ML20116K514
| ML20116K514 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/31/1992 |
| From: | Cottle W, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00138, GNRO-92-138, NUDOCS 9211170238 | |
| Download: ML20116K514 (5) | |
Text
..
.4~
W ENTERGY I"'i.", " ? * "*"', ' '"
4
_n t,
i i
finvembe r l '.. 1992 w.1r. costle U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555 Attention: Document Control Desk Subject :
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPf-29 Monthly Operating Report GNRO-92/00138 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10 Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1992.
If you have any questions or require additional information, please contact this office.
Yours truly, wr/~~cxxxc WIC/TMC/cg attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Power Reductions cc:
(See next page) 9211170238 921031 PDR ADOCK 05000416 R
/
MOOPSEP - 1
,)\\
I k
November 11, 1992 GNRO-92/00138 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. J. L. Mathis (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a) i Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 t
Mr. P. W. O'Connor, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail'Stop 13H3-Washington, D.C.
20555 r
M00PSEP 2-3 P'
y e
~
3.-
pp,.,
+
,9.g%-..,w,p..,u w,g,
Attachment I to GNRO-92/00138 DOCKET NO.
50-416 DATE 11/04/92
~Tliol)437ghtery L. F. Dau COMPLETED BY dT4 TELEPHONE OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 Notes:
2.
Reporting Period: October 1992 3.
Licensed Thermal Power (MWT): 3833 MRT 4.
Nameplate Rating (Gross MWE): U M.5 MWE 5.
Design Electrical Rating (Net HWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE Maximum Dependable Capacity (Net MWe)(: items Number 3 Through 7) Since Last Repo 1143 MWE 7.
If Changes Occur in Capacity Ratings 8.
Give Reasons:
N/A (Net MWe):
N/A Power Level To Which Restricted, in Any /A 9.10. Reasons for Restrictions, If Any:
N 1his Month Yr to Date Cumulative
- 11. Hours in Reporting Period 745 7,320 70 432 1
- 12. Number of Hours Reactor Was Critical 745.0 5,BBEU 7,0HEI
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 745.0 5.699.3 53,749.7
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 7,617,766 20,942,522 186,665,716
- 17. Gross Electrical Energy Generated (MWH) 909,625 6,689,097 59 259 202 a
- 18. Net Electrical Energy Generated (MWH) 873,930 6,418,0Y5
, 78,7TD
- 19. Unit Service factor 100.0
-77.9 7BTl
~
- 20. Unit Availability factor 100.0 77.9 78.8-
- 21. Unit Capacity factor (Using MDC Net) 102.6 76.7 75.2
- 22. Unit Capacity factor (Using DER Net) 9TB 70.1 68.2
- 23. Unit forced Outage Rate 0.0 5.9 6.4
- 24. Shutdowns-Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period.
Estimated Date o IStartup:
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/86 M00PSEP/SCMPFLR
to GNRO-92/00138 DOCKET NO.
50-416 UNIT 1
DATE 11/04/92 COMPLETED BY L. F. Daughtery_
TELEPHONE 10,1-437-2334 MONTH October 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEi.
(MWe-Net)
(HWe-Net) 1 1192 17 1196 2
1192 18 1194 3
928 19 1204 4
1063 20 1196 5
1187 21 1190 6
1186 22 1186 7
1189 23 1189 8
1171 24 1185 9
1197 25 1184 10 1180 26 1184 11 1194 27 1110 12 1196 28 1189 13 1186 29 1189 14 1184 30 1185 15 1183 31 1172 16 1182 N/A F-
'MOOPSEP/SCMPFLR
.r -to GNRO-92/p0'138' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME 1
-i DATE 11/04/92 COMPLETED BY L. F. Daughtery i
TELEPHONE 601-437-2334
. REPORT MONTH October 1992 7
l l
l
-l l
l Method of l Licensee l
l l
Cause & Corrective l
-l,No. ] Date l Type l Duration l Reason JShutting Down!
Event l System lCorponent [
Action To l
l
-l l (1)- l Hours 'l (2) l Reactor l Report !
l Code l Code l
Prevent Recurrence j
- l l
l l
l (3) i I
(4) l (5) 1 (C&CA) l l
I i
-l-l 1
1 192-l10/03/92)
S l 32.9 l
B i
5 l
N/A
] N/A l
N/A
[Rx thermal power reduction to l
l008 'l l'
l l
l l
l lapproximately 65% for control rod l l
j.
l l
l l
l l
l lsequence exchange l
IJ l
i I
i I
i i
l i
i I
'l I
I I
I I
I I
I l
1 I
i I
I I
I I
i I
Ll-l-
1 I
I l
_i i
i l
l-UNIT SHUIDOWd5 AND POWER REDUCTIONS 1
2 3
4 F: Forced Reason:-
Method:
Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain)
M00PSEP/SCMPFLR-
-