ML20117A025
| ML20117A025 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/08/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-32172-TDS, DER-85-01, DER-85-1, NUDOCS 8505080030 | |
| Download: ML20117A025 (2) | |
Text
c
?5 Ji?ED Arizona Nuclear Power Project
.ig PHOENIX. ARIZONA 85072-2034 hh P.o. Box 52034 e
'O April 8,1985 ANPP-32331-TDS/PJC U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor' Safety and Projects
Subject:
Time Extension for Report - DER 85-01 A 50.55(e) Potentially Reportable Deficiency Relating To The Auxiliary Feedwater Pump Drive Turbine
- File
- 85-019-026; D.4.33.2
Reference:
(A) Telephone conversation between A. Hon and T. Bradish on Janury 25, 1985 (B) ANPP-31974, dated February 21, 1985 (Interim Report)
(C) ANPP-32172, dated March 19, 1985 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Refer-ence (A), an Interim Report was transmitted by Reference (B), and a time extension was submitted by Reference (C). At that time, it was estimated that a Final Report would be available by April 5, 1985.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 1, 1985, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, g50
$5 8
S E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/PJC/nj cc:
See Page Two
<\\o SE,,17
( =.-
tL.
- r.
-ANPP-32331-TDS/PJC Mr.
D..F. Kirsch' DER 85-01 Page Two:
e cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear-Regulatory Commission Washington, D.
C.-
20555 e
D. B.'Karner W. E. Ide D. B. Fasnacht A. C. Rogers L.
A.- Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum-J. M. Allen D. Canady A. C. Gehr W. J. Stubblefield W..G. Bingham R. L. Patterson R. W. Welcher H. D. Foster
.D. R. Hawkinson R. P. Zimmerman M. L. Clyde
-M. Matt T. J. Bloom D. N. Stover J. D. Houchen J. E..Kirby.
Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339