ML20116N238

From kanterella
Jump to navigation Jump to search
Requests Relief from Inservice Insp Requirements for Exercising & Leak Rate Tests for Reactor Instrumentation Protection & Excess Flow Check Valves on Instrumentation Lines Penetrating Primary Containment
ML20116N238
Person / Time
Site: Brunswick  
Issue date: 05/02/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
NLS-85-079, NLS-85-79, NUDOCS 8505070076
Download: ML20116N238 (2)


Text

h, SERIAL: NLS-85-079 Carolina Power & Light Company MAY 0 21985 Director of Nuclear Reactor Regulation Attention:

Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing _

United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 IN-SERVICE INSPECTION - ASME CODE RELIEF REQUEST

Dear Mr. Vassallo:

SUMMARY

Carolina Power & Light Company (CP&L) currently performs In-Service Inspections at the Brunswick Steam Electric Plant Unit Nos. I and 2 in accordance with the 1977 edition through the summer of 1978 addenda of the ASME Boiler and Pressure Vessel Code,Section XI. The Code of Federal Regulations, Title 10, Part 50.55a grants a licensee the right to request relief from requirements of the ASME code when the licensee has determined that these requirements are impractical. The purpose of this letter is to request relief from exercising and leak rate tests for certain Category A, C valves. A detailed description of the relief request, alternate testing, and justification follows.

RELIEF REQUEST Relief is requested from the valve exercising and leak rate tests for the Reactor Instrumentation Protection (RIP) and the excess flow check valves on instrumentation lines penetrating the primary containment. These valves are classified by the ASME code article IWV-2000 as Category A, C. As Category A, C, these valves are required to be exercised at least once every 3 months and to be leak rate tested not less than once every two years. (See ASME Code Articles IWV-3411,IWV-3422, and IWV-3521).

ALTERNATE TESTING In lieu of the testing requirements described above, CP&L proposes to perform functional testing to verify operability of the applicable valves every 18 months in accordance with the Brunswick Technical Specification Surveillance Requirement No. 4.6.3.4.

JUSTIFICATION The subject valves are installed on instrument lines penetrating the primary containment and are designed to close on a line break downstream of the valves (i.e., a line break outside containment). Instrument lines are sized and/or orificed in accordance with q.

M

\\0 h

Nk $bh24 0

PDR 0

Y.0 m r.y.ii..m. si,.et

  • P. O. Box 155, e naiegn, N C. 27602 g

glf

i Mr. D. B. Vassallo Page 2 Regulatory Guide 1.11 such that in the event of a rupture, offsite doses will be substantially below the guidelines of 10 CFR 100. Standard Review Plan Section 6.2.6 states, " Leak testing of instrumentation lines that penetrate containment may be done in conjunction with either the local leak rate tests or the containment integrated leak rate test." Brunswick satisfies this leak testing requirement during the containment integrated leak rate test. More frequent testing of these valves would unnecessarily interfere with their associated instruments which are used to monitor plant parameters during normal operations.

Carolina Power & Light Company has reviewed this request in accordance with 10CFR170.12, and a check for $150 in payment of the required fee is enclosed.

Should you have any questions concerning this request, please contact Mr. Sherwood R.

Zimmerman at (919) 836-6242.

Yours very truly Y

A. B. Cutter - Vice Presid nt Nuclear Engineering & Licensing RWS/pgp (1250RWS)

Enclosure cc:

Mr. L. W. Garner (NRC-BNP)

Dr. 3. Nelson Grace (NRC-Ril)

Mr. M. Grotenhuis (NRC)

A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company.

h k 7}%<rw.m..

My commission expires ///A7/f9 NOTARY 5

I k6 PUBLIC c' l C

,,.OU M,

I L_ _