ML20116N360
| ML20116N360 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/21/1992 |
| From: | Bradley Jones AKIN, GUMP, STRAUSS, HAUER & FELD (FORMERLY AKIN |
| To: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| FOIA-92-88 NUDOCS 9211230360 | |
| Download: ML20116N360 (2) | |
Text
_ _ _ _ _ _ _ _ _ _
e~,
AKIN, GUMP, HAUcR & Fcto, L.L.P.
AttoRNtts AT LAW
,,po,,,y g,y,gg,
4:00 espat City CENitm A ht0'$t(#(D LtMitt0 LuMitt PantNtesMi>
til CONontss AyCNut INCLUD*NO Prot tSsch AL Com>Cmat CNS Austin. TCmAs 78701
!?OO Pacific avf Nut 15121499-6200 DALtAs itmas 75#0146te 1333 NCW HAU$HIRC AVENUE, N W, Sulf C 400 1500 NatiONasANN PLAZA 300 coNytNT statti C3 avtwur tovist e s No 7 W ASHINGTON. D C. 20o36 SAN ANTONto TCAAs 7670S
' 1050 smusstLa stLOlvM I o21 SM4N 15ial 270 0800 1018132.F 535 Rf6 il ras escal 887 4288 4558 7,1 tov,s,A,.. s,,, C,
neitte e oimace pial eve. eta veoseost.
Houston, ttxAs 77002 17131220/5000 February 21, 1992 DY_ llAND DELIVER't FREIDOM Of INFORMATION Donnie 11. Grimsley, Director ACT REQUEET Division of Freedom of Information 4 Jg g and Publications Service U.S. Nuclear Regulatory Commission g g g,y 9 Washington, D.C.
20555
Dear Mr. Grimsley:
This is a request pursuant to t'm Freedom of Information Act, 5 U.S.C. 552, and 10 CFR Part 9 for documents relating to Palo Verde Units 1, 2&3, and more particularly described below.
For the purpose of this request, the term " document" means all memoranda, letters, filings, testimony, exhibits, contracts, transcripts, minutes, notes, drafts, studies, analyses, reports, maps, diagrams, charts, books, articles, pictures, printouts, tapes, or other written, graphic, or computerized information in any form which constitutes agency records under the Freedom of Information Act.
The documents we are requesting can more particularly be described as:
1.
All documents, other than the NRC Augmented Inspection Team (AIT) report forwarded to Arizona Public Service (APS) on April 19, 1989 and the Diagpostic Evaluation Team (DET)-Report forwarded-to APS on March 16, 1990, which discuss, ovaluate, analyze or otherwise address the causes of the.1989 outages at Palo Verde Units 1, 2, and 3; and the basis for the NRC confirmation of Action letters issued on March 3, 1989;.
March 7, 1989; March 28, 1989; June 28, 1989; and December 24, 1989-that addressed the Palo Verde Units.
This request includes, but is not limited to, documents which address the causes of the shutdown resulting in the 1989 outages at all three Palo Verde Units and the causes of the 1989 outages exceeding the formally or informally scheduled or planned outage durations.
~ JONCS92-08 PDR Mi
kKIN, GuMP, HAVER 6 FClo, L.L R Donnio 11. Grimsley February 21, 1992 Page 2 2.
All transcripts, tapes or other record of interviews conducted during or in support of the NRC Augmented Inspection Team's review of the March 3, 1989 trip of palo Verde Unit 3.
The AIT review was reported in an AIT report forwarded to APS on April 9, 1989.
3.
All transcripts, tapes or other record of interviews conducted duriny or in support of the Diagnostic Evaluation Team s review of Palo Verde performance. The DET review was reported in a DET report transmitted to APS on March 16, 1990.
Pursuant to 5 U.S.C. 9552(a)(6), a response to this request is required in ten days.
We are willing to pay all necessary search and copy fees associated with this request.
Please notify the undersigned at (202) 887-4558 if these fees are expected to exceed $450.00.
If any portion of this request is denied, please provide a detailed explanation of the reasons for the denial, as required by 5 U.S.C. S 552(a)(6).
- Sincere,
(,M Bradle'
.J ue s i
+
-,#y
-