|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
.
OPERATING DATA REPORT DOCKET ND 50-413 DATE Acoust 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Name: Catauba 1
- 2. Reporting Period: July 1, 1996-July 31, 1996
- 3. Licensed Thereal Power (Mt): 3411
- 4. Nameplate Rating (Gross Welt 1305e Notes eNaseplate Rating
- 9. Design Electrical Rating (Net Mel: 1145 (6ress MWel calculated as
- 6. Maxieue Dependable Capacity (6ross Mel: !!92 1450.000 MYA x .90 power
- 7. Marisue Dependable Capacity (Net Me): 1129 factor per Page lit,
- 8. If Changes Occur in Capacity Ratings (itees Nueber 3 Through 71 Since Last NUREG-0020.
Report. Elve Reascns:
- 9. Power Level To Which Restricted, If Any (Net Mel:
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cueulative
!!. Hours in Reporting Period 744.0 5111.0 97224.0
- 12. Naaber of Hours Reactor Was Critical 0.0 3812.7 76106.4 .
- 13. Reatter Reserve Shutdoun Hours - - --0-- --0--
14.' Hours Generator On-Line 0.0 3773.B 74862.5
- 15. Unit Reserve Shutdown Hours --0-- --0--
- 16. Gross Thereal Energy Generated (MH) 0 12337402 244287661 i
- 17. Gross Electrical Energy Generated ( MH) 0 4420713 86323524- i IB. Net Electrical Energy Generated (MWH1 -5060 4171950 61216939 l'
- 19. Unit Service Factor 0.0 73.8 77.0
- 20. Unit Availability Factor 0.0 73.8 77.0
- 21. Unit Capacity Factor (Using MDC Net) 0.0 72.3 73.8
- 22. Unit Capacity Factor (Using DER Net) 0.0 71.3 73.0
- 23. Unit Forced Outage Rate 0.0 4.1 B.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, ared Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Ccenercial Operationli Forecast Achieved I
INITIALCRITICALITY l i
INITIAL ELECTRICITY COMERCIAL OPERATION
]
9608210033 960815 PDR ADOCK 05000413 R PDR
l OPERATIN6 DATA REPORT i
\ .
l DOCKET NO 50-413 UNIT Catawba 1 DATE Aunust 15. 1996 COMPLETED BY R.A. Williams l TELEPHONE 704-382-5346 l
MONTH July. 1996 lE' . AYERAGE DAILY POE R LEVEL lAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i 1 0 17 0 2 0 18 0 l
l 3 0 19 0 l 4 0 20 0 9~ 0 21 0 6 0 22 0 7 0 23 0-0 0 M 0 _
l l 9 0 5 0 i
10 0 26 0 11 0 27 0 12 0 28 0 l
13 0 29 0 14 0 30 0 13 0 31 0 16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 .
UNIT NAME CA1 Anna 1 DATE us/13/sb__-
REPORT MONTH- July 1996 COMPLETED BY x. A. w1111ams TELEPHONE t>usJ-3u2-d346 (1) (2) (3) (4) (5)
R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3 96- 1 S 744.00 C --
RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE AND MAINTENACE 1
I.
(1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data >
B-Maintenance or test 2-Manual Scram .Enty Sneets For Licensee l:
C-Refueling 3-Automatic Scram Event Report (LER) r D-Regulato w Restriction 4-Other (Explain) File ( M EG-0161) ;
l E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
P
e 1
DOCKET: 50-413 UNIT: Catawba i Date: 08/15/96 I
NARRATIVE
SUMMARY
MONTH: July,1996 Catawba Unit I began the month of July in end-of-cycle 09 refueling and maintenance outage which includes steam generator replacement work. The unit remained in the outage the entire month.
j r
Prepared by: R. A. Williams Telephone: (704)- 382-5346
a n - ---. -. - - -
i MONTHLY REFUELING INFORMATION REOUEST
- 1. . Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: Currently Refueline
'3. Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be? ).
