. of each longitudinal weld intersecting the circumferential welds required to be examined by Examination Categories B-F and B-J" ASME Section XI,1989 Edition Table IWC-2500-1, Examination Categories C-F-1 and C-F-2 requires a volumetric and surface examination for Item Numbers C5.12, C5.22, C5.52, C5.62 and a surface i examination for Item Numbers C5.42 and C5.82, to be performed of at least 2.5t, where "t" is the thickness of each longitudinal weld that intersects a circumferential weld required to be examined by Examination Categories C-F-1 and C-F-2. Alternative Requirements: Reliefis requested to use Code Case N-524, j " Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1," in lieu of the 1989 Edition of ASME Section XI as stated above. Basis for Relief: The alternative examination requirements of Code Case N-524 include examination of the subject j longitudinal piping welds at intersecting circumferential welds within the examination boundary of the circumferential weld. The following items support the basis for the revised longitudinal piping weld examination boundary: 1 4 t I i

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-7 Longitudinal piping welds are fabricated during the manufacturing process under controlled conditions, which produce higher quality welds and more uniform residual stress patterns. Longitudinal piping welds undergo heat treatment during the manufacturing process which enhances the material properties of the weld and reduces the residual stress created by welding. Throughout the Industry, results of previous weld inspections indicate that longitudinal welds have not been a safety concern, and there has been no evidence oflongitudinal weld defects compromising safety at nuclear power plants. Longitudinal welds have not been shown to bv susceptible to any particular degradation mechanism. I The areas oflongitudinal piping welds can require acid etching, eddy current examination, or a combination of NDE methods for location. This increases radiological exposure, radwaste generation, and overall costs for performance of ASME Section XI examinations. Note: Currently at SQN all ASME Class 1 equivalent piping (Examination Categoiy B-J, Item Numbers B9.12 and B9.22)is seamless. Alternate Examinations: As an alternative to the requirements of the 1989 Edition of ASME Section XI, SQN will perform examinations in accordance with the requirements of Code Case N-524 as follows: (a) When only a surface examination is required, examination oflongitudinal piping welds is not required beyond those portions of the welds within the examination boundaries ofintersecting circumferential welds. (b) When both surface and volumetric examinations are required, examination oflongitudinal piping welds is not required beyond those portions of the welds within the examination boundaries ofintersecting circumferential welds provided the following requirements are met: J

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-7 (1) Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2)Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds. Justification: Code Case N-524 was accepted by the ASME Code Committee as an alternative to t:a provisions in ASME Section XI for the examim. tion oflongitudinal piping welds. The alternate examinations specified in the code case maintain an acceptable level of safety and are sufficient to the continued stmetural integrity oflongitudinal piping welds.

== Conclusion:== Based on the abovejustification and the reasons stated previously, it is concluded that the alternate examination requirements of Code Case N-524 provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), it is recommended that relief be granted. Implementation Schedule: Code Case N-524 will be implemented during the Second ISI Inspection Interval for Sequoyah Unit 1. 'l e

4 i e i SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-7 Comoonents: Longitudinal Welds in Class 1 and 2 Piping i Class. ASME Code Class 1 and 2 (Equivalent) 4 Examination Category: B-J, C-F-1, and C-F-2 i Item Number: B9.12, B9.22, C5.12, C5.22, C5.42, C5.52, C5.62 and l C5.82 4 Code Reauirement: ASME Section XI,1989 Edition, Table IWB-2500-1 4 Examination Category B-J, requires a volumetric and surface exam'mation for Item Number B9.12, requires a surface examination for Item Number B9.22, in accordance with Footnote (4) "The examination includes at least a pipe-diameter length but not more i than 12 in. of each longitudinal weld intersecting the i circumferential welds required to be examined by Examination Categories B-F and B-J". f ASME Section XI,1989 Edition Table IWC-2500-1, i Examination Categories C-F-1 and C-F-2 requires a j volumetric and surface examination for Item Numbers j C5.12, C5.22, C5.52, C5.62 and a surface i examination for Item Numbers C5.42 and C5.82, to be I performed of at least 2.5t, where "t" is the thickness i of each longitudinal weld that intersects a circumferential weld required to be examined by j Examination Categories C-F-1 and C-F-2. Alternative Requirements: Reliefis requested to use Code Case N-524, " Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1," in lieu of the 1989 Edition of ASME Section XI as stated above. Basis for Relief: The alternative examination requirements of Code Case N-524 include examination of the subject longitudinal piping welds at intersecting circumferential welds within the examination boundary of the circumferential weld. The following items support the basis for the revised longitudinal piping weld examination boundary: A

