ML20116N609

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Songs,Units 2 & 3. Informs That There Were No Challenges to Safety Valves,No Changes to ODCM & No Major Changes to Units 2 & 3 Radioactive Waste Treatment Sys During Reporting Period
ML20116N609
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/16/1992
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116N620 List:
References
NUDOCS 9211240077
Download: ML20116N609 (1)


Text

m Y. V,4P ~ )

"M '

g Southern California Edison Company 23 PARKER STF4EE'T IRVINE. CALIFORNIA Es271B WAL T E H C MAFiSH 1ELU*W)NE November 16, 1992 g.. u...a

  • wyAm A~ce n NIJCL C AF4 fif Gott AT C)HY AF F Ath$

U. S. Nuclear Regulatory Commission Document Control Desk i

Washington, D.C.

20555 i

Subject:

Docket Nos. 50-361 and 50-362 I

Monthly Operating Reports for October 1992 San Onofre Nuclear Generating Station, Units 2 and 3 I

Technical Specification 6.9.1.10 to f aci ity Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience;.all challenges to safety. valves; any changes to the Offsite Dose Calculation Manual (0DCM); and any major changes to the radioactive waste treatment _ system.- All s

covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made. effective.

This letter transmits the October 1992 Monthly Operating Reports for Units 2 and L

3, respectively.

There were no challenges to safety valves, no changes to the i

ODCM, and no major changes to the Units 2 and adioactive waste _ treatment syctems during the reporting period.

1 If you require any additional information,-please let me know.

Very truly yours, l

u l

l l-Enclosures cc:

J. B. Martin. (Regional Administrator, USNRC Region V) l M. B. Fields (NRC Project Manager, Units 2 and 3)

C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3) 9211240077 921116 PDR ADGCK 05000361 R

PDR

/