If no, has reload design and core configuration been reviewed by Safety Review Committee l regarding unreviewed safety questions? )
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: j91 (b) in the spent fuel pool: p]2
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
September 2009 DUKE POWER COMPANY DATE: August 15.1996 i
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 '
. t OPERATING DATA RFFORT DOCKET ND 50-414 DATE Au3ust 15.1996 OPERATING STATUS COMPLETED By R.A. Williaes '
TELEPHONE 704-382-5346
- 1. Unit h ee Catawba 2
- 2. Reporting Period: July 1, 1996-July 31, 1996
- 3. Licensed Thermal Power (MWil 3411
- 4. Naseplate Rating (Gross MWel 1305e Notes eNaseplate Rating
- 9. Design Electrical Rating (Net MWel: 1145 (Gross MWel calculated as
- 6. Maxisus Dependable rapacity (6ross MWe): 1192 1450.000 MVA : .90 power
- 7. Maxinus Dependable Capacity (Net MWel: !!29 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itees Nusber 3 Through 71 Since Last NUREG-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWel
- 10. Reason For Restrictions, If any:
This Month yr.-to-Date Cusulative
- 11. Hours in Reporting Period 744.0 5111.0 87240.0
- 12. Nusber Of Hours Reactor Was Critical 744.0 4868.3. 69034.5
- 17. Reactor Reserve Shutdown Hours --0-- --0-- --0--
- 14. Hours Generator On-Line 744.0 4830.1 67967.7
- 15. Unit Reserve Shutdown Hours --0-- --0-- --0--
- 16. Gross Thereal Energy Benerated (MWH) 2531467 16292540 219709078
- 17. Gross Electrical Energy Generated (MWH) 899825 582126! 77925628
- 18. Net Elutrical Energy Generated (MWHi B53452 5522785 73435042
- 19. Unit Service Factor 100.0 94.5 77.9
- 20. Unit Availability factor 100.0 94.5 77.9
- 21. Unit Capacity Factor (Using MDC Net! 101.6 95.7 74.4
- 22. Unit Capacity Factor (Using DER Net) 100.2 94.4 73.5
- 23. !! nit Forced Outage Rate 0.0 5.5 B.7
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period.' Esticated Date of Startup
- 26. Units in Test Status (Prior to Coseercia! Operation)
- Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION j
=
l
\
OPERATING DATA REPORT DOCKET NO 50-414 UNIT Catawba 2 DATE Auaust 15. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346 MONTH hiv.1996 E41 AVERASE DAILY F0WER LEVEL DE AVERAGE DAILY F0WER LEVEL (MWe-Net! IMWe-Neti i 1144 17 1146 2 !!43 IB !!43 3 !!50 19 1144 4 !!$7 20 !!45 5 1154 21 1148 6 !!50 22 !!42 7 !!48 23 1141 B 1146 24 1143 9 1147 25 1145 10 !!52 26 1150 11 !!53 27 1150 12 !!51 28 1149 13 1148 29 1149 14 !!45 30 1145 15 1145 31 !!45 16 1145 l
t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 ,
UNIT NAME CArawtsa z DATE ue/id/96 REPORT MONTH July 1996 COMPLETED BY x. A. Williams TELEPHONE tfusi-362-d346 (1) (2) (3) (4) (5)
R MET- .
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulato W Restriction 4-Other (Explain) File ( M EG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
. . - _ _ . . . - . . . . . . . . . - _ _ - . . . ......~.. ..- - . . . - .- .- - . . - _ - -
a , a 3
DOCKET: 50-414 ,
UNIT: Catawba 2 i
5 Date: 08/15/%
l i
i NARRATIVE
SUMMARY
f MONTH: July,1996
- Catawba Unit 2 began the month of July operating at 100% full power. The unit operated at or near 100% i full power for the entire month.
t i
i 4
)
1 I
l 1
1 4
l i
Prepared by : R. A. Williams Telephone. (704)- 382-5346
I 1
i l
l MONTHLY REFUELING INFORMATION REOUEST i- 1. Facility name: Catawba. Unit 2 2.- Scheduled next refueling shutdown: March 1997
- 3. Scheduled restart following refueling: April 1997 i
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l
- THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
]
i 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). ,
- 7. Number of Fuel assemblies (a) in the core: 19)_
(b) in the spent fuel pool: 524 2
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity: )
September 2011
)
i DUKE POWER COMPANY DATE: August 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
-.