l i SEQUOYAH NUCLEAR PLANT j REQUEST FOR RELIEF 2-ISI-7 j Longitudinal piping welds are fabricated during the manufacturing process under controlled conditions, which produce higher quality welds and more uniform i residual stress patterns. i j Longitudinal piping welds undergo heat treatment during the manufacturing process which enhances the material properties of the weld and reduces the residual stress created by welding. Throughout the Industiy, results of previous weld inspections indicate that longitudinal welds have not been a safety concern, and there has been no evidence oflongitudinal weld defects compromising safety at nudear power plants. Longitudinal welds have not been shown to be susceptible to any particular degradation mechanism. The areas oflongitudinal piping welds can require acid etching, eddy current examination, or a combination of NDE methods for location. This increases radiological exposure, radwaste generation, and overall costs for performance of ASME Section XI examinations. Note: Currently at SQN all ASME Class 1 equivalent piping (Examination Category B-J, Item Numbers B9.12 and B9.22) is seamless. Alternate Examinations: As an alternative to the requirements of the 1989 Edition of ASME Section XI, SQN will perform examinations in accordance with the requirements of Code Case N-524 as follows: (a) When only a surface examination is required, examination oflongitudinal piping welds is not required beyond those portions of the welds within the examination boundaries ofintersecting circumferential welds. (b) When both surface and volumetric examinations are required, examination oflongitudinal piping welds is not required beyond those portions of the welds within the examination boundaries ofintersecting circumferential welds provided the follow'mg requirements are met: ..i

1 SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-7 (1) Where longitudinal welds are specified and locations are known, en::snation requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2)Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds. Justification: Code Case N-524 was accepted by the ASME Code Committee as an alternative to the provisions in i l ASME Section XI for the examination oflongitudinal piping welds. The alternate examinations specified in the code case maintain an acceptable level of safety and are sufficient to the continued structuralintegrity i oflongitudinal piping welds.

== Conclusion:== Based on the abovejustification and the reasons stated previously, it is concluded that the alternate examination requirements of Code Case N-524 provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), it is recommended that relief be granted. Imolementation Schedule: Code Case N-524 will be implemented during the Second ISI Inspection Interval for Sequoyah Unit 2. i ) J

ITEM 2.C. As requested SQN is providing additional information for Requests for Relief 1-ISI-3, (Unit 1) and 2-ISI-3 (Unit 2) in order to seek relief from examining integrally welded attachments and component supports in Auxiliary Feedwater System (AFW) on lines NPS 1 and smaller.

1 a i ITEM 2.C. l f SQN stated that it was an unnecessary burden to examine the integrally welded attachments l and component supports on NPS 1 and smaller piping in the ASME Class 3 Auxiliary i Feedwater System. The 1989 Edition of ASME Section XI has no requirements to examine l integrally welded attachments on NPS 1 and smaller piping in ASME Class 1 and 2 systems. i DISCUSSION l The 1991 Addenda resulted in essentially no changes in piping examination requirements for 1 Class 1 and 2, but Class 3 requirements included an examination scope decrease. The incorporation of the NPS 1 and smaller exemption for Auxiliary Feedwater Systems in the { 1991 Addenda appeared to be added due to an omission in the 1989 and earlier Editions. There is no reason to impose more stringent requirements for Class 3 components than those j required for Class 1 and 2. i l The Auxiliary Feedwater System (AFW) at SQN consists of two motor driven pumps and one turbine driven pump for each Unit. Each of the motor driven pumps supplies feedwater to two steam generators and the turbine driven pump supplies feedwater to all four steam generators. Normal suction for the AFW pumps is supplied by the condensate storage tanks. A backup safety related source is from the Essential Raw Cooling Water (ERCW ) system. Additionally the fire protection system can be aligned to AFW to supply water to the steam generators during a flood. The attached Table 2C gives a summary of the AFW lines associated with the motor driven pumps, turbine driven pumps and steam generators. j Based upon initial walkdowns the number ofintegral attachments is low, approximately 11 per unit. The design of the type of supports used with the integral attachments on these lines (NPS I and smaller) are very strongly constmeted. They consist of a length oflarger diameter pipe which is penetrated by the NPS I and smaller line at right angles. The smaller line is then welded at both ends to the larger diameter pipe using a full circumference fillet weld. The larger diameter pipe only serves as a support and is welded to a process line at one end. Tids type of construction provides substantial bracing independent of the welds and therefore any potential damage to the welds would not significantly impact the function of the support. Problems with these integral attachments are not anticipated to cause any loss of function of the associated NPS I and smaller line. The adoption of Code Case N-509 is not a reduction of 90% of the required examinations for integrally welded attachments, but rather requires a 10% sample of all Class 3 non-exempt integrally welded attachments. Code Case N-491, which was authorized for use by Regulatory Guide 1.147, could actually reduce the number ofintegral attachments required to be examined due to the 1989 Code requirements that 10% of the integrally welded attachments associated with the component supports selected for examination require examination. By adopting Code Case N-509, SQN proposes to examine 10% of all non-exempt integrally welded attachments for Class 3. Based on the reasons stated above, SQN believes the proposed examination plan v.ith the associated Request for Relief satisfies ASME Code requirements without any reduc

  • ion in quality and safety.

