Forwards Amends 162 & 146 to Licenses NPF-10 & NPF-15, Respectively,Consisting of Proposed Change Number 465, Revising Unit 2 Amend 27 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks
ML20117J436
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/29/1996
From: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117J437 List:
References
NUDOCS 9605310169
Download: ML20117J436 (2)


Text

.

l

$OUTJiLRN CAUFORNM si Dwight E. Nunn

{ Vice President An EDISON IN1LRhA110NAL Company l

May 29, 1996 U. S. Nuclear Regulatory Commission I Attention: Document Control Desk Washington, D.C. 20555 Gentlemen: l l

Subject:

Docket Nos. 50-361 and 50-362 '

Amendment Application Nos. 162 and 146 Proposed Change Number 465 i Change to Technical Specification 3.5 '

" Emergency Core Cooling Systems (ECCS)"

San Onofre Nuclear Generating Station Units 2 and 3 Enclosed are Amendment Application Numbers 162 and 146 to Facility Operating Licenses NPF-10 and NPF-15, respectively, for the San Onofre Nuclear Generating Station Units 2 and 3. These amendment applications consist of Proposed Change Number 465 (PCN-465). PCN 465 is a request to revise the i Unit 2 Amendment No. 127 and Unit 3 Amendment No. 116 a oved Technical j Specification (TS) 3.5.1, " Safety Injection Tanks (SITS l Southern California Edison (Edison) is extending the operating cycle to 1 approximately 590 effective full power days. To accomplish this cycle length extension, Edison is increasing the initial Uranium-235 fuel enrichment above 4.1 w/o up to 4.8 w/o and changing the burnable poison from B4 C to Erbia. ,

Erbia is an Asia Brown Boveri Combustion Engineering term used to describe an '

Erbium-0xide Er230 and fuel mixture.

Based on the completed analyses supporting the Cycle 9 core reload analysis, the only TS change needed to support the planned increased cycle length is to increase the minimum boron concentration in the safety injection tanks from 1850 parts per million (ppm) to 2200 ppm. No other TS change or TS Basis change is required. The Licensee Controlled Specifications for the Boric Acid Make-up tank boron concentration and the refueling minimum boron concentration will be changed via internal Edison procedures.

Edison believes this change in the SIT minimum boron concentration limit is, in essence, an administrative change. The SITS are filled from the refueling water storage tank (RWST), which has a technical specification minimum boron concentration requirement of 2350 ppm. Edison maintains the RWST boron concentration higher than the minimum limit, and, as a result, for the past several years the SIT boron concentration has been approximately 2500 ppm, even though the technical specification lower limit is 1850 ppm. Therefore, 3 changing the SIT minimum boron concentration from 1850 ppm to 2200 ppm does not involve a physical change to the plant.

9605310169 960529 PDR ADOCK 05000361 P PDR P.O.Hox128 0.LUJgG" l San Clemente. CA 92o72

,u - 3, ,

i

L ,

Document Control Desk l The cycle extension will result in a cost savings to Edison, et al., due to l extended cycle lengths and less fuel assemblies being changed out each refueling. This savings will exceed the minimum criteria of $100,000 over the remaining-life of the plant (s) established for a Cost Beneficial Licensing Action (CBLA) submittal. Therefore, these amendment applications are considered CBLAs.

Your approval of these amendment applications is requested by December 15, 1996, to support the San Onofre Unit 2 Cycle 9 refueling outage, which is anticipated to begin on November 30, 1996, and end on February 3,1997. Edison requests approval of Amendment Application Numbers 162 and 146 to be effective as of the date of issuance, and to be implemented within 30 days from the date of issuance. This will provide adequate time for the necessary procedure changes and training on the new Technical Specifications.

Sincerely, \

C E. w i

\

Enclosure cc: L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resiaent Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 l