Revised Monthly Operating Rept for May 1992 for Point Beach Nuclear Plant,Unit 1
ML20116M432
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/31/1992
From: Peterson D
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20116M425 List:
References
NUDOCS 9211200268
Download: ML20116M432 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _

oooREVISED*oo OPERATING DATA REPORT DOCKET No. 50-266 DATE: Jane 2, 1992 COMPLETED BY: Don C.

Peterson M4h TELEPHONE:

414-755-2321 Ext. 361

'{

OPERATING STATUS

> c, -

1. UNIT NAME: POINT BEACH NUCLPAR PLANT - UNIT 1 NOTES O&
2. REPORTING PERIOD: May - 1992 FCD
3. LICENSED THERMAL POWER (MWT):

1518.5 O4

4. NAMEPLAT2 RATING'(GROSS MWE):

523.8 p3 g

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0 To-

6. MAXIMUM D F 'ABLE CAPACITY (GROSS MWE):

509.0.

(('

-.7. MAXIMUM dei'.DABLE CAPACITY (NET MWE):

485.0

8. IF CHANGES OCCUR IN.CAfACITY' RATINGS
  • ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TG WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MONTH YEAR TO LATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 3,647.0 189,071.0

[

12. NUMBER OF HOURS REACTOR WAS CRITICAL 29.0 2,460.3 155,850.8 i '
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 2.4 655.1
14. HOURS GENERATOR ON LINE O.0 2,428.9 152,857.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH)

O 3,637,967 214,287,970

17. GROSS ELECTRICAL ENERGY GENERATED.

O 1,249,950 72,353,680 18.. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,193,214 68,942,987 l

19. UNIT SERVICE FACTOR O.0%

66.6%

80.8%

20. UNIT AVAILABILITY FACTOR O.0%

66.6%

Bl.3%

21. UNIT CAPACITY FACTOR (USING MDC. NET) 0.0%

67.5%

74.8s

'22. UNIT CAPACITY FACTOR (USING DER NET) 0.0%

65.81k 73.4%

23. UNIT FORCED OUTAGE RATE-0.0%

0.0%

1.7s

24. SHUTDOWNS. SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None 25.'IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

June 6, 1992 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC L N-R DATED SEPTEMBER 22, 1977 1