4 TABLE 2C Drawing Number 1,2 - 47W803-2,3 UNITS 1 & 2 i MOTOR DRIVEN AFW PUMPS TURBINE DRIVEN AFW PUMPS 1" Drain Lines 3 1" Drain Lines 3 3/4" Drain lines 2 3/4" Drain Lines 1 1/2" x 3/8" Vent / Drain lines 4 1/2" Drain Lines 1 3/4" Vent lines 2 1/2" x 3/8" Vent / Drain lines 2 1" Instrument lines 2 1" Instrument lines 1 1/2" Instrument lines 2 3/4" x 1/2" Instrument lines 1 3/4" Sampling lines 2 1/2" Instrument lines 4 Subtotal 17 3/4" Sampling lines 1 3/4" x 1/2" Relief Valve lines 1 1 1" Steam supply 1 3/4" Drain lines 1 1/2" Blowofflines 3 1" Stem leakofflines 1 1/2" Stem leakofflines 5 Subtotal 26 STEAM GENERATORS

  1. 1
  2. 2
  3. 3
  4. 4 1" Drain lines 2

2 2 2 1" Vent lines 2 2 2 1 1" By Pass lines 2 2 2 2 1 1" Misc. lines 1 1 1 1 1/2" Lines 1 1 1 1 1" Instrument lines 1 1 1 1 1/2" Instrument lines 1 1 1 1 10 10 10 9 Subtotal 39

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-3 Components: Auxiliary Feedwater Piping NPS 1 and Smaller

Class, ASME Code Class 3 (Equivalent)

Section XI Edition: 1989 Edition Code Paragraph: IWD-1220.1 Code Requirement: Integral attachments of supports and restraints to components that are ] Nominal Pipe Size (NPS) 4 and j smaller within the system i boundaries ofExamination l Categories D-A, D-B and D-C of Table IWD-2500-1 shall be exempt j from the visual examination VT-3, except for PWR Auxiliary Feedwater System. Code Rwuirement from Integral attachments of supports and Which Reliefis Reautsiqd.: restraints to components that are NPS I and smaller in the Auxiliary Feedwater System within the system boundaries ofExamination Categories D-A, D-B and D-C of Table IWD-2500-1 are not exempt from the visual examination VT-3. Alternate Reauirement : Integral attachments of supports and restraints that are NPS 4 and smaller but greater than NPS 1 in the Auxiliary Feedwater System within the system boundaries of Examination Categories D-A, D-B and D-C of Table IWD-2500-1 shall be examined in accordance with the visual examiationmethod. Basis for Relief: The majority of NPS 1 and smaller auxiliary feedwater piping is field routed. Identification of supports

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-3 and the integrally welded attachments on this piping would be labor intensive. The identification j process would require walkdowns of vent lines, drain lines, i instrumentation lines and sampling lines. Subsequent to the walkdowns, substantial resources will be required to sketch the applicable lines. Further resources will be required to check, verify and maintain the resulting sketches. NPS I and smaller piping is not analyzed for pipe rupture, due to the low safety significance associated with rupture of these lines. Sequoyah did not identify any significant problems with integrally welded attachments during the first inspection interval. ASME Section XI Codes 1991 Addenda and later incorporated the NPS 1 and smaller exemption requirements for Auxiliary Feedwater System. The exemption includes piping NPS 1 and smaller and exemptions for vessels, pumps, and valves and their connections in piping NPS 1 and smaller. Sequoyah believes that it is an unnecessary burden to inspect supports and integrally welded attachments on NPS 1 and smaller piping in the Class 3 Auxiliary Feedwater System. The inspection of these items willimpose costs without compromising the safety or quality of the unit.

i SEQUOYAH NUCLEIR PLANT REQUEST FOR RELIEF 1-ISI-3 Examinations Performed: SQN will perform examinations as required by the 1989 Edition of ASME Section XI Code on the non-exempted components greater than NPS 1 na the ASME Code Class 3 PWR Auxiliary Feedwater System. Justification: This request is to use only the NPS I and smaller exemption on Auxiliary Feedwater System piping. It is an unnecessary burden to examine supports and integrally welded attachments on NPS I and smaller piping in the Class 3 Auxiliary Feedwater System. Even for the Class 1 and 2 systems in the 1989 Edition of ASME Section XI, there are no requirements to examine supports and integrally welded attachments on NPS 1 and smaller. Prior to the Winter 1980 Addenda, there was no requirement to examine Class 3 NPS I and smaller Auxiliary Feedwater System piping supports and integrally welded attachments. The later 1991 Addenda IWD-1220 incorporated the NPS 1 and smaller exemption to provide clarification on the exemptions. Problems with these integral attachments are not anticipated to cause any loss of function of the associated NPS 1 and smaller line.

