Forwards Changes to Physical Security Plan.Changes Withheld
ML20117G048
Person / Time
Site: Fort Calhoun 
Issue date: 05/03/1985
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-85-182, NUDOCS 8505130399
Download: ML20117G048 (2)


Text

__

l l

.w Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536 4000 May 3, 1985

!\\

r LIC-85-182 h6 q=

\\

hMT '

3 f

Mr. Richard P. Denise, Director Division of Resident, Reactor Project

& Engineering Programs U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

References:

(1) Docket No. 50-285 (2) Letter OPPD (R. L. Andrews) to NRC (J. M. Taylor) dated March 15, 1985

Dear Mr. Denise:

Fort Calhoun Station Physical Security Plan Change In Reference (2), the District stated that a revised Physical Security Plan (PSP) would be submitted to the NRC on May 1, 1985.

This review was comprehensive and complete. As a result of this review, changes have been proposed to the PSP.

These PSP changes reflect enhancements or clarifications to the PSP. The changes that have been made to the PSP are of a type that would normally be submitted pur-suant to 10 CFR 50.54(p).

Based on the number and the extent of the changes nade to the PSP, it was agreed in a telephone call between the District and NRC Region IV personnel on April 30, 1985, that a draft working copy of the revised PSP would be submitted to Region IV for Commission review.

It was also stated that the District would meet with Region IV, if necessary, to discuss the PSP changes prior to a formal 10 CFR 54(p) submittal. The District believes this approach will al-l low an exchange of information which would help expedite NRC review and final con-currence.

E [

Y

71 3I 8505130399 850503 PDR ADOCK 05000513

/,

I F

PDR

$ 3Cu.

9 gg 45 W4 f.mployment with Equal Opportunity

%w Femnie

I ya,

%Q

-p..

e LIC-85-182 Page 2

~~

l Therefore, please find attached a _ draft copy of the PSP.

Your prompt considera-tion.would be appreciated.

Si e

R. L. Andrews Division Manager Nuclear Production RLA/JJF/dao Attachment cc: LeBoeuf, Lamb, Leiby & MacRae -(without attachment) 1333 New Hampshire Avenue, N.W.

Washington, DC 20036 Mr. E. G. Tourigny, NRC Project Manager (withoutattachment)

Mr. L. A. Yandell, NRC Senior Resident Inspector (withoutattachment)

~

km