Monthly Operating Rept for Oct 1992 for Grand Gulf Nuclear Power Station,Unit 1
ML20116K514
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/31/1992
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-92-00138, GNRO-92-138, NUDOCS 9211170238
Download: ML20116K514 (5)


Text

..

.4~

W ENTERGY I"'i.", " ? * "*"', ' '"

4

_n t,

i i

finvembe r l '.. 1992 w.1r. costle U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555 Attention: Document Control Desk Subject :

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPf-29 Monthly Operating Report GNRO-92/00138 Gentlemen:

In accordance with the requirement of Technical Specification 6.9.1.10 Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for October 1992.

If you have any questions or require additional information, please contact this office.

Yours truly, wr/~~cxxxc WIC/TMC/cg attachments:

1.

Operating Status 2.

Average Daily Power Level 3.

Unit Shutdowns and Power Reductions cc:

(See next page) 9211170238 921031 PDR ADOCK 05000416 R

PDR

/

MOOPSEP - 1

,)\\

I k

November 11, 1992 GNRO-92/00138 Page 2 of 3 cc:

Mr. D. C. Hintz (w/a)

Mr. J. L. Mathis (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a) i Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 t

Mr. P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail'Stop 13H3-Washington, D.C.

20555 r

M00PSEP 2-3 P'

y e

~

3.-

pp,.,

+

,9.g%-..,w,p..,u w,g,

Attachment I to GNRO-92/00138 DOCKET NO.

50-416 DATE 11/04/92

~Tliol)437ghtery L. F. Dau COMPLETED BY dT4 TELEPHONE OPERATING STATUS 1.

Unit Name: GGNS UNIT 1 Notes:

2.

Reporting Period: October 1992 3.

Licensed Thermal Power (MWT): 3833 MRT 4.

Nameplate Rating (Gross MWE): U M.5 MWE 5.

Design Electrical Rating (Net HWe): 1250 MWE 6.

Maximum Dependable Capacity (Gross MWe): 1190 MWE Maximum Dependable Capacity (Net MWe)(: items Number 3 Through 7) Since Last Repo 1143 MWE 7.

If Changes Occur in Capacity Ratings 8.

Give Reasons:

N/A (Net MWe):

N/A Power Level To Which Restricted, in Any /A 9.10. Reasons for Restrictions, If Any:

N 1his Month Yr to Date Cumulative

11. Hours in Reporting Period 745 7,320 70 432 1
12. Number of Hours Reactor Was Critical 745.0 5,BBEU 7,0HEI
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 745.0 5.699.3 53,749.7
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 7,617,766 20,942,522 186,665,716
17. Gross Electrical Energy Generated (MWH) 909,625 6,689,097 59 259 202 a
18. Net Electrical Energy Generated (MWH) 873,930 6,418,0Y5

, 78,7TD

19. Unit Service factor 100.0

-77.9 7BTl

~

20. Unit Availability factor 100.0 77.9 78.8-
21. Unit Capacity factor (Using MDC Net) 102.6 76.7 75.2
22. Unit Capacity factor (Using DER Net) 9TB 70.1 68.2
23. Unit forced Outage Rate 0.0 5.9 6.4
24. Shutdowns-Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End of Report Period.

Estimated Date o IStartup:

26. Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/86 M00PSEP/SCMPFLR

to GNRO-92/00138 DOCKET NO.

50-416 UNIT 1

DATE 11/04/92 COMPLETED BY L. F. Daughtery_

TELEPHONE 10,1-437-2334 MONTH October 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEi.

(MWe-Net)

(HWe-Net) 1 1192 17 1196 2

1192 18 1194 3

928 19 1204 4

1063 20 1196 5

1187 21 1190 6

1186 22 1186 7

1189 23 1189 8

1171 24 1185 9

1197 25 1184 10 1180 26 1184 11 1194 27 1110 12 1196 28 1189 13 1186 29 1189 14 1184 30 1185 15 1183 31 1172 16 1182 N/A F-

'MOOPSEP/SCMPFLR

.r -to GNRO-92/p0'138' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME 1

-i DATE 11/04/92 COMPLETED BY L. F. Daughtery i

TELEPHONE 601-437-2334

. REPORT MONTH October 1992 7

l l

l

-l l

l Method of l Licensee l

l l

Cause & Corrective l

-l,No. ] Date l Type l Duration l Reason JShutting Down!

Event l System lCorponent [

Action To l

l

-l l (1)- l Hours 'l (2) l Reactor l Report !

l Code l Code l

Prevent Recurrence j

l l

l l

l (3) i I

(4) l (5) 1 (C&CA) l l

I i

-l-l 1

1 192-l10/03/92)

S l 32.9 l

B i

5 l

N/A

] N/A l

N/A

[Rx thermal power reduction to l

l008 'l l'

l l

l l

l lapproximately 65% for control rod l l

j.

l l

l l

l l

l lsequence exchange l

IJ l

i I

i I

i i

l i

i I

'l I

I I

I I

I I

I l

1 I

i I

I I

I I

i I

Ll-l-

1 I

I l

_i i

i l

l-UNIT SHUIDOWd5 AND POWER REDUCTIONS 1

2 3

4 F: Forced Reason:-

Method:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load E-Operator Training &

6-Other Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source (Explain)

H-Other (Explain)

M00PSEP/SCMPFLR-

-