== Conclusion:== Based on the abovejustification,it is concluded that the code requirement of no exemption for the NPS I and smaller on the Auxiliary Feedwater System is impractical. SQN's examinations on the ASME Code Class 3 Auxiliary Feedwater System components greater than NPS I as required by the ASME

1 4 i SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 1-ISI-3 i i Section XI Code will provide an ~ i acceptable level ofquality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), it is recommended that reliefbe granted. 1 i )

i SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-3 Components: Auxiliary Feedwater Piping NPS 1 and Smaller l Class. ASME Code Class 3 (Equivalent) Section XI Edition: 1989 Edition Code Paragraoh: IWD-1220.1 Code Requirement: Integral attachments of supports and restraints to components that are Nominal Pipe Size (NPS) 4 and i smaller within the system boundaries ofExamination j Categories D-A, D-B and D-C of Table IWD-2500-1 shall be exempt from the visual examination VT-3, except for PWR Auxiliary Feedwater System. Code Requirement from Integral attachments of supports and j Which Reliefis Reauested ; restraints to components that are NPS 1 and smaller in the Auxiliary i Feedwater System within the system boundaries ofExamination l Categories D-A, D-B and D-C of i Table IWD-2500-1 are not exempt from the visual examination VT-3. i Alternate Reauirement : Integral attachments of supports and restraints that are NPS 4 and smaller but greater than NPS 1 in the Auxiliary Feedwater System within the system boundaries ofExamination ' ategories C D-A, D-B and D-C of Table IWD-2500-1 shall be examined in accordance with the visual examiation method. Basis for Relief: The majority ofNPS I and smaller auxiliary feedwater piping is field routed. Identification of supports and the integrally welded )

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-3 t 1 attachments on this piping would be labor intensive. The identification process would require walkdowns of vent lines, drain lines, instrumentation lines and sampling lines. Subsequent to the walkdowns, substantial resources will be i required to sketch the applicable lines. Further resources will be l required to check, verify and maintain the resulting sketches. NPS I and smaller piping is not analyzed for pipe rupture, due to the low safety significance associated with rupture of these lines. Sequoyah did not identify any significant problems i with integrally welded attachments i during the first inspection interval. ASME Section XI Codes 1991 Addenda and late incorporated the i NPS 1 and smal exemption I requirements for H2iliary Feedwater System. The exemption includes piping NPS I and smaller and exemptions for vessels, pumps, and valves and their connections in piping NPS 1 and smaller. Sequoyah believes that it is an f unnecessary burden to inspect l supports and integally welded attachments on NPS 1 and smaller piping in the Class 3 Auxiliary Feedwater System. The inspection of these items willimpose costs without compromising the safety or quality of the unit. ]

SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-3 i Examinations Performed: SQN will perform examinations as required by the 1989 Edition of l ASME Section XI Code on the non-exempted components greater than i NPS 1 in the ASME Code Class 3 PWR Auxiliary Feedwater System. j Justification: This request is to use only the NPS 1 and smaller exemption on Auxiliary Feedwater System piping. It is an unnecessary burden to examine supports and integrally welded attachments on NPS 1 and smaller piping in the Class 3 Auxiliary Feedwater System. Even for the Class 1 and 2 systems in the 1989 Edition of ASME Section XI, there are no requirements to examine supports and integrally welded attachments on NPS 1 and smaller. Prior to the Winter 1980 Addenda, there was no requirement to examine Class 3 NPS 1 and smaller Auxiliary Feedwater 1 System piping supports and integrally welded attachments. The later 1991 Addenda IWD-1220 incorporated the NPS I and smaller exemption to provide clarification on the exemptions. Problems with these integral attachments are not anticipated to cause any loss of function of the associated NPS 1 and ] smaller line.

== Conclusion:== Based on the abovejustification, it is concluded that the code requirement of no exemption for the NPS I and smaller on the Auxiliary Feedwater System is impractical. SQN's examinations on the ASME Code Class 3 Auxiliary Feedwater System components greater than l NPS 1 as required by the ASME )

i SEQUOYAH NUCLEAR PLANT REQUEST FOR RELIEF 2-ISI-3 ) Section XI Code will provide an acceptable level of quality and safety. Therefore, pursuant to 10CFR50.55a(a)(3), it is recommended that relief be granted.}}